메뉴 건너뛰기




Volumn , Issue 1667, 1999, Pages 33-41

Time-dependent model for departure time and route choices in networks with queues

Author keywords

[No Author keywords available]

Indexed keywords

MATHEMATICAL MODELS; NUCLEAR BATTERIES; PROBLEM SOLVING; QUEUEING THEORY; STRATEGIC PLANNING; TRANSPORTATION ROUTES; VARIATIONAL TECHNIQUES;

EID: 0033338241     PISSN: 03611981     EISSN: None     Source Type: Journal    
DOI: 10.3141/1667-05     Document Type: Article
Times cited : (8)

References (18)
  • 2
    • 0041760963 scopus 로고    scopus 로고
    • Decomposition of the reactive dynamic assignment with queues for a many-to-many origin-destination pattern
    • Kuwahara, M., and T. Akamatsu. Decomposition of the Reactive Dynamic Assignment with Queues for a Many-to-Many Origin-Destination Pattern.Transportation Research B, Vol. 31B, No. 1, 1997, pp. 1-10.
    • (1997) Transportation Research B , vol.31 B , Issue.1 , pp. 1-10
    • Kuwahara, M.1    Akamatsu, T.2
  • 4
    • 7344248595 scopus 로고    scopus 로고
    • Discrete-time dynamic user-optimal departure time/route choice model
    • Chen, H. K., and C. F. Hsueh. Discrete-Time Dynamic User-Optimal Departure Time/Route Choice Model. Journal of Transportation Engineering, ASCE, Vol. 124, No. 3, 1998, pp. 246-254.
    • (1998) Journal of Transportation Engineering, ASCE , vol.124 , Issue.3 , pp. 246-254
    • Chen, H.K.1    Hsueh, C.F.2
  • 6
    • 0038027700 scopus 로고
    • Traffic assignment on transportation network with capacity constraints and queuing
    • Chicago, Ill.
    • Thompson, W. A., and H. J. Payne. Traffic Assignment on Transportation Network with Capacity Constraints and Queuing. Presented at the 47th National ORSA/TIMS North American Meeting, Chicago, Ill., 1975.
    • (1975) 47th National ORSA/TIMS North American Meeting
    • Thompson, W.A.1    Payne, H.J.2
  • 7
    • 0028734443 scopus 로고
    • Traffic assignment and traffic control in general freeway-arterial corridor system
    • Yang, H., and S. Yagar. Traffic Assignment and Traffic Control in General Freeway-Arterial Corridor System. Transportation Research B, Vol. 28B. No. 4, 1994, pp. 463-486.
    • (1994) Transportation Research B , vol.28 B , Issue.4 , pp. 463-486
    • Yang, H.1    Yagar, S.2
  • 9
    • 0343761948 scopus 로고    scopus 로고
    • Capacity-constrained traffic assignment in networks with residual queues
    • ASCE, forthcoming
    • Lam, W. H. K., and Y. P. Zhang. 1998. Capacity-Constrained Traffic Assignment in Networks with Residual Queues. Journal of Transportation Engineering. ASCE, forthcoming.
    • (1998) Journal of Transportation Engineering
    • Lam, W.H.K.1    Zhang, Y.P.2
  • 10
    • 0003310913 scopus 로고
    • Some theoretical aspects of road traffic research
    • London
    • Wardrop, J. G. Some Theoretical Aspects of Road Traffic Research. Proc., Institution of Civil Engineers, London, Part II, No. 1, 1957, pp. 325-378.
    • (1957) Proc., Institution of Civil Engineers , Issue.1 PART II , pp. 325-378
    • Wardrop, J.G.1
  • 11
    • 0342456613 scopus 로고
    • Dynamic network equilibrium problem formulated as an infinite variational inequality problem
    • INRETS, Paris
    • Wu, J. H. Dynamic Network Equilibrium Problem Formulated as an Infinite Variational Inequality Problem. Proc., 2nd Working Group on Urban Traffic and Transportation, INRETS, Paris, 1994.
    • (1994) Proc., 2nd Working Group on Urban Traffic and Transportation
    • Wu, J.H.1
  • 13
    • 0023396415 scopus 로고
    • A dynamic space-time network flow model for city traffic congestion
    • Zawack, D. J., and G. L. Thompson. A Dynamic Space-Time Network Flow Model for City Traffic Congestion. Transportation Science, Vol. 21, No. 3, 1987, pp. 153-162.
    • (1987) Transportation Science , vol.21 , Issue.3 , pp. 153-162
    • Zawack, D.J.1    Thompson, G.L.2
  • 14
    • 0020722522 scopus 로고
    • Nonlinear time network models in transportation analysis
    • Florian, M. Nonlinear Time Network Models in Transportation Analysis. Mathematical Programming Study, Vol. 26, 1986, pp. 167-196.
    • (1986) Mathematical Programming Study , vol.26 , pp. 167-196
    • Florian, M.1
  • 15
    • 0342890920 scopus 로고    scopus 로고
    • INRO Consultants Inc., Montreal, Canada
    • EMME12 User's Manual. INRO Consultants Inc., Montreal, Canada, 1996.
    • (1996) EMME12 User's Manual
  • 16
    • 0343761942 scopus 로고    scopus 로고
    • A PARTAN Frank-Wolfe algorithm for a sort of multi-class equilibrium assignment problem
    • Vol. 19
    • Zhang, Y. P., and W. Jiang. A PARTAN Frank-Wolfe Algorithm for a Sort of Multi-Class Equilibrium Assignment Problem. Journal of East China University of Technology, Vol. 19, No. 2, 1997, pp. 31-40.
    • (1997) Journal of East China University of Technology , Issue.2 , pp. 31-40
    • Zhang, Y.P.1    Jiang, W.2
  • 17
    • 0032001123 scopus 로고    scopus 로고
    • Queue spillovers in transportation networks with a route choice
    • Daganzo, C. F. Queue Spillovers in Transportation Networks with a Route Choice. Transportation Science, Vol. 32, No. 1, 1998, pp. 1-11.
    • (1998) Transportation Science , vol.32 , Issue.1 , pp. 1-11
    • Daganzo, C.F.1
  • 18
    • 84992594361 scopus 로고    scopus 로고
    • Modeling departure time choice for the morning peak
    • Chin, K. K. Modeling Departure Time Choice for the Morning Peak. Journal of the Institution of Engineers, Singapore, Vol. 37, No. 5, 1997, pp. 33-37.
    • (1997) Journal of the Institution of Engineers, Singapore , vol.37 , Issue.5 , pp. 33-37
    • Chin, K.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.