메뉴 건너뛰기




Volumn 19, Issue 4, 2004, Pages 1811-1820

A practical approach for integrated power system vulnerability analysis with protection failures

Author keywords

Adequacy; Cascading; Hidden failures; Power system; Protection systems; Reliability; Security; Vulnerability

Indexed keywords

COMPUTER SIMULATION; FAILURE ANALYSIS; MATHEMATICAL MODELS; MONTE CARLO METHODS; OUTAGES; PROBABILITY; RANDOM PROCESSES; RELIABILITY;

EID: 9244246297     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2004.835656     Document Type: Article
Times cited : (233)

References (15)
  • 2
    • 0030189082 scopus 로고    scopus 로고
    • "Expose hidden failures to prevent cascading outages"
    • July
    • A. G. Phadke and J. S. Thorp, "Expose hidden failures to prevent cascading outages," IEEE Comput. Appl. Power, vol. 9, pp. 20-23, July 1996.
    • (1996) IEEE Comput. Appl. Power , vol.9 , pp. 20-23
    • Phadke, A.G.1    Thorp, J.S.2
  • 3
    • 0030126334 scopus 로고    scopus 로고
    • "Anatomy of power system blackouts: Preventive relays strategies"
    • Apr
    • S. Tamronglak et al., "Anatomy of power system blackouts: Preventive relays strategies," IEEE Trans. Power Delivery, vol. 11, pp. 708-715, Apr. 1996.
    • (1996) IEEE Trans. Power Delivery , vol.11 , pp. 708-715
    • Tamronglak, S.1
  • 4
    • 0019069299 scopus 로고
    • "Protection system reliability modeling: Unreadiness probability and mean duration of undetected faults"
    • Oct
    • C. Singh and A. D. Patton, "Protection system reliability modeling: Unreadiness probability and mean duration of undetected faults," IEEE Trans. Rel., vol. R-29, pp. 339-340, Oct. 1980.
    • (1980) IEEE Trans. Rel. , vol.R-29 , pp. 339-340
    • Singh, C.1    Patton, A.D.2
  • 5
    • 0019069241 scopus 로고
    • "Models and concepts for power system reliability evaluation including protection system failure"
    • Oct
    • C. Singh, "Models and concepts for power system reliability evaluation including protection system failure," Elect. Power & Energy Syst., vol. R-2, no. 4, pp. 161-168, Oct. 1980.
    • (1980) Elect. Power & Energy Syst. , vol.R-2 , Issue.4 , pp. 161-168
    • Singh, C.1
  • 6
    • 0035481762 scopus 로고    scopus 로고
    • "Optimal location for protection system enhancement: A simulation of cascading outages"
    • Oct
    • H. Wang and J. S. Thorp, "Optimal location for protection system enhancement: A simulation of cascading outages," IEEE Trans. Power Delivery, vol. 16, pp. 528-533, Oct. 2001.
    • (2001) IEEE Trans. Power Delivery , vol.16 , pp. 528-533
    • Wang, H.1    Thorp, J.S.2
  • 7
    • 0034841423 scopus 로고    scopus 로고
    • "Vulnerability assessment and allocation of protection resources in power systems"
    • D. L. Pepyne et al., "Vulnerability assessment and allocation of protection resources in power systems," in Proc. 2001 American Control Conf., pp. 4705-4710.
    • Proc. 2001 American Control Conf. , pp. 4705-4710
    • Pepyne, D.L.1
  • 8
    • 0031612513 scopus 로고    scopus 로고
    • "An importance sampling application: 179 bus WSCC system under voltage based hidden failures and relay misoperation"
    • K. Bae and J. S. Thorp, "An importance sampling application: 179 bus WSCC system under voltage based hidden failures and relay misoperation," in Proc. 1998 System Science, 31st Hawaii Int. Conf., vol. 3, pp. 39-46.
    • Proc. 1998 System Science, 31st Hawaii Int. Conf. , vol.3 , pp. 39-46
    • Bae, K.1    Thorp, J.S.2
  • 9
    • 0037662911 scopus 로고    scopus 로고
    • "Power system reliability analysis considering protection failures"
    • X. Yu and C. Singh, "Power system reliability analysis considering protection failures," in Proc. IEEE PES Summer Meeting, vol. 2, 2002, pp. 963-968.
    • (2002) Proc. IEEE PES Summer Meeting , vol.2 , pp. 963-968
    • Yu, X.1    Singh, C.2
  • 10
    • 0038820812 scopus 로고    scopus 로고
    • "Power system reliability evaluation including, transient faults"
    • G. M. Huang and Y. Li, "Power system reliability evaluation including, transient faults," in Proc. 2001 NAPS, pp. 559-563.
    • Proc. 2001 NAPS , pp. 559-563
    • Huang, G.M.1    Li, Y.2
  • 11
    • 0030288978 scopus 로고    scopus 로고
    • "Probabilistic transient stability studies using the method of bisection"
    • Nov
    • S. Aboreshaid et al., "Probabilistic transient stability studies using the method of bisection," IEEE Trans. Power Syst., vol. 11, pp. 1990-1995, Nov. 1996.
    • (1996) IEEE Trans. Power Syst. , vol.11 , pp. 1990-1995
    • Aboreshaid, S.1
  • 12
    • 0032188623 scopus 로고    scopus 로고
    • "Modeling the influence of preventive maintenance on protection system reliability performance"
    • Oct
    • S. T. J. A. Vermeulen et al., "Modeling the influence of preventive maintenance on protection system reliability performance," IEEE Trans. Power Delivery, vol. 13, pp. 1027-1032, Oct. 1998.
    • (1998) IEEE Trans. Power Delivery , vol.13 , pp. 1027-1032
    • Vermeulen, S.T.J.A.1
  • 13
    • 0029346141 scopus 로고
    • "Stochastic modeling of high-speed reclosing in probabilistic transient stability studies"
    • Jul
    • R. Billinton and S. Aboreshaid, "Stochastic modeling of high-speed reclosing in probabilistic transient stability studies," Proc. Inst. Elect. Eng. Gener. Transm. Distrib., vol. 142, no. 4, pp. 350-354, Jul. 1995.
    • (1995) Proc. Inst. Elect. Eng. Gener. Transm. Distrib. , vol.142 , Issue.4 , pp. 350-354
    • Billinton, R.1    Aboreshaid, S.2
  • 15
    • 0018544097 scopus 로고
    • "IEEE reliability test system"
    • Nov/Dec
    • "IEEE reliability test system," IEEE Power App. Syst., vol. PAS-98, pp. 2047-2054, Nov/Dec. 1970.
    • (1970) IEEE Power App. Syst. , vol.PAS-98 , pp. 2047-2054


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.