-
1
-
-
0022667867
-
Optimal control of production rate in failure prone manufacturing system
-
R. Akella and P. R. Kumar, "Optimal control of production rate in failure prone manufacturing system," IEEE Trans. Automat. Contr., vol. AC-31, pp. 116-126, 1986.
-
(1986)
IEEE Trans. Automat. Contr.
, vol.AC-31
, pp. 116-126
-
-
Akella, R.1
Kumar, P.R.2
-
3
-
-
0025532680
-
Scheduling manufacturing systems with work-in-process inventory
-
Honolulu, HI, Dec. 5-7
-
S. X. Bai and S. B. Gershwin, "Scheduling manufacturing systems with work-in-process inventory," in Proc. 29th IEEE Conf. Decision and Contr., Honolulu, HI, Dec. 5-7, 1990, pp. 557-564.
-
(1990)
Proc. 29th IEEE Conf. Decision and Contr.
, pp. 557-564
-
-
Bai, S.X.1
Gershwin, S.B.2
-
5
-
-
0020915621
-
An algorithm for the computer control of production in flexible manufacturing systems
-
J. G. Kimemia and S. B. Gershwin, "An algorithm for the computer control of production in flexible manufacturing systems," IIE Trans., vol. 15, pp. 353-362, 1983.
-
(1983)
IIE Trans.
, vol.15
, pp. 353-362
-
-
Kimemia, J.G.1
Gershwin, S.B.2
-
6
-
-
0001130358
-
An asymptotic analysis of hierarchical control of manufacturing systems under uncertainty
-
J. Lehoczky, S. P. Sethi, H. M. Soner, and M. Taksar, "An asymptotic analysis of hierarchical control of manufacturing systems under uncertainty," Math. Oper. Res., vol. 16, pp. 596-608, 1991.
-
(1991)
Math. Oper. Res.
, vol.16
, pp. 596-608
-
-
Lehoczky, J.1
Sethi, S.P.2
Soner, H.M.3
Taksar, M.4
-
7
-
-
0028392099
-
Optimal feedback production planning in a stochastic two-machine flowshop
-
S. Lou, S. P. Sethi, and Q. Zhang, "Optimal feedback production planning in a stochastic two-machine flowshop," Eur. J. Oper. Res., vol. 73, pp. 331-345, 1994.
-
(1994)
Eur. J. Oper. Res.
, vol.73
, pp. 331-345
-
-
Lou, S.1
Sethi, S.P.2
Zhang, Q.3
-
8
-
-
0029378614
-
Optimal production planning in a stochastic N-machine flowshop
-
E. Presman, S. P. Sethi, and Q. Zhang, "Optimal production planning in a stochastic N-machine flowshop," Automatica, vol. 31, pp. 1325-1332, 1995.
-
(1995)
Automatica
, vol.31
, pp. 1325-1332
-
-
Presman, E.1
Sethi, S.P.2
Zhang, Q.3
-
9
-
-
0031099719
-
Computational evaluation of hierarchical production control policies for stochastic manufacturing systems
-
to be published
-
C. Samaratunga, S. P. Sethi, and X. Y. Zhou, "Computational evaluation of hierarchical production control policies for stochastic manufacturing systems," Oper. Res. to be published.
-
Oper. Res.
-
-
Samaratunga, C.1
Sethi, S.P.2
Zhou, X.Y.3
-
10
-
-
38149146704
-
Hierarchical production planning in dynamic stochastic manufacturing systems: Asymptotic optimally and error bounds
-
S. P. Sethi and Q. Zhang, " Hierarchical production planning in dynamic stochastic manufacturing systems: Asymptotic optimally and error bounds," J. Math. Anal. App., vol. 181, pp. 285-319, 1994.
-
(1994)
J. Math. Anal. App.
, vol.181
, pp. 285-319
-
-
Sethi, S.P.1
Zhang, Q.2
-
12
-
-
0028380664
-
Hierarchical controls in stochastic manufacturing systems with convex costs
-
S. P. Sethi, Q. Zhang, and X. Y. Zhou, "Hierarchical controls in stochastic manufacturing systems with convex costs," J. Optim. Theory Appl., vol. 80, pp. 299-317, 1994.
-
(1994)
J. Optim. Theory Appl.
, vol.80
, pp. 299-317
-
-
Sethi, S.P.1
Zhang, Q.2
Zhou, X.Y.3
-
13
-
-
0002586369
-
Hierarchical controls in stochastic manufacturing systems with machines in tandem
-
_,"Hierarchical controls in stochastic manufacturing systems with machines in tandem," Stoch. Stoch. Rep., vol. 41, pp. 89-118, 1992.
-
(1992)
Stoch. Stoch. Rep.
, vol.41
, pp. 89-118
-
-
-
14
-
-
0342911350
-
Asymptotic optimal feedback controls in stochastic dynamic two-machine flowshops
-
G. Yin and Q. Zhang, Eds. New York: Springer-Verlag
-
S. P. Sethi and X. Y. Zhou, "Asymptotic optimal feedback controls in stochastic dynamic two-machine flowshops," in Lecture Notes in Control and Information Sciences, G. Yin and Q. Zhang, Eds. New York: Springer-Verlag, 1996, vol. 214, pp. 147-180.
-
(1996)
Lecture Notes in Control and Information Sciences
, vol.214
, pp. 147-180
-
-
Sethi, S.P.1
Zhou, X.Y.2
-
15
-
-
0000634430
-
Hierarchical real-time integrated scheduling of a semiconductor fabrication facility
-
the series Control and Dynamic Systems, C. T. Leondes, Ed. New York: Academic
-
N. Srivatsan, S. X. Bai, and S. B. Gershwin, "Hierarchical real-time integrated scheduling of a semiconductor fabrication facility," in Computer-Aided Manufacturing/Computer-Integrated Manufacturing, part 2 of vol. 61 in the series Control and Dynamic Systems, C. T. Leondes, Ed. New York: Academic, 1994, pp. 197-241.
-
(1994)
Computer-Aided Manufacturing/Computer-Integrated Manufacturing
, vol.61
, Issue.2 PART
, pp. 197-241
-
-
Srivatsan, N.1
Bai, S.X.2
Gershwin, S.B.3
-
16
-
-
0027666614
-
Production control for a tandem two-machine system
-
G. J. Van Ryzin, X.-C. Lou, and S. B. Gershwin, "Production control for a tandem two-machine system," IIE Trans., vol. 25, pp. 5-20, 1993.
-
(1993)
IIE Trans.
, vol.25
, pp. 5-20
-
-
Van Ryzin, G.J.1
Lou, X.-C.2
Gershwin, S.B.3
|