-
1
-
-
6544229306
-
Likes and dislikes of Taguchi methods
-
October-December
-
Antony, J. (1996), "Likes and dislikes of Taguchi methods", Journal of Productivity, Vol. 37 No. 3, October-December, pp. 477-81.
-
(1996)
Journal of Productivity
, vol.37
, Issue.3
, pp. 477-481
-
-
Antony, J.1
-
2
-
-
0027542979
-
A systematic approach to planning for a designed industrial experiment
-
Coleman, D.E. and Montgomery, D.C. (1993), "A systematic approach to planning for a designed industrial experiment", Technometrics, Vol. 35 No. 1, pp. 1-27.
-
(1993)
Technometrics
, vol.35
, Issue.1
, pp. 1-27
-
-
Coleman, D.E.1
Montgomery, D.C.2
-
3
-
-
0026940322
-
Identification of robust scheduling heuristics: Application of Taguchi methods in simulation studies
-
Dooley, K.J. and Mahmoodi, F. (1992), "Identification of robust scheduling heuristics: application of Taguchi methods in simulation studies", Computers and Industrial Engineering, Vol. 22 No. 4, pp. 359-68.
-
(1992)
Computers and Industrial Engineering
, vol.22
, Issue.4
, pp. 359-368
-
-
Dooley, K.J.1
Mahmoodi, F.2
-
4
-
-
0025450617
-
Optimization of metal injection moulding: Experimental design
-
Fox, R.T. and Lee, D. (1990), "Optimization of metal injection moulding: experimental design", The International Journal of Powder Metallurgy, Vol. 26 No. 3, pp. 233-43.
-
(1990)
The International Journal of Powder Metallurgy
, vol.26
, Issue.3
, pp. 233-243
-
-
Fox, R.T.1
Lee, D.2
-
5
-
-
0003479506
-
-
McGraw Hill, New York, NY
-
Kolarik, W.J. (1995), Creating Quality, Concepts, Systems, Strategies and Tools, McGraw Hill, New York, NY.
-
(1995)
Creating Quality, Concepts, Systems, Strategies and Tools
-
-
Kolarik, W.J.1
-
7
-
-
0542359167
-
Pros and cons of Taguchi
-
Lochner, R.H. (1991), "Pros and cons of Taguchi", Quality Engineering, Vol. 3 No. 4, pp. 537-49.
-
(1991)
Quality Engineering
, vol.3
, Issue.4
, pp. 537-549
-
-
Lochner, R.H.1
-
8
-
-
0025470409
-
Development of newly installed processes
-
Logothetis, N., Atkinson, C.J., Salmon, J.P. and Best, K.F. (1990), "Development of newly installed processes", International Journal of Advanced Manufacturing Technology, Vol. 5, pp 256-74.
-
(1990)
International Journal of Advanced Manufacturing Technology
, vol.5
, pp. 256-274
-
-
Logothetis, N.1
Atkinson, C.J.2
Salmon, J.P.3
Best, K.F.4
-
9
-
-
0026903437
-
Implementing quality improvement programmes
-
McKeown, P. (1992), "Implementing quality improvement programmes", Robotics & Computer Integrated Manufacturing, Vol. 9 No. 4/5, pp. 311-20.
-
(1992)
Robotics & Computer Integrated Manufacturing
, vol.9
, Issue.4-5
, pp. 311-320
-
-
McKeown, P.1
-
10
-
-
84952120470
-
Taguchi's parameter design: A panel discussion
-
Nair, V.N. (Ed.) (1992), "Taguchi's parameter design: a panel discussion", Technometrics, Vol. 34 No. 2, pp. 127-61.
-
(1992)
Technometrics
, vol.34
, Issue.2
, pp. 127-161
-
-
Nair, V.N.1
-
11
-
-
84948233896
-
Top ten triumphs and tragedies of Genichi Taguchi
-
Pignatiello, J.J. (Jr) and Ramberg, J.S. (1991), "Top ten triumphs and tragedies of Genichi Taguchi", Quality Engineering, Vol. 4 No. 2, pp. 211-25.
-
(1991)
Quality Engineering
, vol.4
, Issue.2
, pp. 211-225
-
-
Pignatiello Jr., J.J.1
Ramberg, J.S.2
-
14
-
-
0041584900
-
Using Taguchi methods to determine optimize robot process capability for path following
-
Wu, C.M., Black, J.T and Jiang, B.C. (1991), "Using Taguchi methods to determine optimize robot process capability for path following", Robotics & Computer-Integrated Manufacturing, Vol. 8 No. 1, pp. 9-25.
-
(1991)
Robotics & Computer-integrated Manufacturing
, vol.8
, Issue.1
, pp. 9-25
-
-
Wu, C.M.1
Black, J.T.2
Jiang, B.C.3
|