Engineering change administration: The key issues
-
K.J. Balcerak, B.G. Dale, Engineering change administration: the key issues, Comput.-Integr. Manuf. Syst. 5 (2) (1992) 125-132.
-
(1992)
Comput.-Integr. Manuf. Syst.
, vol.5
, Issue.2
, pp. 125-132
-
-
Balcerak, K.J.1
Dale, B.G.2
-
2
-
-
0020297580
-
The management of engineering change procedure
-
B.G. Dale, The management of engineering change procedure, Eng. Manag. Int. 1 (1982) 201-208.
-
(1982)
Eng. Manag. Int.
, vol.1
, pp. 201-208
-
-
Dale, B.G.1
-
3
-
-
0020107702
-
Engineering change control and implementation considerations
-
M. Diprima, Engineering change control and implementation considerations, Prod. Inventory Manag. J. 23 (1) (1982) 81-87.
-
(1982)
Prod. Inventory Manag. J.
, vol.23
, Issue.1
, pp. 81-87
-
-
Diprima, M.1
-
4
-
-
0026984534
-
Engineering changes and time delays: A field investigation
-
G.G. Hegde, S.H. Kekre, Sh. Kekre, Engineering changes and time delays: a field investigation, Int. J. Prod. Econom. 28 (1992) 341-352.
-
(1992)
Int. J. Prod. Econom.
, vol.28
, pp. 341-352
-
-
Hegde, G.G.1
Kekre, S.H.2
Kekre, S.3
-
5
-
-
0027542994
-
Avoiding engineering changes through focused manufacturing knowledge
-
I. Saeed, D.M. Bowen, V.S. Sohoni, Avoiding engineering changes through focused manufacturing knowledge, IEEE Trans. Eng. Manag. 40 (1) (1993) 54-58.
-
(1993)
IEEE Trans. Eng. Manag.
, vol.40
, Issue.1
, pp. 54-58
-
-
Saeed, I.1
Bowen, D.M.2
Sohoni, V.S.3
-
6
-
-
0021614349
-
Engineering changes: A case study
-
F. Watts, Engineering changes: a case study, Prod. Inventory Manag. J. 25 (4) (1984) 55-62.
-
(1984)
Prod. Inventory Manag. J.
, vol.25
, Issue.4
, pp. 55-62
-
-
Watts, F.1
-
7
-
-
0004232853
-
-
Ellis Horwood, Chichester, UK
-
D.J. Leech, B.T. Turner, Engineering Design for Profit, Ellis Horwood, Chichester, UK, 1985.
-
(1985)
Engineering Design for Profit
-
-
Leech, D.J.1
Turner, B.T.2
-
8
-
-
0026414520
-
Engineering change management in long-lead-time environments
-
M.A. Reidelbach, Engineering change management in long-lead-time environments, Prod. Inventory Manag. J. 32 (2) (1991) 84-88.
-
(1991)
Prod. Inventory Manag. J.
, vol.32
, Issue.2
, pp. 84-88
-
-
Reidelbach, M.A.1
-
9
-
-
0002842504
-
Getting engineering changes under control
-
K. Nichols, Getting engineering changes under control, J. Eng. Design 1 (1990) 5-15.
-
(1990)
J. Eng. Design
, vol.1
, pp. 5-15
-
-
Nichols, K.1
-
11
-
-
0026824053
-
The role of the bill-of-materials as a CAD/CAPM interface and the key importance of engineering change control
-
R. Maull, D. Hughes, J. Bennett, The role of the bill-of-materials as a CAD/CAPM interface and the key importance of engineering change control, Comput. Control Eng. J., March 1992, pp. 63-70.
-
(1992)
Comput. Control Eng. J., March
, pp. 63-70
-
-
Maull, R.1
Hughes, D.2
Bennett, J.3
-
12
-
-
79958149512
-
Change mode, cause and effect analysis - A concurrent engineering approach to cost effective management of product design changes
-
Praha, Czeckoslovakia, August
-
G.Q. Huang, G. Johnston, Change mode, cause and effect analysis - a concurrent engineering approach to cost effective management of product design changes, International Conference on Engineering Design, Praha, Czeckoslovakia, August 1995.
-
(1995)
International Conference on Engineering Design
-
-
Huang, G.Q.1
Johnston, G.2
-
13
-
-
0002029681
-
A review of research into engineering change management: Implications for product design
-
I.S. Wright, A review of research into engineering change management: Implications for product design, Des. Stud. 18 (1) (1997) 33-42.
-
(1997)
Des. Stud.
, vol.18
, Issue.1
, pp. 33-42
-
-
Wright, I.S.1
|