메뉴 건너뛰기




Volumn 16, Issue 2, 1997, Pages 117-128

Scheduling for IC Sort and Test Facilities with Precedence Constraints via Lagrangian Relaxation

Author keywords

Lagrangian Relaxation; Multiple Resources; Precedence Constraints; Scheduling

Indexed keywords


EID: 0342323208     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0278-6125(97)85675-0     Document Type: Article
Times cited : (11)

References (19)
  • 4
    • 0019585243 scopus 로고
    • A Review of Production Scheduling
    • S.C. Graves, "A Review of Production Scheduling," Operations Research (v29, 1981), pp646-675.
    • (1981) Operations Research , vol.29 , pp. 646-675
    • Graves, S.C.1
  • 6
    • 85012764422 scopus 로고
    • Advances in the Theory and Practice of Scheduling
    • C.T. Leondes, ed. San Diego, CA: Academic Press
    • K.P. White Jr., "Advances in the Theory and Practice of Scheduling," in Advances in Industrial Systems, Control and Dynamic Systems, v37, C.T. Leondes, ed. (San Diego, CA: Academic Press, 1990), pp115-158.
    • (1990) Advances in Industrial Systems, Control and Dynamic Systems , vol.37 , pp. 115-158
    • White K.P., Jr.1
  • 7
    • 84952240555 scopus 로고
    • A Review of Production Planning and Scheduling Models in the Semiconductor Industry, Part I: System Characteristics, Performance Evaluation and Production Planning
    • R. Uzsoy, C. Y. Lee, and L. A. Martin-Vega, "A Review of Production Planning and Scheduling Models in the Semiconductor Industry, Part I: System Characteristics, Performance Evaluation and Production Planning," IIE Transactions on Scheduling and Logistics (v24, n4, 1992), pp47-60.
    • (1992) IIE Transactions on Scheduling and Logistics , vol.24 , Issue.4 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 8
    • 0028496979 scopus 로고
    • A Review of Production Planning and Scheduling Models in the Semiconductor Industry, Part II: Shop-Floor Control
    • R. Uzsoy, C.Y. Lee, and L.A. Martin-Vega, "A Review of Production Planning and Scheduling Models in the Semiconductor Industry, Part II: Shop-Floor Control," IIE Transactions on Scheduling and Logistics (v26, 1994), pp44-55.
    • (1994) IIE Transactions on Scheduling and Logistics , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 9
    • 0023238180 scopus 로고
    • A Model for Wafer Fabrication Dynamics in Integrated Circuit Manufacturing
    • J. Dayhoff and R.W. Atherton, "A Model for Wafer Fabrication Dynamics in Integrated Circuit Manufacturing," IEEE Transactions on Systems, Man and Cybernetics (v17, n1, 1987), pp91-100.
    • (1987) IEEE Transactions on Systems, Man and Cybernetics , vol.17 , Issue.1 , pp. 91-100
    • Dayhoff, J.1    Atherton, R.W.2
  • 10
    • 0023981636 scopus 로고
    • Empirical Evaluation of a Queueing Network Model for Semiconductor Wafer Fabrication
    • H. Chen, J.M. Harrison, A. Mandelbaum, A. Van Ackere, and L.M. Wein, "Empirical Evaluation of a Queueing Network Model for Semiconductor Wafer Fabrication," Operations Research (v36, 1988), pp202-215.
    • (1988) Operations Research , vol.36 , pp. 202-215
    • Chen, H.1    Harrison, J.M.2    Mandelbaum, A.3    Van Ackere, A.4    Wein, L.M.5
  • 12
    • 0026866908 scopus 로고
    • Real-Time Control of Multiproduct Bulk-Service Semiconductor Manufacturing Processes
    • J.W. Fowler, D.T. Philips, and G.L. Hogg, "Real-Time Control of Multiproduct Bulk-Service Semiconductor Manufacturing Processes," IEEE Transactions on Semiconductor Manufacturing (v5, n2, 1992), pp158-163.
    • (1992) IEEE Transactions on Semiconductor Manufacturing , vol.5 , Issue.2 , pp. 158-163
    • Fowler, J.W.1    Philips, D.T.2    Hogg, G.L.3
  • 13
    • 0026944363 scopus 로고
    • Control of Batch Processing Systems in Semiconductor Wafer Fabrication Facilities
    • H. Gurnani, R. Anupindi, and R. Akella, "Control of Batch Processing Systems in Semiconductor Wafer Fabrication Facilities," IEEE Transactions on Semiconductor Manufacturing (v5, n4, 1992), pp319-328.
    • (1992) IEEE Transactions on Semiconductor Manufacturing , vol.5 , Issue.4 , pp. 319-328
    • Gurnani, H.1    Anupindi, R.2    Akella, R.3
  • 16
    • 0026898494 scopus 로고
    • Efficient Algorithms for Scheduling Semiconductor Burn-In Operations
    • C.Y. Lee, R. Uzsoy, and L.A. Martin-Vega, "Efficient Algorithms for Scheduling Semiconductor Burn-In Operations," Operations Research (v40, n4, 1992), pp764-775.
    • (1992) Operations Research , vol.40 , Issue.4 , pp. 764-775
    • Lee, C.Y.1    Uzsoy, R.2    Martin-Vega, L.A.3
  • 17
    • 0025384041 scopus 로고
    • Scheduling Jobs with Simple Precedence Constraints on Parallel Machines
    • D.J. Hoitomt, P.B. Luh, Eric Max, and K.R. Pattipati, "Scheduling Jobs with Simple Precedence Constraints on Parallel Machines," IEEE Control Systems Magazine (v10, n2, 1990), pp34-40.
    • (1990) IEEE Control Systems Magazine , vol.10 , Issue.2 , pp. 34-40
    • Hoitomt, D.J.1    Luh, P.B.2    Max, E.3    Pattipati, K.R.4
  • 19
    • 49849127729 scopus 로고
    • Minimization of Unsmooth Functions
    • B.T. Polyak, "Minimization of Unsmooth Functions," USSR Comput. Math. Math. Phys. (v9, 1969), pp14-29.
    • (1969) USSR Comput. Math. Math. Phys. , vol.9 , pp. 14-29
    • Polyak, B.T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.