4
-
-
0032214506
-
Is rational decision making apropriate for management of irrigation reservoirs?
-
Bouchart FJ-C, Goulter IC (1998) Is rational decision making apropriate for management of irrigation reservoirs? Water Resour. Plann, and Manag., ASCE 124(6), 301-309
-
(1998)
Water Resour. Plann, and Manag., ASCE
, vol.124
, Issue.6
, pp. 301-309
-
-
Bouchart, F.J.-C.1
Goulter, I.C.2
-
5
-
-
84959764475
-
Economic analysis of irrigation in subhumid climate
-
Burt OR, Stauber MC (1971) Economic analysis of irrigation in subhumid climate. Am. J. Agr. Economics 53(1), 33-46
-
(1971)
Am. J. Agr. Economics
, vol.53
, Issue.1
, pp. 33-46
-
-
Burt, O.R.1
Stauber, M.C.2
-
7
-
-
0029798318
-
Major chemical accidents in industrializing countries: The socio-political amplification of risk
-
De Souza Porto MF, de Freitas CM (1996) Major chemical accidents in industrializing countries: the socio-political amplification of risk. Risk Analysis 16(1), 19-29
-
(1996)
Risk Analysis
, vol.16
, Issue.1
, pp. 19-29
-
-
De Souza Porto, M.F.1
De Freitas, C.M.2
-
9
-
-
0031103436
-
Estimating expected annual damage for levee retrofits
-
Goldman D (1997) Estimating expected annual damage for levee retrofits. Water Resour. Plann. and Manag., ASCE 123(2), 89-94
-
(1997)
Water Resour. Plann. and Manag., ASCE
, vol.123
, Issue.2
, pp. 89-94
-
-
Goldman, D.1
-
11
-
-
0030275372
-
Risk-cost framework for aquifer remediation design
-
James BR, Gwo J-P, Toran L (1996) Risk-cost framework for aquifer remediation design. Water Resour. Plann. and Manag., ASCE 122(6), 414-420
-
(1996)
Water Resour. Plann. and Manag., ASCE
, vol.122
, Issue.6
, pp. 414-420
-
-
James, B.R.1
Gwo, J.-P.2
Toran, L.3
-
13
-
-
0022680915
-
Expected utility, benefit, and loss criteria for seasonal water supply planning
-
Krzysztofowicz R (1986) Expected utility, benefit, and loss criteria for seasonal water supply planning, Water Resour. Res. 22(3), 303-312
-
(1986)
Water Resour. Res.
, vol.22
, Issue.3
, pp. 303-312
-
-
Krzysztofowicz, R.1
-
15
-
-
0022520043
-
Risk analysis for reservoir operation
-
Loaiciga HA, Marino MA (1986) Risk analysis for reservoir operation. Water Resour. Res. 22(4), 483-488
-
(1986)
Water Resour. Res.
, vol.22
, Issue.4
, pp. 483-488
-
-
Loaiciga, H.A.1
Marino, M.A.2
-
17
-
-
0039118466
-
Total system performance assessment for yucca mountain-SNL second iteration (TSPA-1993)
-
Sandia (1994) Total System Performance Assessment for Yucca Mountain-SNL Second Iteration (TSPA-1993). Sandia Report, SAND93-2675
-
(1994)
Sandia Report, SAND93-2675
-
-
Sandia1
-
18
-
-
0031187953
-
Evaluation and presentation of dam failure and flood risks
-
Thompson KD, Stedinger JR, Heath DC (1997) Evaluation and Presentation of Dam Failure and Flood Risks. Water Resour. Plann. and Manag., ASCE 123(4), 216-227
-
(1997)
Water Resour. Plann. and Manag., ASCE
, vol.123
, Issue.4
, pp. 216-227
-
-
Thompson, K.D.1
Stedinger, J.R.2
Heath, D.C.3
-
19
-
-
0025503588
-
Risks, classification of estimates, and contingency management
-
Yeo KT (1990) Risks, classification of estimates, and contingency management. Manag. in Engineering, ASCE 6(4), 458-470
-
(1990)
Manag. in Engineering, ASCE
, vol.6
, Issue.4
, pp. 458-470
-
-
Yeo, K.T.1
-
20
-
-
0040302517
-
Total system performance assessment-1993: An evaluation of the potential yucca mountain repository
-
U.S. Department of Energy (DOE) (1994) Total System Performance Assessment-1993: An Evaluation of the Potential Yucca Mountain Repository. DOE report B00000000-01717-2200-00099-Rev. 01
-
(1994)
DOE Report B00000000-01717-2200-00099-Rev. 01
-
-
|