메뉴 건너뛰기




Volumn 17, Issue 3, 2004, Pages 437-441

Applying particle swarm optimization to job-shop scheduling problem

Author keywords

Hybrid optimization algorithm; Job shop scheduling problem; Particle swarm optimization; Simulated annealing

Indexed keywords

JOB ANALYSIS; OPTIMIZATION; SIMULATED ANNEALING;

EID: 9444264348     PISSN: 10009345     EISSN: None     Source Type: Journal    
DOI: 10.3901/cjme.2004.03.437     Document Type: Article
Times cited : (22)

References (15)
  • 2
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams J, Balas E, Zawack D. The shifting bottleneck procedure for job shop scheduling. Management Science, 1988, 34(3): 391-401
    • (1988) Management Science , vol.34 , Issue.3 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 4
    • 34250074609 scopus 로고
    • Applying tabu search to the job shop scheduling problem
    • Dell'Amico M, Trubian M. Applying tabu search to the job shop scheduling problem. Annals of Operations Research, 1993, 40: 231-252
    • (1993) Annals of Operations Research , vol.40 , pp. 231-252
    • Dell'Amico, M.1    Trubian, M.2
  • 6
    • 0035324670 scopus 로고    scopus 로고
    • An effective hybrid optimization strategy for job-shop scheduling problems
    • Wang L, Zheng D. An effective hybrid optimization strategy for job-shop scheduling problems. Computers and Operations Research, 2001, 28(6): 585-596
    • (2001) Computers and Operations Research , vol.28 , Issue.6 , pp. 585-596
    • Wang, L.1    Zheng, D.2
  • 7
    • 0012493286 scopus 로고    scopus 로고
    • A GRASP for job shop scheduling
    • Ribeiro C. and Hansen P. (ed.), Kluwer Academic Publishers
    • Binato S, Hery W J, Loewenstern D M, et al. A GRASP for job shop scheduling. In: Ribeiro C, Hansen P, eds. Essays and Surveys in Meta-heuristics, Kluwer Academic Publishers, 2001: 59-79
    • (2001) Essays and Surveys in Meta-heuristics , pp. 59-79
    • Binato, S.1    Hery, W.J.2    Loewenstern, D.M.3
  • 11
    • 0004168233 scopus 로고
    • Industrial Scheduling
    • Englewood Cliffs, NJ: Prentice Hall
    • Muth J F, Thompson G L. Industrial scheduling. Englewood Cliffs. NJ: Prentice Hall, 1963
    • (1963)
    • Muth, J.F.1    Thompson, G.L.2
  • 13
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirkpatrick S, Gelatt C D, Vecchi M P. Optimization by simulated annealing. Science, 1983, 220(13): 671-680
    • (1983) Science , vol.220 , Issue.13 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, C.D.2    Vecchi, M.P.3
  • 14
    • 0003994089 scopus 로고
    • Resource constrained project scheduling: An experimental investigation of heuristic scheduling techniques
    • Carnegie Mellon University: Pittsburgh
    • Lawrance S. Resource constrained project scheduling: an experimental investigation of heuristic scheduling techniques. Carnegie Mellon University: Pittsburgh, 1984
    • (1984)
    • Lawrance, S.1
  • 15
    • 0029215084 scopus 로고
    • Evolution based learning in a job shop environment
    • Dorndorf U, Pesch E. Evolution based learning in a job shop environment. Computers and Operations Research, 1995, 22(1): 25-40
    • (1995) Computers and Operations Research , vol.22 , Issue.1 , pp. 25-40
    • Dorndorf, U.1    Pesch, E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.