-
1
-
-
85135732705
-
EWE, Presentation Elektromobilität, J. Hermsmeier - EWE AG, Bullensee-Kreis, 26 November 2010,
-
Berlin, 2010.
-
EWE, Presentation Elektromobilität, J. Hermsmeier - EWE AG, Bullensee-Kreis, 26 November 2010, Berlin, 2010.
-
-
-
-
2
-
-
85135732929
-
-
EWE, Presentation Innovative Regulierung für intelligente Netze - praktische Erfahrungen von EWE NETZ, T. Maus - EWE NETZ GmbH, IRIN-Workshop, 6 October 2010, Berlin, 2010.
-
EWE, Presentation Innovative Regulierung für intelligente Netze - praktische Erfahrungen von EWE NETZ, T. Maus - EWE NETZ GmbH, IRIN-Workshop, 6 October 2010, Berlin, 2010.
-
-
-
-
4
-
-
33646364309
-
Nodal pricing for distribution networks: efficient pricing for efficiency enhancing DG
-
Sotkiewicz P.M., Vignolo J.M. Nodal pricing for distribution networks: efficient pricing for efficiency enhancing DG. IEEE Trans. Power Syst. 2006, 21(2):1013-1014.
-
(2006)
IEEE Trans. Power Syst.
, vol.21
, Issue.2
, pp. 1013-1014
-
-
Sotkiewicz, P.M.1
Vignolo, J.M.2
-
5
-
-
85135728349
-
-
EPRI, Estimating the Costs and Benefits of the Smart Grid, A Preliminary Estimate of the Investment Requirements and the Resultant Benefits of a Fully Functioning Smart Grid, Technical Report, 2011.
-
EPRI, Estimating the Costs and Benefits of the Smart Grid, A Preliminary Estimate of the Investment Requirements and the Resultant Benefits of a Fully Functioning Smart Grid, Technical Report, 2011.
-
-
-
-
6
-
-
85135732944
-
-
Ofgem, Ofgem reengineers network price controls to meet 32 billion low carbon investment challenge, Press Release 26 July 2010, 2010.
-
Ofgem, Ofgem reengineers network price controls to meet 32 billion low carbon investment challenge, Press Release 26 July 2010, 2010.
-
-
-
-
7
-
-
70449408960
-
Framework for assessing the economic efficiencies of long run network pricing models
-
Li F., Tolley D., Padhy N.P., Wang J. Framework for assessing the economic efficiencies of long run network pricing models. IEEE Trans. Power Syst. 2009, 24:1641-1648.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, pp. 1641-1648
-
-
Li, F.1
Tolley, D.2
Padhy, N.P.3
Wang, J.4
-
8
-
-
85135732592
-
-
BDEW, Abschätzung des Ausbaubedarfs in deutschen Verteilungsnetzen aufgrund von Photovoltaik- und Windeinspeisungen bis 2020. (accessed 08.04.11).
-
BDEW, Abschätzung des Ausbaubedarfs in deutschen Verteilungsnetzen aufgrund von Photovoltaik- und Windeinspeisungen bis 2020. (accessed 08.04.11). http://www.bdew.de/internet.nsf/id/77103B624B580EF0C125786B0054E259/$file/2011-03-30_BDEW-Gutachten%20EEG-bedingter%20Netzausbaubedarf%20VN.pdf,2011.
-
-
-
-
9
-
-
85128892931
-
-
C. Brandstätt, G. Brunekreeft, N. Friedrichsen, Locational signals to reduce network investments in smart distribution grids: what works and what not? Utilities Policy (2011), doi: 10.1016/j.jup.2011.07.001. Article in Press.
-
C. Brandstätt, G. Brunekreeft, N. Friedrichsen, Locational signals to reduce network investments in smart distribution grids: what works and what not? Utilities Policy (2011), doi: 10.1016/j.jup.2011.07.001. Article in Press.
-
-
-
-
10
-
-
85135730046
-
-
CEPA, Cambridge Economic Policy Associates Ltd Review of International Models of Transmission Charging Arrangements, A Report for Ofgem, 2011.
-
CEPA, Cambridge Economic Policy Associates Ltd Review of International Models of Transmission Charging Arrangements, A Report for Ofgem, 2011.
-
-
-
-
11
-
-
68349131737
-
Evaluating the impact of network investment deferral on distributed generation expansion
-
Piccolo A., Siano P. Evaluating the impact of network investment deferral on distributed generation expansion. IEEE Trans. Power Syst. 2009, 24(3):1559-1567.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.3
, pp. 1559-1567
-
-
Piccolo, A.1
Siano, P.2
-
12
-
-
85135732733
-
-
T. Ackermann, Distributed Resources in a Re-Regulated Market Environment. Ph.D. dissertation, Dept. Electrical Eng., KTH, Stockholm, 2004.
-
T. Ackermann, Distributed Resources in a Re-Regulated Market Environment. Ph.D. dissertation, Dept. Electrical Eng., KTH, Stockholm, 2004.
-
-
-
-
13
-
-
85135729642
-
-
F. Woolf, Global Transmission Expansion: Recipes for Success, CMS Cameron McKenna, 2003.
-
F. Woolf, Global Transmission Expansion: Recipes for Success, CMS Cameron McKenna, 2003.
-
-
-
-
14
-
-
18744392803
-
Electricity transmission: An overview of the current debate
-
Brunekreeft G., Neuhoff K., Newbery D. Electricity transmission: An overview of the current debate. Utilities Policy 2005, 13:73-93.
-
(2005)
Utilities Policy
, vol.13
, pp. 73-93
-
-
Brunekreeft, G.1
Neuhoff, K.2
Newbery, D.3
-
15
-
-
85135733482
-
-
F. Li, D. Tolley, N.P. Padhy, J. Wang, Network Benefits from Introducing an Economic Methodology for Distribution Charging, A study by the department of Electronic and Electrical Engineering, University of Bath, 2005.
-
F. Li, D. Tolley, N.P. Padhy, J. Wang, Network Benefits from Introducing an Economic Methodology for Distribution Charging, A study by the department of Electronic and Electrical Engineering, University of Bath, 2005.
-
-
-
-
16
-
-
36348942495
-
Long-run incremental cost-pricing based on unused capacity
-
Li F., Tolley D. Long-run incremental cost-pricing based on unused capacity. IEEE Trans. Power Syst. 2007, 22(4):1683-1689.
-
(2007)
IEEE Trans. Power Syst.
, vol.22
, Issue.4
, pp. 1683-1689
-
-
Li, F.1
Tolley, D.2
-
17
-
-
85135729704
-
-
BNetzA, Jahresbericht 2010, Annual report of the Federal Regulatory Agency of Germany for the year 2010. , 2011 (accessed 04.04.11).
-
BNetzA, Jahresbericht 2010, Annual report of the Federal Regulatory Agency of Germany for the year 2010. , 2011 (accessed 04.04.11). http://www.bundesnetzagentur.de/SharedDocs/Downloads/DE/BNetzA/Presse/Berichte/2011/Jahresbericht2010pdf.pdf?__blob=publicationFile.
-
-
-
-
18
-
-
0035727019
-
Zonal pricing in a deregulated electricity market
-
Björndal M., Jörnsten K. Zonal pricing in a deregulated electricity market. Energy J. 2001, 22(1):51-73.
-
(2001)
Energy J.
, vol.22
, Issue.1
, pp. 51-73
-
-
Björndal, M.1
Jörnsten, K.2
-
19
-
-
34249835223
-
Contract networks for electric power transmission
-
Hogan W.W. Contract networks for electric power transmission. J. Regul. Econom. 1992, 4(3):211-242.
-
(1992)
J. Regul. Econom.
, vol.4
, Issue.3
, pp. 211-242
-
-
Hogan, W.W.1
-
20
-
-
0003764550
-
-
Kluwer Academic Publishers, Norwell, MA
-
Schweppe F.C., Tabors R.D., Caramanis M.C., Bohn R.E. Spot Pricing of Electricity 1988, Kluwer Academic Publishers, Norwell, MA.
-
(1988)
Spot Pricing of Electricity
-
-
Schweppe, F.C.1
Tabors, R.D.2
Caramanis, M.C.3
Bohn, R.E.4
-
22
-
-
85135732339
-
-
K. Neuhoff, R. Boyd, International Experiences of Nodal Pricing Implementation - Frequently Asked Questions, Climate Policy Initiative/DIW Berlin, Climate Policy Initiative Working document - this Version February 2011. , 2011. (Accessed 04.08.11).
-
K. Neuhoff, R. Boyd, International Experiences of Nodal Pricing Implementation - Frequently Asked Questions, Climate Policy Initiative/DIW Berlin, Climate Policy Initiative Working document - this Version February 2011. , 2011. (Accessed 04.08.11). http://www.climatepolicyinitiative.org/files/attachments/99.pdf.
-
-
-
-
23
-
-
33947141570
-
Nodal pricing of electricity: how much does it cost to get it wrong?
-
Green R. Nodal pricing of electricity: how much does it cost to get it wrong?. J. Regul. Econom. 2007, 31(2):125-149.
-
(2007)
J. Regul. Econom.
, vol.31
, Issue.2
, pp. 125-149
-
-
Green, R.1
-
24
-
-
85135732312
-
-
A. van der Welle, J. De Joode, F. Van Oostvoorn, Regulatory Roadmaps for the Optimal Integration of Intermittent RES-E/DG in Electricity Systems, Final report of the RESPOND Project, 2009.
-
A. van der Welle, J. De Joode, F. Van Oostvoorn, Regulatory Roadmaps for the Optimal Integration of Intermittent RES-E/DG in Electricity Systems, Final report of the RESPOND Project, 2009.
-
-
-
-
25
-
-
85135729911
-
-
SGIP, Small Generator Interconnection Procedures, For Generating Facilities No Larger than 20 MW, The revisions to this document take effect August 28, 2006, per FERC Order No. 2006-B issued July 20, 2006, FERC Stats. Regs. 31,221, which was published in the Federal Register July 27, 2006 (71 FR 42587), as amended by the errata issued September 5, 2006, which was published in the Federal Register September 13, 2006 (71 FR 53965), 2006.
-
SGIP, Small Generator Interconnection Procedures, For Generating Facilities No Larger than 20 MW, The revisions to this document take effect August 28, 2006, per FERC Order No. 2006-B issued July 20, 2006, FERC Stats. Regs. 31,221, which was published in the Federal Register July 27, 2006 (71 FR 42587), as amended by the errata issued September 5, 2006, which was published in the Federal Register September 13, 2006 (71 FR 53965), 2006.
-
-
-
-
26
-
-
85135734003
-
-
Ofgem, Structure of Electricity Distribution Charges Initial Decision Document 142/03, November 2003.
-
Ofgem, Structure of Electricity Distribution Charges Initial Decision Document 142/03, November 2003.
-
-
-
-
27
-
-
85135731932
-
-
EC Directive 2003/54/EC concerning common rules for the internal market in electricity.
-
EC Directive 2003/54/EC concerning common rules for the internal market in electricity.
-
-
-
-
28
-
-
85135732771
-
-
Ofgem, Electricity Distribution Structure of Charges: Distribution Charging Methodology at Lower Voltages, Ofgem decision document, Nov. 2009.
-
Ofgem, Electricity Distribution Structure of Charges: Distribution Charging Methodology at Lower Voltages, Ofgem decision document, Nov. 2009.
-
-
-
-
29
-
-
85135729043
-
-
Ofgem, Decision on Revised Submission and Implementation Dates for the EHV Distribution Charging Methodology (EDCM). , 2010 (accessed 08.04.11).
-
Ofgem, Decision on Revised Submission and Implementation Dates for the EHV Distribution Charging Methodology (EDCM). , 2010 (accessed 08.04.11). http://www.ofgem.gov.uk/Networks/ElecDist/Policy/DistChrgs/Documents1/EDCM%20timelines%20decision.pdf.
-
-
-
-
30
-
-
85135730666
-
-
Ofgem, Delivering the Electricity Distribution Structure of Charges Project: Decision on Extra High Voltage Charging and Governance Arrangements, Ofgem decision document, July 2009.
-
Ofgem, Delivering the Electricity Distribution Structure of Charges Project: Decision on Extra High Voltage Charging and Governance Arrangements, Ofgem decision document, July 2009.
-
-
-
-
31
-
-
85135731127
-
-
M. Pollit, J.W. Bialek, Electricity Network Investment and Regulation for a Low-Carbon Future, Working Paper EPRG 0721, 2007.
-
M. Pollit, J.W. Bialek, Electricity Network Investment and Regulation for a Low-Carbon Future, Working Paper EPRG 0721, 2007.
-
-
-
-
32
-
-
85135730230
-
-
FERC, Order No. 745 Demand Response Compensation in Organized Wholesale Energy Markets, 2011.
-
FERC, Order No. 745 Demand Response Compensation in Organized Wholesale Energy Markets, 2011.
-
-
-
-
33
-
-
85135732861
-
-
CPUC, California Public Utility Commission Proposed Decision of Commissioner Lynch, 10 January 2003, Paragraph 8.3.2 Discussion: Contracting for Distributed Generation Obviates Need for Deaveraged Tariffs or Incentive Programs at This Time, 2003.
-
CPUC, California Public Utility Commission Proposed Decision of Commissioner Lynch, 10 January 2003, Paragraph 8.3.2 Discussion: Contracting for Distributed Generation Obviates Need for Deaveraged Tariffs or Incentive Programs at This Time, 2003.
-
-
-
-
34
-
-
85135734076
-
-
EEG, Erneuerbare-Energien-Gesetz [Renewable Energy Act] 25 October 2008, last changed 12 April 2011, 2009.
-
EEG, Erneuerbare-Energien-Gesetz [Renewable Energy Act] 25 October 2008, last changed 12 April 2011, 2009.
-
-
-
-
35
-
-
85135729713
-
-
KWKG, Kraft-Wärme-Kopplungsgesetz [Combined Heat and Power Act] 19 March 2002 last changed 21 August 2009, 2002.
-
KWKG, Kraft-Wärme-Kopplungsgesetz [Combined Heat and Power Act] 19 March 2002 last changed 21 August 2009, 2002.
-
-
-
-
36
-
-
85135734364
-
-
A. Moser, Versorgungssicherheit Strom: Energiewirtschaftliche und technische Dimensionen. [Power supply security: energy economical and technical dimensions], Presentation at Göttinger Energietagung 2011: Aspekte der Versorgungssicherheit Strom und Gas, Göttingen, 13 May 2011.
-
A. Moser, Versorgungssicherheit Strom: Energiewirtschaftliche und technische Dimensionen. [Power supply security: energy economical and technical dimensions], Presentation at Göttinger Energietagung 2011: Aspekte der Versorgungssicherheit Strom und Gas, Göttingen, 13 May 2011.
-
-
-
-
37
-
-
85135727999
-
-
BNetzA, Bundesnetzagentur, Monitoringbericht 2009 [Federal Regulatory Agency of Germany, Monitoring report 2009], 2009.
-
BNetzA, Bundesnetzagentur, Monitoringbericht 2009 [Federal Regulatory Agency of Germany, Monitoring report 2009], 2009.
-
-
-
-
38
-
-
85135734039
-
-
BMU, Development of Renewable Energy Sources in Germany 2010 - Graphics and Tables, Federal Ministry for the Environment, Nature Conservation and Nuclear Safety. , 2010 (accessed 12.05.10).
-
BMU, Development of Renewable Energy Sources in Germany 2010 - Graphics and Tables, Federal Ministry for the Environment, Nature Conservation and Nuclear Safety. , 2010 (accessed 12.05.10). http://www.bmu.de/files/pdfs/allgemein/application/pdf/ee_in_deutschland_graf_tab.pdf.
-
-
-
-
39
-
-
85135728138
-
-
German Federal Government, National Renewable Energy Action Plan in accordance with directive 2008/28/EC on the promotion of the use of energy from renewable sources. , 2010 (accessed 11.11.10)
-
German Federal Government, National Renewable Energy Action Plan in accordance with directive 2008/28/EC on the promotion of the use of energy from renewable sources. , 2010 (accessed 11.11.10). http://ec.europa.eu/energy/renewables/transparency_platform/doc/national_renewable_energy_action_plan_germany_en.pdf.
-
-
-
-
40
-
-
85135728336
-
-
BMWi, Energiekonzept für eine umweltschonende, zuverlässige und bezahlbare Energieversorgung, German Federal Ministry of Economics and Technology, Energy strategy for a sustainable, reliable and affordable energy supply. , 2010 (accessed 11.09.10).
-
BMWi, Energiekonzept für eine umweltschonende, zuverlässige und bezahlbare Energieversorgung, German Federal Ministry of Economics and Technology, Energy strategy for a sustainable, reliable and affordable energy supply. , 2010 (accessed 11.09.10). http://www.bmwi.de/BMWi/Redaktion/PDF/Publikationen/energiekonzept-property=pdf,bereich=bmwi,sprache=de,rwb=true.pdf.
-
-
-
-
41
-
-
85135732816
-
DENA, dena-Netzstudie II - Integration erneuerbarer Energien in die deutsche Stromversorgung im Zeitraum 2015-2020 mit Ausblick 2025.
-
[Dena grid study II - integration of renewable energies into German electricity supply 2015-2020 with an outlook to 2025], 2011.
-
DENA, dena-Netzstudie II - Integration erneuerbarer Energien in die deutsche Stromversorgung im Zeitraum 2015-2020 mit Ausblick 2025. [Dena grid study II - integration of renewable energies into German electricity supply 2015-2020 with an outlook to 2025], 2011.
-
-
-
-
42
-
-
85135731895
-
-
BNetzA, EEG-Statistikbericht 2008. Statistikbericht zur Jahresendabrechnung 2008 nach den Erneuerbare-Energien-Gesetz (EEG). [Statistical report for the annual settlement2008 as provided in the feed-in tariff]. Editorial deadline: March 2010. (accessed 01.04.11), 2010.
-
BNetzA, EEG-Statistikbericht 2008. Statistikbericht zur Jahresendabrechnung 2008 nach den Erneuerbare-Energien-Gesetz (EEG). [Statistical report for the annual settlement2008 as provided in the feed-in tariff]. Editorial deadline: March 2010. (accessed 01.04.11), 2010. http://www.bundesnetzagentur.de/cae/servlet/contentblob/153014/publicationFile/6555/100427StatistikberichtEEG2008pdf.pdf.
-
-
-
-
43
-
-
85135730010
-
-
BNetzA, EEG-Statistikbericht 2009. Statistikbericht zur Jahresendabrechnung 2009 nach den Erneuerbare-Energien-Gesetz (EEG). [Statistical report for the annual settlement2009 as provided in the feed-in tariff]. Editorial deadline: 28 March 2011. (accessed 01.04.11), 2011.
-
BNetzA, EEG-Statistikbericht 2009. Statistikbericht zur Jahresendabrechnung 2009 nach den Erneuerbare-Energien-Gesetz (EEG). [Statistical report for the annual settlement2009 as provided in the feed-in tariff]. Editorial deadline: 28 March 2011. (accessed 01.04.11), 2011. http://www.bundesnetzagentur.de/cae/servlet/contentblob/195642/publicationFile/10358/110318StatistikberichtEEG2009.pdf.
-
-
-
-
44
-
-
85135732695
-
StromNEV, §15 Verordnung über die Entgelte für den Zugang zu Elektrizitätsversorgungsnetzen,
-
25th Juli 2005 (BGBl. I S. 2225), last changed 3rd September 2010 (BGBl. I S. 1261), 2005.
-
StromNEV, §15 Verordnung über die Entgelte für den Zugang zu Elektrizitätsversorgungsnetzen, 25th Juli 2005 (BGBl. I S. 2225), last changed 3rd September 2010 (BGBl. I S. 1261), 2005.
-
-
-
-
45
-
-
85135729460
-
BR 868/10 Antrag des Freistaats Thüringen Entschließung des Bundesrates zur Herstellung gleichwertiger Lebensverhältnisse im Bundesgebiet durch Vereinheitlichung der Netzentgelte auf übertragungs- und Verteilnetzebene,
-
Bundesrat Drucksache 868/10, 22 December 2010.
-
BR 868/10 Antrag des Freistaats Thüringen Entschließung des Bundesrates zur Herstellung gleichwertiger Lebensverhältnisse im Bundesgebiet durch Vereinheitlichung der Netzentgelte auf übertragungs- und Verteilnetzebene, Bundesrat Drucksache 868/10, 22 December 2010.
-
-
-
-
46
-
-
85135733475
-
KraftNAV, Verordnung zur Regelung des Netzanschlusses von Anlagen zur Erzeugung von elektrischer Energie
-
[Ordinance on network connection of assets for the generation of electricity], 26 Juni 2007.
-
KraftNAV, Verordnung zur Regelung des Netzanschlusses von Anlagen zur Erzeugung von elektrischer Energie [Ordinance on network connection of assets for the generation of electricity], 26 Juni 2007.
-
-
-
-
47
-
-
85135728557
-
VDN, Einheitliche Berechnungsmethoden für Baukostenzuschüsse
-
[Uniform calculation methodologies for contributions to construction costs], 19 April 2007.
-
VDN, Einheitliche Berechnungsmethoden für Baukostenzuschüsse [Uniform calculation methodologies for contributions to construction costs], 19 April 2007.
-
-
-
-
48
-
-
85135729916
-
BNetzA, Bundesnetzagentur Positionspapier zur Erhebung von Baukostenzuschüssen (BKZ)
-
für Netzanschlüsse im Bereich von Netzebenen oberhalb der Niederspannung (BK6p-06-003) [Federal Regulatory Agency of Germany, position paper on the charging of contributions to construction costs] (05 January 2009), 2009.
-
BNetzA, Bundesnetzagentur Positionspapier zur Erhebung von Baukostenzuschüssen (BKZ) für Netzanschlüsse im Bereich von Netzebenen oberhalb der Niederspannung (BK6p-06-003) [Federal Regulatory Agency of Germany, position paper on the charging of contributions to construction costs] (05 January 2009), 2009.
-
-
-
-
49
-
-
85135732791
-
NAV, Verordnung über Allgemeine Bedingungen für den Netzanschluss und dessen Nutzung für die Elektrizitätsversorgung in Niederspannung
-
[Ordinance on the general conditions for network connection and utilization for eletricity supply at low voltage], 1st November 2006 (BGBl. I S. 2477), last changed 3rd September 2010 (BGBl. I S. 1261), 2010.
-
NAV, Verordnung über Allgemeine Bedingungen für den Netzanschluss und dessen Nutzung für die Elektrizitätsversorgung in Niederspannung [Ordinance on the general conditions for network connection and utilization for eletricity supply at low voltage], 1st November 2006 (BGBl. I S. 2477), last changed 3rd September 2010 (BGBl. I S. 1261), 2010.
-
-
-
-
50
-
-
85135728326
-
BNetzA, Bundesnetzagentur, Leitfaden zur Genehmigung individueller Netzentgeltvereinbarungen nach §19 Abs. 2 S. 1 und 2 StromNEV
-
[Federal Regulatory Agency of Germany, Guiding document on the approval of individual network tariffs as described in §19 Paragraph 2, sentence 1 and 2 of StromNEV], 2009.
-
BNetzA, Bundesnetzagentur, Leitfaden zur Genehmigung individueller Netzentgeltvereinbarungen nach §19 Abs. 2 S. 1 und 2 StromNEV [Federal Regulatory Agency of Germany, Guiding document on the approval of individual network tariffs as described in §19 Paragraph 2, sentence 1 and 2 of StromNEV], 2009.
-
-
-
-
51
-
-
85135731003
-
-
BNetzA, Bundesnetzagentur, Leitfaden zur Genehmigung individueller Netzentgeltvereinbarungen nach §19 Abs. 2 S. 1 und 2 StromNEV ab 2011 [Federal Regulatory Agency of Germany, Guiding document on the approval of individual network tariffs as described in §19 Paragraph 2, sentence 1 and 2 of StromNEV starting 2011] (document from 29 October 2010), 2010.
-
BNetzA, Bundesnetzagentur, Leitfaden zur Genehmigung individueller Netzentgeltvereinbarungen nach §19 Abs. 2 S. 1 und 2 StromNEV ab 2011 [Federal Regulatory Agency of Germany, Guiding document on the approval of individual network tariffs as described in §19 Paragraph 2, sentence 1 and 2 of StromNEV starting 2011] (document from 29 October 2010), 2010.
-
-
-
-
52
-
-
85135728503
-
-
BNetzA, Leitfaden zum EEG-Einspeisemanagement Version 1.0 [Federal Regulatory Agency of Germany, Guiding document for the curtailment of prioritized generators under the feed in tariff] (document from 03 March 2011). , (accessed 08.04.11), 2011.
-
BNetzA, Leitfaden zum EEG-Einspeisemanagement Version 1.0 [Federal Regulatory Agency of Germany, Guiding document for the curtailment of prioritized generators under the feed in tariff] (document from 03 March 2011). , (accessed 08.04.11), 2011. http://www.bundesnetzagentur.de/SharedDocs/Downloads/DE/BNetzA/Sachgebiete/Energie/ErneuerbareEnergienGesetz/LeitfadenEEGEinspeisemanagement/LeitfadenEEG_Version10_pdf.pdf;jsessionid=D3091117D63764F33395C23C94D68354?__blob=publicationFile.
-
-
-
-
53
-
-
79955900558
-
How to deal with negative power price spikes?-Flexible voluntary curtailment agreements for large-scale integration of wind
-
Brandstätt C., Brunekreeft G., Jahnke K. How to deal with negative power price spikes?-Flexible voluntary curtailment agreements for large-scale integration of wind. Energy Policy 2011, 39:3732-3740.
-
(2011)
Energy Policy
, vol.39
, pp. 3732-3740
-
-
Brandstätt, C.1
Brunekreeft, G.2
Jahnke, K.3
-
54
-
-
85135730031
-
EnWG, Energiewirtschaftsgesetz vom 7. Juli 2005 (BGBl. I S. 1970, 3621),
-
das zuletzt durch Artikel 4 des Gesetzes vom 7. März 2011 (BGBl. I S. 338) geändert worden ist [German Electricity Act from 7 July 2005, last changed on 7 March 2011], 2005.
-
EnWG, Energiewirtschaftsgesetz vom 7. Juli 2005 (BGBl. I S. 1970, 3621), das zuletzt durch Artikel 4 des Gesetzes vom 7. März 2011 (BGBl. I S. 338) geändert worden ist [German Electricity Act from 7 July 2005, last changed on 7 March 2011], 2005.
-
-
-
-
55
-
-
84917268705
-
Deregulation, Innovation and Market Liberalization - Electricity Regulation in a Continually Evolving Environment,
-
Routledge Studies in Business Organizations and Net-works, 2009.
-
L.L. Kiesling, Deregulation, Innovation and Market Liberalization - Electricity Regulation in a Continually Evolving Environment, Routledge Studies in Business Organizations and Net-works, 2009.
-
-
-
Kiesling, L.L.1
-
56
-
-
85135733900
-
-
BMWi, E-Energy - Auf dem Weg zum Internet der Energie, German Federal Ministry of Economics and Technology, E-Energy - on the way to an internet of energy, 2010 (accessed 01.04.11).
-
BMWi, E-Energy - Auf dem Weg zum Internet der Energie, German Federal Ministry of Economics and Technology, E-Energy - on the way to an internet of energy, 2010 (accessed 01.04.11). http://www.e-energy.de/documents/BMWI_Brosch_E_Energy_d_16_6_web.pdf.
-
-
-
-
57
-
-
51649094501
-
Pros and cons of exposing renewables to electricity market risks: A comparison of the market integration approaches in Germany, Spain, and the UK
-
Klessmann C., Nabe Ch., Burges K. Pros and cons of exposing renewables to electricity market risks: A comparison of the market integration approaches in Germany, Spain, and the UK. Energy Policy 2008, 36(10):3646-3661.
-
(2008)
Energy Policy
, vol.36
, Issue.10
, pp. 3646-3661
-
-
Klessmann, C.1
Nabe, C.2
Burges, K.3
|