-
1
-
-
0025477577
-
-
Using multicriteria methods in the early stages of new product development."
-
J. F. Bard, Using multicriteria methods in the early stages of new product development."J. Opérât. Res. i'oc., vol. 41, no. 4, pp. 755-766, 1990.
-
J. Opérât. Res. I'oc., Vol. 41, No. 4, Pp. 755-766, 1990.
-
-
Bard, J.F.1
-
2
-
-
84968182846
-
-
The neglect of engineering design,"
-
J. R. Dixon and M. R. Duffcy, The neglect of engineering design,"Calif. Manage. Rev., vul. 32, pp. 9-23, 1990.
-
Calif. Manage. Rev., Vul. 32, Pp. 9-23, 1990.
-
-
Dixon, J.R.1
Duffcy, M.R.2
-
3
-
-
0000867484
-
-
Design strategy and its interface with manufacturing and marketing: A conceptual framework, J.
-
J. A. Fitzsiminuns, K. Panagiotis. and D. N. Mallick. Design strategy and its interface with manufacturing and marketing: A conceptual framework, J. Opérai. Manage., vol. 10, no. 3, pp. 398-415, 1991.
-
Opérai. Manage., Vol. 10, No. 3, Pp. 398-415, 1991.
-
-
Fitzsiminuns K Panagiotis, J.A.1
Mallick, D.N.2
-
5
-
-
33747964996
-
-
Reengineering work: Don't automate, obliterate,"
-
M. Hammer, Reengineering work: Don't automate, obliterate,"Harvard Bus. Rev., vol. 90, pp. 104-112, 1990.
-
Harvard Bus. Rev., Vol. 90, Pp. 104-112, 1990.
-
-
Hammer, M.1
-
7
-
-
0008130997
-
-
An international strategic management/goal programming model for structuring global expansion decisions in the hospitality industry: The case of Eastern Europe,"
-
J. J. Huffman and M. J. Schniederjans, An international strategic management/goal programming model for structuring global expansion decisions in the hospitality industry: The case of Eastern Europe,"Int. J. Hospitality Manage., vol. 9, no. 3, pp. 175-190, 1990.
-
Int. J. Hospitality Manage., Vol. 9, No. 3, Pp. 175-190, 1990.
-
-
Huffman, J.J.1
Schniederjans, M.J.2
-
13
-
-
33747989319
-
-
Manufacturing joins design at product starting une,"
-
J. H. Mayer, Manufacturing joins design at product starting une,"Computer Design, vol. 43, pp. 19 22, 1991.
-
Computer Design, Vol. 43, Pp. 19 22, 1991.
-
-
Mayer, J.H.1
-
14
-
-
0012735836
-
-
Analysis of a multi-criteria project crashing model,"
-
L. J. Moore, B. W. Taylor, E. R. Clayton, and S. M. Lee, Analysis of a multi-criteria project crashing model,"AHE Tram., vol. 10, no. 2, pp. 163-169, 1978.
-
AHE Tram., Vol. 10, No. 2, Pp. 163-169, 1978.
-
-
Moore, L.J.1
Taylor, B.W.2
Clayton, E.R.3
Lee M, S.4
-
15
-
-
33747986439
-
-
Measuring the concurrent engineering process,'' in
-
B. Palmer, L. Korbly, and G. Trapp, Measuring the concurrent engineering process,'' in Proc. CALS Expo Conf. and Exposit., vol. 1, 1991, pp. CE67-CE75.
-
Proc. CALS Expo Conf. and Exposit., Vol. 1, 1991, Pp. CE67-CE75.
-
-
Palmer, B.1
Korbly, L.2
Trapp, G.3
-
17
-
-
33747915463
-
-
Optimization in project coordination scheduling through application of tagnchi methods,"
-
M. P. Santell, J. R. Jung, and J. C. Warner, Optimization in project coordination scheduling through application of tagnchi methods,"Proj. Manage. J., vol. 23, no. 3, pp. 5-16, 1992.
-
Proj. Manage. J., Vol. 23, No. 3, Pp. 5-16, 1992.
-
-
Santell, M.P.1
Jung, J.R.2
Warner, J.C.3
-
22
-
-
0026995660
-
-
Concurrent engineering,"
-
G. Soiilenius. Concurrent engineering,"Arm. CIRP Manufuct. Techn., vol. 41, no. 2, pp. 645-655, 1991.
-
Arm. CIRP Manufuct. Techn., Vol. 41, No. 2, Pp. 645-655, 1991.
-
-
Soiilenius, G.1
|