-
3
-
-
0002116344
-
Optimization by mean field annealing
-
Touretzky, D. S. (ed.), Morgan Kaufmann, San Mateo, CA
-
Bilbro, G., Mann, R., Miller, T. K., Synder, W. E., Van den Bout, D. E. and White, M. (1989) Optimization by mean field annealing, in Advances in Neural Information Processing Systems I, Touretzky, D. S. (ed.), Morgan Kaufmann, San Mateo, CA, pp. 91-98.
-
(1989)
Advances in Neural Information Processing Systems I
-
-
Bilbro, G.1
Mann, R.2
Miller, T.K.3
Synder, W.E.4
Van Den Bout, D.E.5
White, M.6
-
4
-
-
0026376478
-
Scheduling of project networks by job assignment
-
Drexl, A. (1991) Scheduling of project networks by job assignment. Management Science, 37(12), 1590-1602.
-
(1991)
Management Science
, vol.37
, Issue.12
, pp. 1590-1602
-
-
Drexl, A.1
-
5
-
-
0000999440
-
Learning and relearning in Boltzmann machines
-
Rumelhart, D. E. and McClelland, J. L. (eds), MIT Press, Cambridge, MA
-
Hinton, G. E. and Sejnowski, T. J. (1986) Learning and relearning in Boltzmann machines, in Parallel Distributed Processing, Vol. 1, Rumelhart, D. E. and McClelland, J. L. (eds), MIT Press, Cambridge, MA, pp. 282-317.
-
(1986)
Parallel Distributed Processing
, vol.1
-
-
Hinton, G.E.1
Sejnowski, T.J.2
-
6
-
-
0021835689
-
'Neural' computation of decisions in optimization problems
-
Hopfield, J. J. and Tank, D. W. (1985) 'Neural' computation of decisions in optimization problems. Biological Cybernetics, 52, 141-152.
-
(1985)
Biological Cybernetics
, vol.52
, pp. 141-152
-
-
Hopfield, J.J.1
Tank, D.W.2
-
7
-
-
26644473326
-
Production scheduling in a leitstand system using a neural-net approach
-
Balagurusamy, E. and Sushila, B. (eds), Tata McGraw-Hill, New Delhi
-
Kurbel, K. (1993) Production scheduling in a leitstand system using a neural-net approach, in Artificial Intelligence Technology - Applications and Management, Balagurusamy, E. and Sushila, B. (eds), Tata McGraw-Hill, New Delhi, pp. 297-305.
-
(1993)
Artificial Intelligence Technology - Applications and Management
-
-
Kurbel, K.1
-
8
-
-
26644433312
-
Parallelization of hybrid simulated annealing and genetic algorithm for short-term production scheduling
-
Zhong, B. (ed.), Southeast University Press, Nanjing, China
-
Kurbel, K., Schneider, B. and Singh, K. (1995) Parallelization of hybrid simulated annealing and genetic algorithm for short-term production scheduling, in Proceedings of International Conference on Intelligence, Knowledge and Integration for Manufacturing, Zhong, B. (ed.), Southeast University Press, Nanjing, China, pp. 321-326.
-
(1995)
Proceedings of International Conference on Intelligence, Knowledge and Integration for Manufacturing
-
-
Kurbel, K.1
Schneider, B.2
Singh, K.3
-
9
-
-
26644459866
-
Parallel recombinative simulating annealing: A genetic algorithm
-
Department of General Engineering, University of Illinois
-
Mahfoud, W. S. and Goldberg, D. E. (1992) Parallel recombinative simulating annealing: a genetic algorithm, in Technical Report No. 92002, Department of General Engineering, University of Illinois.
-
(1992)
Technical Report No. 92002
-
-
Mahfoud, W.S.1
Goldberg, D.E.2
-
11
-
-
0020193734
-
Resource-constrained project scheduling with time-resource: The nonpreemptive tradeoffs case
-
Talbot, F. (1982) Resource-constrained project scheduling with time-resource: the nonpreemptive tradeoffs case. Management Science, 28(10), 1197-1210.
-
(1982)
Management Science
, vol.28
, Issue.10
, pp. 1197-1210
-
-
Talbot, F.1
|