![]() |
Volumn 19, Issue 4, 2004, Pages 2093-2101
|
Adequacy and responsibility of locational generation and transmission-optimization procedures
|
Author keywords
Installed capacity; Loss of load expectation; Optimization; Reliability; Risk; Transfer capability
|
Indexed keywords
DEREGULATION;
ELECTRIC INDUSTRY;
ELECTRIC LOAD LOSS;
ELECTRIC POWER GENERATION;
ELECTRIC POWER SYSTEMS;
ELECTRIC POWER TRANSMISSION;
ITERATIVE METHODS;
OPTIMIZATION;
RELIABILITY;
RISK ASSESSMENT;
INSTALLED CAPACITY;
LOSS OF LOAD EXPECTATION;
SUBREGIONAL CAPACITY;
TRANSFER CAPABILITY;
ELECTRIC UTILITIES;
|
EID: 9244244758
PISSN: 08858950
EISSN: None
Source Type: Journal
DOI: 10.1109/TPWRS.2004.835677 Document Type: Article |
Times cited : (27)
|
References (6)
|