메뉴 건너뛰기




Volumn , Issue , 1996, Pages 857-866

Innovative drilling of fork type dual lateral horizontal wells in PDO's sain Rawl field

Author keywords

[No Author keywords available]

Indexed keywords

GASOLINE; HORIZONTAL DRILLING; INFILL DRILLING; INJECTION (OIL WELLS); WATER INJECTION; WELL FLOODING;

EID: 85058404466     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (5)

References (4)
  • 2
    • 0029752691 scopus 로고    scopus 로고
    • Balanced risk management of drilling process accelerates field development at reducing horizontal well duration and cost
    • March
    • B. Ogidan, O. J. Akinmoladun: " Balanced Risk Management Of Drilling Process Accelerates Field Development At Reducing Horizontal Well Duration And Cost" Paper 35078, presented at 1996 IADC/SPE Drilling Conference In New Orleans Louisiana. March, 1996. Pages 313-323
    • (1996) 1996 IADC/SPE Drilling Conference in New Orleans Louisiana , pp. 313-323
    • Ogidan, B.1    Akinmoladun, O.J.2
  • 3
    • 85058444054 scopus 로고
    • QIT report on the mechanism and solutions to stuck casing in nahr umr shale formation in North Oman Shuaiba horizontal wells
    • June
    • O. J. Akinmoladun: "QIT Report On The Mechanism And Solutions To Stuck Casing In Nahr Umr Shale Formation In North Oman Shuaiba Horizontal Wells." Internal PDO Report, June 1994
    • (1994) Internal PDO Report
    • Akinmoladun, O.J.1
  • 4
    • 85058439922 scopus 로고    scopus 로고
    • Extended-length downhole mud motor designed for more power
    • 25/3/96
    • V. Krueger: "Extended-Length Downhole Mud Motor Designed For More Power", Oil/Gas Journal 25/3/96.
    • Oil/Gas Journal
    • Krueger, V.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.