메뉴 건너뛰기




Volumn , Issue , 2012, Pages

An object library approach for managing construction safety components based on BIM

Author keywords

BIM; CSCL; Design decision; Information technology; IPD

Indexed keywords

COMPUTER SOFTWARE REUSABILITY; CONTRACTORS; INFORMATION TECHNOLOGY; OBJECT ORIENTED PROGRAMMING; ROBOTICS; VISUAL LANGUAGES;

EID: 85085403922     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.4017/gt.2012.11.02.314.00     Document Type: Conference Paper
Times cited : (4)

References (18)
  • 3
    • 79953271744 scopus 로고    scopus 로고
    • BIM adoption and implementation for architectural practices
    • Arayici, Y., Coates, P., Koskela, L. and Kagioglou, M., "BIM adoption and implementation for architectural practices,", Structural Survey, Vol. 29 No. 1, pp. 7-25, 2011.
    • (2011) Structural Survey , vol.29 , Issue.1 , pp. 7-25
    • Arayici, Y.1    Coates, P.2    Koskela, L.3    Kagioglou, M.4
  • 7
    • 43049180004 scopus 로고    scopus 로고
    • Rapporteur's report: Research issues in prevention through design
    • Gambatese, J.A., "Rapporteur's Report: Research Issues in Prevention through Design,", Journal of Safety Research 39, 153-156, 2008.
    • (2008) Journal of Safety Research , vol.39 , pp. 153-156
    • Gambatese, J.A.1
  • 9
    • 77955715185 scopus 로고    scopus 로고
    • Two design patterns for facilitating building information modelbased synchronous collaboration
    • Isikdag, U. and Underwood, J., "Two design patterns for facilitating Building information Modelbased synchronous collaboration,", Automation in Construction 19, 544-553, 2010.
    • (2010) Automation in Construction , vol.19 , pp. 544-553
    • Isikdag, U.1    Underwood, J.2
  • 10
    • 77955332881 scopus 로고    scopus 로고
    • Understanding construction industry experience and attitudes toward integrated project delivery
    • Kent, D.C. and Becerik-Gerber, B., "Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery,", Journal of Construction Engineering and Management, Vol. 136, No. 8, 2010.
    • (2010) Journal of Construction Engineering and Management , vol.136 , Issue.8
    • Kent, D.C.1    Becerik-Gerber, B.2
  • 15
    • 85160473651 scopus 로고    scopus 로고
    • The link between design and process: Dynamic process simulation models of construction activities
    • Gainesville
    • Slaughter, S., "The link between design and process: Dynamic process simulation models of construction activities,", 4D CAD and visualization in construction: developments and applications, Gainesville, 145-164, 2005.
    • (2005) 4D CAD and Visualization in Construction: Developments and Applications , pp. 145-164
    • Slaughter, S.1
  • 18
    • 84857357863 scopus 로고    scopus 로고
    • Construction safety and digital design: A review
    • Zhou, W, Whyte, J. and Sacks, R., "Construction safety and digital design: A review,", Automation in Construction 22 102-111, 2012.
    • (2012) Automation in Construction , vol.22 , pp. 102-111
    • Zhou, W.1    Whyte, J.2    Sacks, R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.