메뉴 건너뛰기




Volumn 11, Issue 6, 2004, Pages 395-403

Valuing guarantees in a BOT infrastructure project

Author keywords

Capital projects; Construction industry; Government; Indonesia; Loan guarantee scheme; Private sector organizations; Project management

Indexed keywords

COMPUTER SIMULATION; COSTS; INVESTMENTS; LIFE CYCLE; PROJECT MANAGEMENT; RISK MANAGEMENT;

EID: 9144230181     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699980410571543     Document Type: Review
Times cited : (75)

References (22)
  • 3
    • 9144224483 scopus 로고    scopus 로고
    • Government support to private infrastructure projects in emerging markets
    • paper presented at the Cartagena, 29-30 May
    • Dailami, M. and Klein, M. (1997), "Government support to private infrastructure projects in emerging markets", paper presented at the Conference on Managing Government Exposures to Private Infrastructure, Cartagena, 29-30 May.
    • (1997) Conference on Managing Government Exposures to Private Infrastructure
    • Dailami, M.1    Klein, M.2
  • 4
    • 84864004184 scopus 로고    scopus 로고
    • Infrastruture project finance and capital flows: A new perspective
    • World Bank, Washington, DC
    • Dailami, M. and Leipziger, D. (1997), "Infrastruture project finance and capital flows: a new perspective", Policy Research working paper No. 1861, World Bank, Washington, DC.
    • (1997) Policy Research Working Paper No. 1861 , vol.1861
    • Dailami, M.1    Leipziger, D.2
  • 7
    • 23044473194 scopus 로고    scopus 로고
    • The long and winding path to private financing and regulation of toll roads
    • World Bank, Washington, DC
    • Estache, A. et al. (2000), "The long and winding path to private financing and regulation of toll roads", Policy Research working paper No. 2387, World Bank, Washington, DC.
    • (2000) Policy Research Working Paper No. 2387 , vol.2387
    • Estache, A.1
  • 8
    • 0033402275 scopus 로고    scopus 로고
    • Managing government exposure to private infrastructure risks
    • Irwin, T. et al. (1999), "Managing government exposure to private infrastructure risks", The World Bank Research Observer, Vol. 14 No. 2, pp. 229-45.
    • (1999) The World Bank Research Observer , vol.14 , Issue.2 , pp. 229-245
    • Irwin, T.1
  • 9
    • 13244255158 scopus 로고    scopus 로고
    • Public money for private infrastructure
    • World Bank, Washington, DC
    • Irwin, T. (2003), "Public money for private infrastructure", working paper No. 10, World Bank, Washington, DC.
    • (2003) Working Paper No. 10 , vol.10
    • Irwin, T.1
  • 10
    • 6744244104 scopus 로고    scopus 로고
    • Managing guarantee programs in support of infrastructure investment
    • World Bank, Washington, DC
    • Klein, M. (1997), "Managing guarantee programs in support of infrastructure investment", Policy Research working paper No. 1812, World Bank, Washington, DC.
    • (1997) Policy Research Working Paper No. 1812 , vol.1812
    • Klein, M.1
  • 14
    • 9144231493 scopus 로고    scopus 로고
    • Contingent liabilities in infrastructure: Lessons from the East Asian financial crisis
    • Brixi, H.P. and Schick, A. (Eds), World Bank, Washington DC
    • Mody, A. (2002), "Contingent liabilities in infrastructure: lessons from the East Asian financial crisis", in Brixi, H.P. and Schick, A. (Eds), Government at Risk: Contingent Liabilities and Fiscal Risk, World Bank, Washington DC, pp. 373-91.
    • (2002) Government at Risk: Contingent Liabilities and Fiscal Risk , pp. 373-391
    • Mody, A.1
  • 15
    • 9144274623 scopus 로고
    • Methods of loan guarantee valuation and accounting
    • World Bank, Washington, DC
    • Mody, A. and Patro, D. (1995), "Methods of loan guarantee valuation and accounting", CFS discussion paper No. 116, World Bank, Washington, DC.
    • (1995) CFS Discussion Paper No. 116 , vol.116
    • Mody, A.1    Patro, D.2
  • 16
    • 0036932439 scopus 로고    scopus 로고
    • An empirical evaluation of sampling methods in risk analysis simulation: Quasi Monte Carlo, descriptive sampling and Latin Hypercube sampling
    • Saliby, E. and Pacheco, F. (2002), "An empirical evaluation of sampling methods in risk analysis simulation: quasi Monte Carlo, descriptive sampling and Latin Hypercube sampling", Winter Proceeding Simulation Conference, IEEE, Vol. 2, pp. 1606-10.
    • (2002) Winter Proceeding Simulation Conference, IEEE , vol.2 , pp. 1606-1610
    • Saliby, E.1    Pacheco, F.2
  • 17
    • 84977321043 scopus 로고
    • On the valuation of federal loan guarantees to corporations
    • Sosin, H.B. (1980), "On the valuation of federal loan guarantees to corporations", The Journal of Finance, Vol. XXXV No. 5, pp. 1209-21.
    • (1980) The Journal of Finance , vol.35 , Issue.5 , pp. 1209-1221
    • Sosin, H.B.1
  • 21
    • 24944575872 scopus 로고    scopus 로고
    • Asian toll road development program: Review of recent toll road experiences in selected countries and preliminary tool kit for toll road development
    • World Bank, Washington, DC
    • World Bank and The Ministry of Construction of Japan (1999), "Asian toll road development program: review of recent toll road experiences in selected countries and preliminary tool kit for toll road development", Draft Final Report, World Bank, Washington, DC.
    • (1999) Draft Final Report
  • 22
    • 0008563034 scopus 로고    scopus 로고
    • NPV-at Risk method in infrastructure project investment evaluation
    • Ye, S. and Tiong, R.L.K. (2000), "NPV-at Risk method in infrastructure project investment evaluation", Journal of Construction Engineering and Management, ASCE, Vol. 126 No. 3, pp. 227-33.
    • (2000) Journal of Construction Engineering and Management, ASCE , vol.126 , Issue.3 , pp. 227-233
    • Ye, S.1    Tiong, R.L.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.