-
2
-
-
0024748492
-
DAR-EL
-
CARMON, T. F MAIMÓN, O. Z., and DAR-EL, E. M., 1989, Group set-up for printed circuit board assembly.International Journal of Production Research, 27, 1795-1810.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1795-1810
-
-
Carmon Maimón, T.F.E.M.1
-
3
-
-
0010490924
-
Work flow control in the flexible flow line
-
DEANE, R. H., and MOON, S. H., 1992, Work flow control in the flexible flow line. InternationalJournal of Flexible Manufacturing Systems, 4, 217-235.
-
(1992)
Internationaljournal of Flexible Manufacturing Systems
, vol.4
, pp. 217-235
-
-
Deane, R.H.1
Moon, S.H.2
-
4
-
-
0011750526
-
Design and scheduling of flexible assembly lines for printed circuit boards
-
DESSOUKY, M. M., ADIGA, S., and PARK, K-, 1995, Design and scheduling of flexible assembly lines for printed circuit boards. InternationalJournal of Production Research, 33, 757-775.
-
(1995)
Internationaljournal of Production Research
, vol.33
, pp. 757-775
-
-
Dessouky, M.M.1
Adiga, S.2
Park, K.3
-
5
-
-
85008805732
-
(McGraw-Hill, New York)
-
HILLIER, F. S., and LiEBERMAN, G. J., 1990, Introduction to Operations Research (McGraw-Hill, New York).
-
(1990)
-
-
Hillier, F.S.G.J.1
-
6
-
-
0041665541
-
Engineering a circuit board assembly line for a desired capacity and Flowtime
-
JOHRI, P. K., 1991, Engineering a circuit board assembly line for a desired capacity and Flowtime.journal of Manufacturing Systems, 10, 492-500.
-
(1991)
Journal of Manufacturing Systems
, vol.10
, pp. 492-500
-
-
Johri, P.K.1
-
7
-
-
0023562034
-
Heuristic methods for flexible flow line scheduling
-
KOCHHAR, S., AND MORRIS, R.J.T., 1987, Heuristic methods for flexible flow line scheduling.journal of Manufacturing Systems, 6, 299-314.
-
(1987)
Journal of Manufacturing Systems
, vol.6
, pp. 299-314
-
-
Kochhar, S.1
Morris, R.J.T.2
-
8
-
-
0027628169
-
CONTINGENCIES FOR THE DESIGN OF SCHEDULING EXPERT SYSTEMS
-
LEE, J. K., SUH, M. S., AND FOX, M. S., 1993, CONTINGENCIES FOR THE DESIGN OF SCHEDULING EXPERT SYSTEMS. Expert Systems With Applications, 6, 219-230.
-
(1993)
Expert Systems with Applications
, vol.6
, pp. 219-230
-
-
Lee, J.K.1
Suh, M.S.2
Fox, M.S.3
-
9
-
-
0000264129
-
TOVEY
-
LOEGREN, C. B. MCGINNIS, L. F., and TOVEY, C. A., 1991, Routing printed circuit cards through an assembly cell. Operations Research, 39, 992-1004.
-
(1991)
Operations Research
, vol.39
, pp. 992-1004
-
-
Loegren Mcginnis, C.B.C.A.1
-
10
-
-
0026190082
-
Grouping methods for printed circuit board assembly
-
MAIMÓN, O., AND SHTUB, A., 1991, Grouping methods for printed circuit board assembly. International Journal of Production Research, 29, 1379- 1390.
-
(1991)
International Journal of Production Research, 29, 1379
, pp. 1390
-
-
Maimón, O.1
Shtub, A.2
-
11
-
-
0026238169
-
Constraint-based control of flexible flow lines
-
RABIN, S., and NAGEL, R. N., 1991, Constraint-based control of flexible flow lines. International Journal of Production Research, 29, 1941-1951.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1941-1951
-
-
Rabin, S.1
Nagel, R.N.2
-
13
-
-
0024016313
-
An adaptable scheduling algorithm for flexible flow lines
-
WlTTROCK, R. J., 1988, An adaptable scheduling algorithm for flexible flow lines. Operations Research, 36, 445-453.
-
(1988)
Operations Research
, vol.36
, pp. 445-453
-
-
Wittrock, R.J.1
|