메뉴 건너뛰기




Volumn 6, Issue 3, 1991, Pages 1168-1174

Optimal generating unit maintenance scheduling for multi-area system with network constraints

Author keywords

leveling reserve margin; maintenance scheduling; multi area; network constraints; optimal schedule; power arrival capability; virtual load

Indexed keywords

MATHEMATICAL PROGRAMMING, LINEAR;

EID: 0026203507     PISSN: 08858950     EISSN: 15580679     Source Type: Journal    
DOI: 10.1109/59.119262     Document Type: Article
Times cited : (64)

References (7)
  • 1
    • 84868614082 scopus 로고
    • Effective Load Carrying Capability of Generating Units
    • August
    • L. L. Garver,”Effective Load Carrying Capability of Generating Units,” IEEE Transactions on Power Apparatus and Systems, Vol. PAS-85, pp.910-919, August 1966.
    • (1966) IEEE Transactions on Power Apparatus and Systems , vol.PAS-85 , pp. 910-919
    • Garver, L.L.1
  • 3
    • 84944978549 scopus 로고
    • A New Approach of Maintenance Scheduling Based on Incremental Reliability
    • May
    • L.N. Chen and J. Toyoda, “A New Approach of Maintenance Scheduling Based on Incremental Reliability,” T.IEE Japan, Vol.108-B, pp.205-212, May 1988.
    • (1988) T.IEE Japan , vol.108-B , pp. 205-212
    • Chen, L.N.1    Toyoda, J.2
  • 4
    • 84948589845 scopus 로고
    • Power Arrival Evaluation of Bulk System Including Network Constraints Based on Linear Programming Approach
    • Minneapolis, 90 SM 296-4 PWRS, July
    • L.N. Chen, H.Suwa, J.Toyoda, “Power Arrival Evaluation of Bulk System Including Network Constraints Based on Linear Programming Approach,” IEEE/PES 1990 Summer Meeting, Minneapolis, 90 SM 296-4 PWRS, July,1990.
    • (1990) IEEE/PES 1990 Summer Meeting
    • Chen, L.N.1    Suwa, H.2    Toyoda, J.3
  • 5
    • 0024867024 scopus 로고
    • Maintenance Scheduling Based on Two Level Hierarchical Structure to Equalize Incremental Risk
    • (Tr.paper of IEEE), Seattle,May
    • L.N. Chen and J. Toyoda, “Maintenance Scheduling Based on Two Level Hierarchical Structure to Equalize Incremental Risk,” Proc. PICA Conference (Tr.paper of IEEE),Seattle,pp.431-437,May 1989.
    • (1989) Proc. PICA Conference , pp. 431-437
    • Chen, L.N.1    Toyoda, J.2
  • 6
    • 0016552456 scopus 로고
    • Optimal Generator Maintenance Scheduling Using Integer Programming
    • September/October
    • J.F.Dopazo and H.M.Merrill, “Optimal Generator Maintenance Scheduling Using Integer Programming,” IEEE Transactions on Power Apparatus and Systems, Vol.PAS-94,pp. 1537–1545, September/October 1975.
    • (1975) IEEE Transactions on Power Apparatus and Systems , vol.PAS-94 , pp. 1537-1545
    • Dopazo, J.F.1    Merrill, H.M.2
  • 7
    • 0019567706 scopus 로고
    • Scheduling of Generation and Reserve Margin Using Dynamic and Linear Programming
    • May
    • J.G.Waight, F.Albuyeh and A.Bose “Scheduling of Generation and Reserve Margin Using Dynamic and Linear Programming,” IEEE Transactions on Power Apparatus and Systems, Vol.PAS-100,PP.2226-2230, May 1981.
    • (1981) IEEE Transactions on Power Apparatus and Systems , vol.PAS-100 , pp. 2226-2230
    • Waight, J.G.1    Albuyeh, F.2    Bose, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.