메뉴 건너뛰기




Volumn 32, Issue 7, 2000, Pages 599-611

Production flow control in a cell with groups of identical machines

Author keywords

[No Author keywords available]

Indexed keywords

JUST IN TIME PRODUCTION; MATHEMATICAL MODELS; MAXIMUM PRINCIPLE; NUMERICAL ANALYSIS; OPTIMIZATION; PROCESS CONTROL; SCHEDULING;

EID: 0033741749     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1007654931747     Document Type: Article
Times cited : (2)

References (15)
  • 4
    • 0002238482 scopus 로고
    • Development of a science base for planning and scheduling manufacturing systems
    • Austin, TX. Society of Manufacturing Engineers, Dearborn, MI
    • Caramanis, M., Sharifnia, A., Hu, J. and Gershwin, S. (1991) Development of a science base for planning and scheduling manufacturing systems, in Proceedings of the 1991 NSF Design and Manufacturing Systems Conference, Austin, TX. Society of Manufacturing Engineers, Dearborn, MI. pp. 27-40.
    • (1991) Proceedings of the 1991 NSF Design and Manufacturing Systems Conference , pp. 27-40
    • Caramanis, M.1    Sharifnia, A.2    Hu, J.3    Gershwin, S.4
  • 5
    • 0020915621 scopus 로고
    • An algorithm for the computer control of a flexible manufacturing system
    • Kimemia, J.G. and Gershwin, S.B. (1983) An algorithm for the computer control of a flexible manufacturing system. IIE Transactions, 15(4), 353-362.
    • (1983) IIE Transactions , vol.15 , Issue.4 , pp. 353-362
    • Kimemia, J.G.1    Gershwin, S.B.2
  • 6
    • 0023978351 scopus 로고
    • Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines
    • Maimon, O.Z. and Gershwin, S.B. (1988) Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines. Operations Research, 36(2), 279-292.
    • (1988) Operations Research , vol.36 , Issue.2 , pp. 279-292
    • Maimon, O.Z.1    Gershwin, S.B.2
  • 7
    • 0024611210 scopus 로고
    • Stable, distributed, real-time scheduling of flexible manufacturing/assembly/ disassembly
    • Perkins, J.R. and Kumar, P.R. (1989) Stable, distributed, real-time scheduling of flexible manufacturing/assembly/ disassembly. IEEE Transactions on Automatic Control, 3-4(2), 139-148.
    • (1989) IEEE Transactions on Automatic Control , vol.3-4 , Issue.2 , pp. 139-148
    • Perkins, J.R.1    Kumar, P.R.2
  • 10
    • 0028464640 scopus 로고
    • Necessary optimality conditions for a generalized problem of production scheduling
    • Khmelnitsky, E. and Kogan, K. (1994) Necessary optimality conditions for a generalized problem of production scheduling. Optimal Control Applications and Methods, 15, 215-222.
    • (1994) Optimal Control Applications and Methods , vol.15 , pp. 215-222
    • Khmelnitsky, E.1    Kogan, K.2
  • 11
    • 0000149356 scopus 로고    scopus 로고
    • An optimal control model for continuous-time production and setup scheduling
    • Kogan, K. and Khmelnitsky, E. (1996) An optimal control model for continuous-time production and setup scheduling. International Journal of Production Research, 34(3), 715-725.
    • (1996) International Journal of Production Research , vol.34 , Issue.3 , pp. 715-725
    • Kogan, K.1    Khmelnitsky, E.2
  • 12
    • 33749880661 scopus 로고
    • Periodic proving of tooling at Sikorsky Aircraft
    • Boston University, 15 St Mary's Street, Boston, MA 02215
    • Epstein, R., Kaluczky, S., Waters, R. and Fraser, H. (1995) Periodic proving of tooling at Sikorsky Aircraft. Capstone Report, Boston University, 15 St Mary's Street, Boston, MA 02215.
    • (1995) Capstone Report
    • Epstein, R.1    Kaluczky, S.2    Waters, R.3    Fraser, H.4
  • 13
    • 33749938047 scopus 로고    scopus 로고
    • A time-decomposition method for sequence-dependent setup scheduling under pressing demand conditions
    • in the press
    • Khmelnitsky, E., Kogan, K. and Maimon, O. (1999) A time-decomposition method for sequence-dependent setup scheduling under pressing demand conditions. IEEE Transactions on Automatic Control, (in the press).
    • (1999) IEEE Transactions on Automatic Control
    • Khmelnitsky, E.1    Kogan, K.2    Maimon, O.3
  • 14
    • 0029324375 scopus 로고
    • A survey of the maximum principles for optimal control problems with state constraints
    • Hartl, R.F., Sethi, S.P. and Vickson, R.G. (1995) A survey of the maximum principles for optimal control problems with state constraints. SIAM Review, 37(2), 181-218.
    • (1995) SIAM Review , vol.37 , Issue.2 , pp. 181-218
    • Hartl, R.F.1    Sethi, S.P.2    Vickson, R.G.3
  • 15
    • 0029378793 scopus 로고
    • A maximum principle based method for scheduling in a flexible manufacturing system
    • Khmelnitsky, E., Kogan, K. and Maimon, O. (1995) A maximum principle based method for scheduling in a flexible manufacturing system. Discrete Event Dynamic Systems, 5, 343-355.
    • (1995) Discrete Event Dynamic Systems , vol.5 , pp. 343-355
    • Khmelnitsky, E.1    Kogan, K.2    Maimon, O.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.