메뉴 건너뛰기




Volumn 7, Issue 4, 1996, Pages 430-438

Job route selection model for workload balancing between workstations in flexible flow line

Author keywords

Flexible flow line; Heuristic search; Job route selection; Workload balancing

Indexed keywords

ALGORITHMS; FLEXIBLE MANUFACTURING SYSTEMS; MATHEMATICAL MODELS; OPERATIONS RESEARCH; OPTIMIZATION; PRODUCTIVITY;

EID: 0030196199     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537289608930371     Document Type: Article
Times cited : (7)

References (13)
  • 4
    • 0011750526 scopus 로고
    • Design and scheduling of flexible assembly lines for printed circuit boards
    • DESSOUKY, M. M., ADIGA, S., and PARK, K-, 1995, Design and scheduling of flexible assembly lines for printed circuit boards. InternationalJournal of Production Research, 33, 757-775.
    • (1995) Internationaljournal of Production Research , vol.33 , pp. 757-775
    • Dessouky, M.M.1    Adiga, S.2    Park, K.3
  • 5
    • 85008805732 scopus 로고
    • (McGraw-Hill, New York)
    • HILLIER, F. S., and LiEBERMAN, G. J., 1990, Introduction to Operations Research (McGraw-Hill, New York).
    • (1990)
    • Hillier, F.S.G.J.1
  • 6
    • 0041665541 scopus 로고
    • Engineering a circuit board assembly line for a desired capacity and Flowtime
    • JOHRI, P. K., 1991, Engineering a circuit board assembly line for a desired capacity and Flowtime.journal of Manufacturing Systems, 10, 492-500.
    • (1991) Journal of Manufacturing Systems , vol.10 , pp. 492-500
    • Johri, P.K.1
  • 8
    • 0027628169 scopus 로고
    • CONTINGENCIES FOR THE DESIGN OF SCHEDULING EXPERT SYSTEMS
    • LEE, J. K., SUH, M. S., AND FOX, M. S., 1993, CONTINGENCIES FOR THE DESIGN OF SCHEDULING EXPERT SYSTEMS. Expert Systems With Applications, 6, 219-230.
    • (1993) Expert Systems with Applications , vol.6 , pp. 219-230
    • Lee, J.K.1    Suh, M.S.2    Fox, M.S.3
  • 9
    • 0000264129 scopus 로고
    • TOVEY
    • LOEGREN, C. B. MCGINNIS, L. F., and TOVEY, C. A., 1991, Routing printed circuit cards through an assembly cell. Operations Research, 39, 992-1004.
    • (1991) Operations Research , vol.39 , pp. 992-1004
    • Loegren Mcginnis, C.B.C.A.1
  • 13
    • 0024016313 scopus 로고
    • An adaptable scheduling algorithm for flexible flow lines
    • WlTTROCK, R. J., 1988, An adaptable scheduling algorithm for flexible flow lines. Operations Research, 36, 445-453.
    • (1988) Operations Research , vol.36 , pp. 445-453
    • Wittrock, R.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.