메뉴 건너뛰기




Volumn 4, Issue , 2001, Pages 3326-3331

Optimal Scheduling techniques for cluster tools with process-module and transport-module residency constraints

Author keywords

[No Author keywords available]

Indexed keywords

HEURISTIC METHODS; LINEAR PROGRAMMING; SCHEDULING; SEMICONDUCTOR DEVICE MANUFACTURE;

EID: 0034868412     PISSN: 10504729     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (4)

References (13)
  • 10
    • 0000402860 scopus 로고
    • The minimum common-cycle algorithm for cyclic scheduling of two materila handling hoist with time window constraints
    • (1991) Management Science , vol.37 , pp. 1629-1639
    • Lei, L.1    Wang, T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.