메뉴 건너뛰기




Volumn 7, Issue 6, 1996, Pages 604-614

Capacity management through lagrangean relaxation: An application to tyres production

Author keywords

Capacity planning; Decomposition methods; La grangean relaxation; Tyre production

Indexed keywords

DECISION MAKING; FLEXIBLE MANUFACTURING SYSTEMS; HIERARCHICAL SYSTEMS; LAGRANGE MULTIPLIERS; MATHEMATICAL MODELS; PLANNING; RESOURCE ALLOCATION; TIRE INDUSTRY;

EID: 0030284990     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537289608930394     Document Type: Article
Times cited : (6)

References (30)
  • 2
    • 0019590377 scopus 로고
    • HIERARCHICAL PRODUCTION PLANNING: A SINGLE STAGE SYSTEM
    • BITRAN, G. R., HAAS, E. A., and HAX, A. C., 1981a. HIERARCHICAL PRODUCTION PLANNING: A SINGLE STAGE SYSTEM. Operations Research, 29
    • (1981) Operations Research , pp. 29
    • Bitran, G.R.1    Haas, E.A.2    Hax, A.C.3
  • 3
    • 0020103083 scopus 로고
    • Hierarchical production planning: A two stage system
    • BITRAN, G. R., HAAS, E. A., and HAX, A. C., 1981b, Hierarchical production planning: a two stage system. Operations Research, 30, 232-251.
    • (1981) Operations Research , vol.30 , pp. 232-251
    • Bitran, G.R.1    Haas, E.A.2    Hax, A.C.3
  • 5
  • 7
    • 0002474498 scopus 로고
    • Close the marketing/manufacturing gap
    • CRITTENDEN, V. L., 1992, Close the marketing/manufacturing gap. Sloan Management Review, 33, 41-52.
    • (1992) Sloan Management Review , vol.33 , pp. 41-52
    • Crittenden, V.L.1
  • 8
    • 0024701172 scopus 로고
    • Simultaneous resources scheduling to minimize weighted flow times
    • DOBSON, G., and KARMARKAR, U. S., 1989, Simultaneous resources scheduling to minimize weighted flow times. Operations Research, 37, 592-600.
    • (1989) Operations Research , vol.37 , pp. 592-600
    • Dobson, G.1    Karmarkar, U.S.2
  • 9
    • 0012501431 scopus 로고
    • Optimal programming of lot-sizes, inventory and labor allocation
    • DZIELINSKI, B. P., and GOMORY, R. E., 1965, Optimal programming of lot-sizes, inventory and labor allocation. Management Science, 11, 874-890.
    • (1965) Management Science , vol.11 , pp. 874-890
    • Dzielinski, B.P.1    Gomory, R.E.2
  • 10
    • 0019477279 scopus 로고
    • The Lagrangean relaxation method for solving integer programming problems
    • FISHER, M. L., 1981, The Lagrangean relaxation method for solving integer programming problems. Management Science, 27, 1-18.
    • (1981) Management Science , vol.27 , pp. 1-18
    • Fisher, M.L.1
  • 12
    • 0028516896 scopus 로고
    • Capacity analysis in repetitive assemble-to-order manufacturing systems
    • FUMERO, F., and VERCELUS, C., 1994, Capacity analysis in repetitive assemble-to-order manufacturing systems. European Journal of Operational Research, 74, 204-215.
    • (1994) European Journal of Operational Research , vol.74 , pp. 204-215
    • Fumero, F.1    Vercelus, C.2
  • 13
    • 0002554041 scopus 로고
    • Lagrangean relaxation for integer programming
    • GEOFFRION, A. M., 1974, Lagrangean relaxation for integer programming. Mathematical Programming Study, 2, 82-114.
    • (1974) Mathematical Programming Study , vol.2 , pp. 82-114
    • Geoffrion, A.M.1
  • 14
    • 0014856641 scopus 로고
    • Planning tire production
    • GORENSTEIN, S., 1970, Planning tire production. Management Science, 17, B72-B82.
    • (1970) Management Science , vol.17 , pp. B72-B82
    • Gorenstein, S.1
  • 15
    • 0020100192 scopus 로고
    • Using Lagrangean techniques to solve hierarchical production planning problems
    • GRAVES, S. C., 1982, Using Lagrangean techniques to solve hierarchical production planning problems. Management Science, 28, 260-275.
    • (1982) Management Science , vol.28 , pp. 260-275
    • Graves, S.C.1
  • 16
    • 0023451776 scopus 로고
    • Lagrangean decomposition: A model yielding stronger Lagrangean bounds
    • GUICNARD, M., and KIM, S., 1987, Lagrangean decomposition: a model yielding stronger Lagrangean bounds. Mathematical Programming, 39, 215-228.
    • (1987) Mathematical Programming , vol.39 , pp. 215-228
    • Guicnard, M.1    Kim, S.2
  • 17
    • 0011785764 scopus 로고
    • Aggregate production planning
    • J. Moders and S. Elmaghraby (eds), V an Nostrand Reinhold, New York
    • HAX, A. C., 1978, Aggregate production planning. In J. Moders and S. Elmaghraby (eds) Handbook of Operations Research (V an Nostrand Reinhold, New York), pp. 127-172.
    • (1978) Handbook of Operations Research , pp. 127-172
    • Hax, A.C.1
  • 18
    • 0017320423 scopus 로고
    • Hierarchical integration of production planning and scheduling
    • M. A. Geisler(ed), North Holland, Amsterdam
    • HAX, A. C., and MEAL, H. C., 1975, Hierarchical integration of production planning and scheduling. In M. A. Geisler(ed) Logistics (North Holland, Amsterdam), pp. 53-69.
    • (1975) Logistics , pp. 53-69
    • Hax, A.C.1    Meal, H.C.2
  • 20
    • 0022874133 scopus 로고
    • A new Lagrangean relaxation approach to the generalized assignement problem
    • JOURNSTEN, K., and NASBERG, M., 1986, A new Lagrangean relaxation approach to the generalized assignement problem. European Journal of Operational Research. 27, 313-323.
    • (1986) European Journal of Operational Research , vol.27 , pp. 313-323
    • Journsten, K.1    Nasberg, M.2
  • 21
    • 0015095281 scopus 로고
    • An efficient algorithm for multi-item scheduling
    • LASDON, L.S., and TERJUNG, R. C., 1971, An efficient algorithm for multi-item scheduling. Operations Research, 19, 946-969.
    • (1971) Operations Research , vol.19 , pp. 946-969
    • Lasdon, L.S.1    Terjung, R.C.2
  • 22
    • 0028499648 scopus 로고
    • Robustness Measures and Robust Scheduling For Job Shop
    • LEON, V. J., WU, S. D., and STORER, R. H., 1994, Robustness Measures and Robust Scheduling For Job Shop. IIE Transactions, 26, 32-43.
    • (1994) IIE Transactions , vol.26 , pp. 32-43
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 23
    • 0001372404 scopus 로고
    • Programming of economic lot-size
    • MANNE, A. S., 1958, Programming of economic lot-size. Management Science, 4, 115-135.
    • (1958) Management Science , vol.4 , pp. 115-135
    • Manne, A.S.1
  • 24
    • 0001466208 scopus 로고
    • Putting production decisions where they belong
    • MEAL, HI C., 1984, Putting production decisions where they belong. Harvard Business Review, 62, 102-111.
    • (1984) Harvard Business Review , vol.62 , pp. 102-111
    • Meal, H.I.C.1
  • 25
    • 0016519761 scopus 로고
    • Multi-item lot-size scheduling by heuristic. Part II: With variable resources
    • NEWSON, E. F. P., 1975, Multi-item lot-size scheduling by heuristic. Part II: with variable resources. Management Science, 21, 1194-1203.
    • (1975) Management Science , vol.21 , pp. 1194-1203
    • Newson, E.F.P.1
  • 29
    • 77957088268 scopus 로고
    • Mathematical programming models and methods for production planning and scheduling
    • S. C. Graves, A. H. G. Rinnooy Kan and P. H. Zipkin, North Holland, Amsterdam
    • SHAPIRO, J. T., 1993, Mathematical programming models and methods for production planning and scheduling. In S. C. Graves, A. H. G. Rinnooy Kan and P. H. Zipkin (eds) Logistics of Production and Inventory (North Holland, Amsterdam), pp. 371-443.
    • (1993) Logistics of Production and Inventory , pp. 371-443
    • Shapiro, J.T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.