메뉴 건너뛰기




Volumn , Issue , 2005, Pages 1-32

BENEFITS OF 3D AND 4D MODELS FOR FACILITY MANAGERS AND AEC SERVICE PROVIDERS

Author keywords

4D modeling; benefits; case studies; construction planning

Indexed keywords


EID: 85160483484     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.1201/9780203971123-3     Document Type: Chapter
Times cited : (23)

References (20)
  • 1
    • 0031635301 scopus 로고    scopus 로고
    • Time-space conflict analysis based on 4D production models
    • K.C.P. Wang (ed.), Reston, VA: ASCE
    • Akinci, B. and Fischer, M. 1998. Time-space conflict analysis based on 4D production models. In K.C.P. Wang (ed.), Proceedings of congress on computing in civil engineering: 342-353. Reston, VA: ASCE.
    • (1998) Proceedings of congress on computing in civil engineering , pp. 342-353
    • Akinci, B.1    Fischer, M.2
  • 5
    • 0029719190 scopus 로고    scopus 로고
    • Visual-based scheduling: 4D modeling on the San Mateo County Health Center
    • J. Vanegas and P. Chinowsky (eds), ASCE
    • Collier, E. and Fischer, M. 1996. Visual-based scheduling: 4D modeling on the San Mateo County Health Center. In J. Vanegas and P. Chinowsky (eds), Proceedings of the 3rd congress on computing in civil engineering: 800-805. ASCE.
    • (1996) Proceedings of the 3rd congress on computing in civil engineering , pp. 800-805
    • Collier, E.1    Fischer, M.2
  • 8
    • 0000693991 scopus 로고    scopus 로고
    • Scheduling with computer-interpretable construction method models
    • ASCE
    • Fischer, M.A. and Aalami, F. 1996. Scheduling with computer-interpretable construction method models. Journal of Construction Engineering and Management 122(4): 337-347. ASCE.
    • (1996) Journal of Construction Engineering and Management , vol.122 , Issue.4 , pp. 337-347
    • Fischer, M.A.1    Aalami, F.2
  • 13
  • 15
    • 0347234695 scopus 로고    scopus 로고
    • Planning and monitoring of construction projects using virtual reality
    • Retik, A. 1997. Planning and monitoring of construction projects using virtual reality. Project Management 3(1): 28-31.
    • (1997) Project Management , vol.3 , Issue.1 , pp. 28-31
    • Retik, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.