메뉴 건너뛰기




Volumn 28, Issue 12, 2004, Pages 2493-2508

Intermediate storage in batch/continuous processing systems under stochastic operation conditions

Author keywords

Integral equations; Intermediate storage; Monte Carlo simulation; Numerical solutions; Processing system; Stochastic model

Indexed keywords

APPROXIMATION THEORY; DIFFERENTIAL EQUATIONS; FUNCTIONS; INTEGRAL EQUATIONS; MATHEMATICAL MODELS; PARAMETER ESTIMATION; POISSON EQUATION; PROBABILITY DISTRIBUTIONS;

EID: 9644291681     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compchemeng.2004.06.011     Document Type: Article
Times cited : (7)

References (21)
  • 3
    • 0036680971 scopus 로고    scopus 로고
    • A non-stationary periodic review production-inventory model with uncertain production capacity and uncertain demand
    • T. Iida A non-stationary periodic review production-inventory model with uncertain production capacity and uncertain demand European Journal Operational Research 140 2002 670 683
    • (2002) European Journal Operational Research , vol.140 , pp. 670-683
    • Iida, T.1
  • 4
    • 0002771319 scopus 로고
    • Determining storage vessel cost
    • Module G2.6. AIChE
    • Kalis, P. E. (1986). Determining storage vessel cost. AIChE Modular Instruction Series. Module G2.6. AIChE, 41-48.
    • (1986) AIChE Modular Instruction Series , pp. 41-48
    • Kalis, P.E.1
  • 5
    • 0020783780 scopus 로고
    • Optimal selection of intermediate storage tank capacity in a periodic batch/semicontinuous process
    • I.A. Karimi, and G.V. Reklaitis Optimal selection of intermediate storage tank capacity in a periodic batch/semicontinuous process AIChE Journal 29 1983 588 596
    • (1983) AIChE Journal , vol.29 , pp. 588-596
    • Karimi, I.A.1    Reklaitis, G.V.2
  • 6
    • 0021855839 scopus 로고
    • Intermediate storage in non-continuous processes involving stages of parallel units
    • I.A. Karimi, and G.V. Reklaitis Intermediate storage in non-continuous processes involving stages of parallel units AIChE Journal 31 1985 44 52
    • (1985) AIChE Journal , vol.31 , pp. 44-52
    • Karimi, I.A.1    Reklaitis, G.V.2
  • 9
    • 0024650254 scopus 로고
    • Intermediate storage and operation of batch processes under batch failure
    • E.S. Lee, and G.V. Reklaitis Intermediate storage and operation of batch processes under batch failure Computers and Chemical Engineering 13 1989 491 498
    • (1989) Computers and Chemical Engineering , vol.13 , pp. 491-498
    • Lee, E.S.1    Reklaitis, G.V.2
  • 10
    • 0024922597 scopus 로고
    • Intermediate storage and the operation of periodic processes under equipment failure
    • E.S. Lee, and G.V. Reklaitis Intermediate storage and the operation of periodic processes under equipment failure Computers and Chemical Engineering 13 1989 1235 1243
    • (1989) Computers and Chemical Engineering , vol.13 , pp. 1235-1243
    • Lee, E.S.1    Reklaitis, G.V.2
  • 12
    • 0025564447 scopus 로고
    • A general stochastic model for intermediate storage in noncontinuous processes
    • T.O. Odi, and I.A. Karimi A general stochastic model for intermediate storage in noncontinuous processes Chemical Engineering Science 45 1990 3533 3549
    • (1990) Chemical Engineering Science , vol.45 , pp. 3533-3549
    • Odi, T.O.1    Karimi, I.A.2
  • 13
    • 84862479081 scopus 로고    scopus 로고
    • Ph.D. Thesis. Veszprém: University of Veszprém.
    • Orbán-Mihálykó, É. (2003). Ph.D. Thesis. Veszprém: University of Veszprém.
    • (2003)
    • Orbán-Mihálykó1    É2
  • 14
    • 9644292413 scopus 로고    scopus 로고
    • Intermediate storage in batch processing systems under stochastic equipment failures
    • É. Orbán-Mihálykó, and B.G. Lakatos Intermediate storage in batch processing systems under stochastic equipment failures Computers and Chemical Engineering 22 1998 S797 S800
    • (1998) Computers and Chemical Engineering , vol.22
    • Orbán-Mihálykó, É.1    Lakatos, B.G.2
  • 15
    • 9644258022 scopus 로고    scopus 로고
    • Modeling operation of intermediate storage in batch/continuous processing systems under stochastic conditions
    • I. Troch F. Breite-necker VUT, Vienna, Austria
    • É. Orbán-Mihálykó, and B.G. Lakatos Modeling operation of intermediate storage in batch/continuous processing systems under stochastic conditions I. Troch F. Breite-necker Proceedings of the 4th MATHMOD VUT, Vienna, Austria 2003 171 181
    • (2003) Proceedings of the 4th MATHMOD , pp. 171-181
    • Orbán-Mihálykó, É.1    Lakatos, B.G.2
  • 17
    • 84862478275 scopus 로고    scopus 로고
    • On the advanced integral and differential equations of the sizing procedure of storage devices
    • É. Orbán-Mihálykó, and B.G. Lakatos On the advanced integral and differential equations of the sizing procedure of storage devices Functional Differential Equations 11 2004 121 131
    • (2004) Functional Differential Equations , vol.11 , pp. 121-131
    • Orbán-Mihálykó, É.1    Lakatos, B.G.2
  • 18
    • 9644296529 scopus 로고
    • How much tankage is enough
    • R.C. Ross How much tankage is enough Hydrocarbon Processing 8 8 1973 75 78
    • (1973) Hydrocarbon Processing , vol.8 , Issue.8 , pp. 75-78
    • Ross, R.C.1
  • 19
    • 0018651037 scopus 로고
    • Optimal scheduling and minimum storage tank capacities in a process system with parallel batch units
    • T. Takamatsu, I. Hashimoto, and S. Hasebe Optimal scheduling and minimum storage tank capacities in a process system with parallel batch units Computers and Chemical Engineering 3 1979 185 195
    • (1979) Computers and Chemical Engineering , vol.3 , pp. 185-195
    • Takamatsu, T.1    Hashimoto, I.2    Hasebe, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.