메뉴 건너뛰기




Volumn 6, Issue 2, 1999, Pages 123-131

New constraint-based approach for overhaul project scheduling with work space constraints

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRAINT THEORY; CRITICAL PATH ANALYSIS; HEURISTIC METHODS; INDUSTRIAL MANAGEMENT; PROJECT MANAGEMENT; RESOURCE ALLOCATION;

EID: 0032665090     PISSN: 10724761     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (12)

References (25)
  • 1
    • 0023977010 scopus 로고
    • The Shifting Bottleneck Procedure for Job Shop Scheduling
    • Adams, J., Balas, E. and Zawack, D. (1988). The Shifting Bottleneck Procedure for Job Shop Scheduling. Management Science, 34 (3): 391-401.
    • (1988) Management Science , vol.34 , Issue.3 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 0001849846 scopus 로고
    • Heuristic Algorithms for Ressource Constrained Project Scheduling: A Review and an Empirical Analysis
    • Elsevier, Amsterdam
    • Alvadez-Valdes, A. and Tamarit, J.M. (1989). Heuristic Algorithms for Ressource Constrained Project Scheduling: A Review and an Empirical Analysis. Advances in Project Scheduling, Elsevier, Amsterdam, pp. 113-134.
    • (1989) Advances in Project Scheduling , pp. 113-134
    • Alvadez-Valdes, A.1    Tamarit, J.M.2
  • 3
    • 0024012765 scopus 로고
    • Towards the Standardization of Performance Measures for Project Scheduling Heuristics
    • Badiru, A.B. (1988). Towards the Standardization of Performance Measures for Project Scheduling Heuristics. IEEE Transactions on Engineering Management, 35 (2): 82-89.
    • (1988) IEEE Transactions on Engineering Management , vol.35 , Issue.2 , pp. 82-89
    • Badiru, A.B.1
  • 4
    • 0025701919 scopus 로고
    • Some Efficient Multi-Heuristic Procedures for Resource-Constrained Project Scheduling
    • Boctor, F.F. (1990). Some Efficient Multi-Heuristic Procedures for Resource-Constrained Project Scheduling. European Journal of Operational Research, 49: 3-13.
    • (1990) European Journal of Operational Research , vol.49 , pp. 3-13
    • Boctor, F.F.1
  • 7
    • 0015725454 scopus 로고
    • Project Scheduling under Resource Constraints - Historical Review and Categorization of Procedure
    • Davis, E.W. (1973). Project Scheduling under Resource Constraints - Historical Review and Categorization of Procedure. AIIE Transactions, 12: 297-313.
    • (1973) AIIE Transactions , vol.12 , pp. 297-313
    • Davis, E.W.1
  • 8
    • 0016498438 scopus 로고
    • A Comparison of Heuristic and Optimal Solutions in Resource-Constrained Project Scheduling
    • Davis, E. W. and Patterson, J.H. (1975). A Comparison of Heuristic and Optimal Solutions in Resource-Constrained Project Scheduling. Management Science, 2 (8): 944-955.
    • (1975) Management Science , vol.2 , Issue.8 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 9
    • 0039469752 scopus 로고    scopus 로고
    • Bombardier Turned to Simulation to Validate the CF-18 Maintenance Program
    • Gharbi, A., Girard, J., Pellerin, R. and Villeneuve, L. (1997). Bombardier Turned to Simulation to Validate the CF-18 Maintenance Program. Interfaces, 27(6): 22-34.
    • (1997) Interfaces , vol.27 , Issue.6 , pp. 22-34
    • Gharbi, A.1    Girard, J.2    Pellerin, R.3    Villeneuve, L.4
  • 10
    • 0002973186 scopus 로고
    • Les Problèmes d'Ordonnancement
    • GOTHA (1993). Les Problèmes d'Ordonnancement. Recherche opérationnelle/Operations Research, 2,(1): 77-150.
    • (1993) Recherche Opérationnelle/Operations Research , vol.2 , Issue.1 , pp. 77-150
  • 11
    • 2442738300 scopus 로고
    • Overhaul and Repair Decisions
    • Pitman Publishing, University of Birmingham
    • Jardine, A.K.S. (1973). Overhaul and Repair Decisions. Maintenance, Replacement and Reliability, Pitman Publishing, University of Birmingham, pp. 117.
    • (1973) Maintenance, Replacement and Reliability , pp. 117
    • Jardine, A.K.S.1
  • 13
    • 0022148730 scopus 로고
    • Application of Zone Logic and Outfit Planning Concepts to Overhaul, Modernization, and Repair of U.S. Navy Ships
    • Moen, D. (1985). Application of Zone Logic and Outfit Planning Concepts to Overhaul, Modernization, and Repair of U.S. Navy Ships. Journal of Ship Production, 11: 238-248.
    • (1985) Journal of Ship Production , vol.11 , pp. 238-248
    • Moen, D.1
  • 14
    • 0022787783 scopus 로고
    • Two Level Heuristic for the Resource Constrained Project Constrained Scheduling
    • Norbis, M.I. and Smith, J.M. (1986). Two Level Heuristic for the Resource Constrained Project Constrained Scheduling. International Journal of Production Research, 24 (5): 1203-1219.
    • (1986) International Journal of Production Research , vol.24 , Issue.5 , pp. 1203-1219
    • Norbis, M.I.1    Smith, J.M.2
  • 15
    • 0001849846 scopus 로고
    • Heuristic Algorithms for Resource-Constrained Project Scheduling: A Review and an Empirical Analysis
    • Elsevier Science Publishers B.V., Amsterdam
    • Olaguibel, R. and Goerlich, J. (1989). Heuristic Algorithms for Resource-Constrained Project Scheduling: A Review and an Empirical Analysis. Advances in Project Scheduling, Elsevier Science Publishers B.V., Amsterdam.
    • (1989) Advances in Project Scheduling
    • Olaguibel, R.1    Goerlich, J.2
  • 17
    • 0030574808 scopus 로고    scopus 로고
    • A Note on an Iterative Forward/Backward Scheduling Technique with Preference to a Procedure by Li and Willis
    • Ozdamar, L. and Ulusoy, G. (1996). A Note on an Iterative Forward/Backward Scheduling Technique with Preference to a Procedure by Li and Willis. European Journal of Operational Research, 89 : 400-407.
    • (1996) European Journal of Operational Research , vol.89 , pp. 400-407
    • Ozdamar, L.1    Ulusoy, G.2
  • 18
    • 0029393209 scopus 로고
    • A Survey on the Resource-Constrained Project Scheduling Problem
    • Ozdamar, L. and Ulusoy, G. (1995). A Survey on the Resource-Constrained Project Scheduling Problem. IIIE Transactions, 27: 574-586.
    • (1995) IIIE Transactions , vol.27 , pp. 574-586
    • Ozdamar, L.1    Ulusoy, G.2
  • 19
    • 0027240748 scopus 로고
    • Early-Tardy Cost Trade-Offs in Resource Constrained Projects with Cash Flows : An Optimization-Guided Heuristic Approach
    • Padman, R. and Smith-Daniels, D.E. (1993). Early-Tardy Cost Trade-Offs in Resource Constrained Projects with Cash Flows : An Optimization-Guided Heuristic Approach. European Journal of Operational Research, 64: 295-311.
    • (1993) European Journal of Operational Research , vol.64 , pp. 295-311
    • Padman, R.1    Smith-Daniels, D.E.2
  • 20
    • 0016935106 scopus 로고
    • Project scheduling: The Effect of Problem Structure on Heuristic Performance
    • Patterson, J.H. (1976). Project scheduling: The Effect of Problem Structure on Heuristic Performance. Naval Research Logistics Quarterly, 23 (1): 95-123.
    • (1976) Naval Research Logistics Quarterly , vol.23 , Issue.1 , pp. 95-123
    • Patterson, J.H.1
  • 22
    • 0024613824 scopus 로고
    • Shop and Zone Administration and Management: The Transition to Zone Outfitting in Repair and Overhaul at Puget Sound Naval Shipyard
    • Sterns, A. (1989). Shop and Zone Administration and Management: The Transition to Zone Outfitting in Repair and Overhaul at Puget Sound Naval Shipyard. Journal of Ship Production, 5(1): 22-35.
    • (1989) Journal of Ship Production , vol.5 , Issue.1 , pp. 22-35
    • Sterns, A.1
  • 23
    • 0028396719 scopus 로고
    • A Onstraint-Based Perspective in Resource Constrained Project Scheduling
    • Ulusoy, G. and Özdamar, L. (1994). A Onstraint-Based Perspective in Resource Constrained Project Scheduling. International Journal of Production Research, 32 (3): 693-705.
    • (1994) International Journal of Production Research , vol.32 , Issue.3 , pp. 693-705
    • Ulusoy, G.1    Özdamar, L.2
  • 25
    • 0022107667 scopus 로고
    • Critical Path Analysis and Resource Constrained Project Scheduling - Theory and Practice
    • Willis, R.J. (1985). Critical Path Analysis and Resource Constrained Project Scheduling - Theory and Practice. European Journal of Operation Research, 2: 49-55.
    • (1985) European Journal of Operation Research , vol.2 , pp. 49-55
    • Willis, R.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.