-
1
-
-
0035324669
-
A new heuristic and dominance relations for no-wait flowshops with setup times
-
May
-
T. A. Aldowaisan, "A new heuristic and dominance relations for no-wait flowshops with setup times," Computers and Operations Research, vol. 28, no. 6, pp. 563-584, May 2001.
-
(2001)
Computers and Operations Research
, vol.28
, Issue.6
, pp. 563-584
-
-
Aldowaisan, T.A.1
-
2
-
-
0032162519
-
Total flowtime in no-wait flowshops with separated setup times
-
Dec.
-
T. A. Aldowaisan, and A. Allahverdi, "Total flowtime in no-wait flowshops with separated setup times," Computers and Operations Research, vol. 25, no. 12, pp. 1025-1031, Dec. 1998.
-
(1998)
Computers and Operations Research
, vol.25
, Issue.12
, pp. 1025-1031
-
-
Aldowaisan, T.A.1
Allahverdi, A.2
-
3
-
-
8744313386
-
Scheduling in stochastic flowshops with independent setup
-
processing and removal times. Nov.
-
A. Allahverdi, "Scheduling in stochastic flowshops with independent setup," processing and removal times. Computers and Operations Research, vol. 24, no. 11, pp. 995-960, Nov. 1997.
-
(1997)
Computers and Operations Research
, vol.24
, Issue.11
, pp. 995-1960
-
-
Allahverdi, A.1
-
4
-
-
0014807274
-
A heuristic algorithm for the n-job, m-machine sequencing problem
-
Jun.
-
H. G. Campbell, R. A. Dudek, and M. L. Smith, "A heuristic algorithm for the n-job, m-machine sequencing problem," Management Science, vol. 16, no. 10, pp. 630-637, Jun. 1970.
-
(1970)
Management Science
, vol.16
, Issue.10
, pp. 630-637
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, M.L.3
-
5
-
-
0017516618
-
An evaluation of flowshop sequencing heuristics
-
Jul.
-
D. G. Dannenbring, "An evaluation of flowshop sequencing heuristics," Management Science, vol. 23, no. 11, pp. 1174-1182, Jul. 1977.
-
(1977)
Management Science
, vol.23
, Issue.11
, pp. 1174-1182
-
-
Dannenbring, D.G.1
-
6
-
-
0031281269
-
Two-stage no-wait scheduling models with setup and removal times
-
Nov.
-
J. N. D. Gupta, V. A. Strusevich, and C. Zwaneveld, "Two-stage no-wait scheduling models with setup and removal times," Computers and Operations Research, vol. 24, no. 11, pp. 1025-1031, Nov. 1997.
-
(1997)
Computers and Operations Research
, vol.24
, Issue.11
, pp. 1025-1031
-
-
Gupta, J.N.D.1
Strusevich, V.A.2
Zwaneveld, C.3
-
7
-
-
0030134958
-
A survey of machine scheduling problems with blocking and no-wait in process
-
May/Jun
-
N. G. Hall, and C. A. Sriskandarajah, "A survey of machine scheduling problems with blocking and no-wait in process," Operations Research, vol. 44, no. 3, pp. 510-525, May/Jun 1996.
-
(1996)
Operations Research
, vol.44
, Issue.3
, pp. 510-525
-
-
Hall, N.G.1
Sriskandarajah, C.A.2
-
8
-
-
0001326653
-
Scheduling a two-stage hybrid flowshop with separable setup and removal times
-
J. N. D. Gupta, and E. A. Tune, "Scheduling a two-stage hybrid flowshop with separable setup and removal times," European Journal of Operational Research, vol. 77, pp. 415-426, 1994.
-
(1994)
European Journal of Operational Research
, vol.77
, pp. 415-426
-
-
Gupta, J.N.D.1
Tune, E.A.2
-
9
-
-
0003075019
-
Optimal two and three stage production schedules with setup times included
-
S. M. Johnson, "Optimal two and three stage production schedules with setup times included," Naval research logistics quarterly, vol. 1, pp. 61-68, 1954.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
11
-
-
0022680737
-
Some no-wait shops scheduling problems: Complexity aspect
-
Mar.
-
C. Sriskandarajah, and P. Ladet, "Some no-wait shops scheduling problems: complexity aspect," European Journal of Operational Research, vol. 24, no. 3, pp. 424-445, Mar. 1986.
-
(1986)
European Journal of Operational Research
, vol.24
, Issue.3
, pp. 424-445
-
-
Sriskandarajah, C.1
Ladet, P.2
-
12
-
-
0024769054
-
Scheduling algorithms for flexible flowshops: Worst and average case performance
-
Nov.
-
C. Sriskandarajah, and P. Semis, "Scheduling algorithms for flexible flowshops: Worst and average case performance," European Journal of Operational Research, vol. 43, no. 2, pp. 143-160. Nov. 1989.
-
(1989)
European Journal of Operational Research
, vol.43
, Issue.2
, pp. 143-160
-
-
Sriskandarajah, C.1
Semis, P.2
-
13
-
-
0027906588
-
Performance of scheduling algorithms for no-wait flowshops with parallel machines
-
Nov.
-
C. Sriskandarajah, "Performance of scheduling algorithms for no-wait flowshops with parallel machines," European Journal of Operational Research, vol. 70, no. 3, pp. 365-378, Nov. 1993.
-
(1993)
European Journal of Operational Research
, vol.70
, Issue.3
, pp. 365-378
-
-
Sriskandarajah, C.1
-
14
-
-
0020816005
-
Sequency on two and three machines with setup, processing and removal times separated
-
Sep./Oct.
-
D. R. Sule, K. Y. Huang, "Sequency on two and three machines with setup, processing and removal times separated," International Journal of Production Research, vol. 21, no. 5, pp. 723-732, Sep./Oct. 1983.
-
(1983)
International Journal of Production Research
, vol.21
, Issue.5
, pp. 723-732
-
-
Sule, D.R.1
Huang, K.Y.2
-
15
-
-
0037771343
-
A heuristic for two-stage no-wait hybrid flowshop scheduling with a single machine in either stage
-
Feb.
-
Z. Liu, J. Xie, "A heuristic for two-stage no-wait hybrid flowshop scheduling with a single machine in either stage," Tsinghua Science and Technology, vol. 8, no. 1, pp. 43-48, Feb. 2003.
-
(2003)
Tsinghua Science and Technology
, vol.8
, Issue.1
, pp. 43-48
-
-
Liu, Z.1
Xie, J.2
-
16
-
-
0035312088
-
Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times
-
A. Allahverdi, T. Aldowaisan, "Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times," Journal of the Operational Research Society, vol. 52, pp. 449-462, 2001.
-
(2001)
Journal of the Operational Research Society
, vol.52
, pp. 449-462
-
-
Allahverdi, A.1
Aldowaisan, T.2
-
17
-
-
0036723791
-
No-wait flowshops with bicriteria of makespan and total completion time
-
A. Allahverdi, T. Aldowaisan, "No-wait flowshops with bicriteria of makespan and total completion time," Journal of the Operational Research Society, vol. 53, no. 9, pp. 1004-1015, 2002.
-
(2002)
Journal of the Operational Research Society
, vol.53
, Issue.9
, pp. 1004-1015
-
-
Allahverdi, A.1
Aldowaisan, T.2
|