|
Volumn 2003-May, Issue , 2003, Pages 1041-1047
|
Experience in operating world's first subsea separation and water injection station at Troll Oil Field in the North Sea
a a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
ELECTRIC CONNECTORS;
OFFSHORE OIL WELL PRODUCTION;
OFFSHORE OIL WELLS;
REPAIR;
SEPARATORS;
WATER INJECTION;
CONTINUOUS OPERATION;
DESIGN STRATEGIES;
ELECTRICAL CONNECTORS;
ELECTRICAL INTERFACE;
LOOP SYSTEMS;
MARINE OPERATIONS;
REPAIR OPERATIONS;
SUBSEA INSTALLATIONS;
WELL FLOODING;
|
EID: 85056095851
PISSN: 01603663
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (18)
|
References (3)
|