-
1
-
-
85058246709
-
-
BOMEL 055/88A, Billington, Osborne-Moss Engineering Ltd., London, June
-
"Detail Design Dossier for Repairs to Offshore Steel Structures", BOMEL 055/88A, Billington, Osborne-Moss Engineering Ltd., London, June, 1988.
-
(1988)
Detail Design Dossier for Repairs to Offshore Steel Structures
-
-
-
2
-
-
0022489182
-
Recent development in the reassessment, maintenance, and repair of steel offshore structures
-
Houston, May 5-8
-
Tebbett, I. E. and Lalani, M.: "Recent Development in the Reassessment, Maintenance, and Repair of Steel Offshore Structures", OTC 5113, Offshore Technology Conference, Houston, May 5-8, 1986.
-
(1986)
Offshore Technology Conference
-
-
Tebbett, I.E.1
Lalani, M.2
-
3
-
-
85058968129
-
BP west sole gas field platform structures in the southern north sea
-
Institute of Civil Engineers, London
-
Stuart, P. L.: "BP West Sole Gas Field Platform Structures in the Southern North Sea", Paper 8, Maintenance of Maritime Structures, Institute of Civil Engineers, London, 1978.
-
(1978)
Maintenance of Maritime Structures
-
-
Stuart, P.L.1
-
4
-
-
85058214170
-
Summary of current design and fatigue correlation
-
London, February 24-25
-
Fisher, P. J.: "Summary of Current Design and Fatigue Correlation", Paper 12, Fatigue in Offshore Structural Steels, Institute of Civil Engineers, London, February 24-25, 1981.
-
(1981)
Fatigue in Offshore Structural Steels, Institute of Civil Engineers
-
-
Fisher, P.J.1
-
5
-
-
85058932464
-
Experience with fatigue analysis and inspection results in the north sea
-
Houston, May 2-5
-
Green, M. B.: "Experience with Fatigue Analysis and Inspection Results in the North Sea", OTC 4524, Offshore Technology Conference, Houston, May 2-5, 1983.
-
(1983)
Offshore Technology Conference
-
-
Green, M.B.1
-
6
-
-
85058218870
-
Bolted repair of tubular joints
-
Glasgow, July
-
Fern, D. T. and Shear, L.: "Bolted Repair of Tubular Joints", Paper 23, Second International Symposium on the Integrity of Offshore Structures, Glasgow, July, 1981.
-
(1981)
Second International Symposium on the Integrity of Offshore Structures
-
-
Fern, D.T.1
Shear, L.2
-
7
-
-
85058220620
-
Repairing cracked nodes at ekofisk
-
February
-
"Repairing Cracked Nodes at Ekofisk", Ocean Industry, Vol 17, No 2, February, 1982, pp 46-47.
-
(1982)
Ocean Industry
, vol.17
, Issue.2
, pp. 46-47
-
-
-
9
-
-
85058216000
-
Structural integrity and the need for repair: A review of techniques to minimize subsea work
-
Aberdeen, November 5-8
-
Billington, C. J. and Nicholson, R. W.: "Structural Integrity and the Need for Repair: A Review of Techniques to Minimize Subsea Work", Inspection, Maintenance and Repair Conference, Association of Diving Contractors, Aberdeen, November 5-8, 1984.
-
(1984)
Inspection, Maintenance and Repair Conference, Association of Diving Contractors
-
-
Billington, C.J.1
Nicholson, R.W.2
-
10
-
-
85024508050
-
Grouted clamp system for frigg node repair
-
August
-
Chasseguet, D. and Cabrit, P,: "Grouted Clamp System for Frigg Node Repair", The Oilman, August, 1984, pp 68-69.
-
(1984)
The Oilman
, pp. 68-69
-
-
Chasseguet, D.1
Cabrit, P.2
-
11
-
-
85058229603
-
Clamp repair system aids subsea structures
-
November 94 97
-
Milner, B.: "Clamp Repair System Aids Subsea Structures", Offshore, Vol 44 No 12, November, 1984, pp 92, 94, 97.
-
(1984)
Offshore
, vol.44
, Issue.12
, pp. 92
-
-
Milner, B.1
-
12
-
-
85058239353
-
Wet and dry welding speeds mexican gulf repair
-
March
-
Hill, M. J.: "Wet and Dry Welding Speeds Mexican Gulf Repair", Offshore Engineer, March, 1985, pp 56-57.
-
(1985)
Offshore Engineer
, pp. 56-57
-
-
Hill, M.J.1
-
13
-
-
85058207541
-
Safety assessment of offshore structures with a known defect
-
Amsterdam
-
Wittenberg, L., Fricke, W., Payer, H. G. and Lloyd, G.: "Safety Assessment of Offshore Structures With a Known Defect", West Europe Marine Technology Conference Advances in Offshore Technology Symposium, Amsterdam, 1986.
-
(1986)
West Europe Marine Technology Conference Advances in Offshore Technology Symposium
-
-
Wittenberg, L.1
Fricke, W.2
Payer, H.G.3
Lloyd, G.4
-
14
-
-
84930130779
-
Fatigue design considerations for deepwater fixed platforms
-
Houston, May 7-9
-
Hanna, S. Y., Wang, W. J. and Nair, V. V. D.: "Fatigue Design Considerations for Deepwater Fixed Platforms", OTC 4774, Offshore Technology Conference, Houston, May 7-9, 1984.
-
(1984)
Offshore Technology Conference
-
-
Hanna, S.Y.1
Wang, W.J.2
Nair, V.V.D.3
-
15
-
-
85058244143
-
-
Mobil Research and Development Corporation, Dallas, TX, April
-
Salter, H. J.: "High Island A 573-B Reanalysis", Mobil Research and Development Corporation, Dallas, TX, April 1990.
-
(1990)
High Island a 573-B Reanalysis
-
-
Salter, H.J.1
-
18
-
-
84860253091
-
-
American Petroleum Institute, RP-2A, 18th edition, September 1
-
American Petroleum Institute, Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms, RP-2A, 18th edition, September 1, 1989.
-
(1989)
Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms
-
-
-
19
-
-
0023815942
-
Design of concentric tubular members
-
May 2-5, Houston
-
Imm, G. R. and Stahl, B.: "Design of Concentric Tubular Members", OTC 5836, Offshore Technology Conference, May 2-5, 1988, Houston.
-
(1988)
Offshore Technology Conference
-
-
Imm, G.R.1
Stahl, B.2
-
21
-
-
85058245945
-
-
The Welding Institute, Report, Cambridge, August
-
Maddox, S. J., Wylde, J. G. and Yamamoto, N.: "The Significance of Weld Profile in Tubular Joints Subjected to Fatigue Loading", The Welding Institute, Report no. 5553/6A/90, Cambridge, August, 1990.
-
(1990)
The Significance of Weld Profile in Tubular Joints Subjected to Fatigue Loading
-
-
Maddox, S.J.1
Wylde, J.G.2
Yamamoto, N.3
-
22
-
-
0024531862
-
Improving structural integrity by injection of grout into fatigue-critical nodes in offshore structures
-
Houston, May 1-4
-
Brown, G. M., Holmes, R. and McCann, D. L.: "Improving Structural Integrity by Injection of Grout Into Fatigue-Critical Nodes in Offshore Structures", OTC 5984, Offshore Technology Conference, Houston, May 1-4, 1989.
-
(1989)
Offshore Technology Conference
-
-
Brown, G.M.1
Holmes, R.2
McCann, D.L.3
-
23
-
-
85058242235
-
-
BOMEL 213/90 rev CI, Billington, Osborne-Moss Engineering Ltd., London, June
-
"High Island 573-B and 572-C Platform Stress Grouted Clamps for Conductor Guide Frames at -120' and -225' Elevations", BOMEL 213/90 rev CI, Billington, Osborne-Moss Engineering Ltd., London, June, 1990.
-
(1990)
High Island 573-B and 572-C Platform Stress Grouted Clamps for Conductor Guide Frames at -120' and -225' Elevations
-
-
-
24
-
-
84893026280
-
-
OTH 88 283, Department of Energy, London
-
Harwood, R. G. and Shuttleworth, E. P.: Grouted and Mechanical Strengthening and Repair of Tubular Steel Offshore Structures, OTH 88 283, Department of Energy, London, 1988.
-
(1988)
Grouted and Mechanical Strengthening and Repair of Tubular Steel Offshore Structures
-
-
Harwood, R.G.1
Shuttleworth, E.P.2
-
25
-
-
85054469998
-
Background to the use of structural clamps in the strengthening of two Gulf of Mexico platforms
-
Houston, May 6-9
-
Shuttleworth, E. P., Lalani, M.: "Background to the Use of Structural Clamps in the Strengthening of Two Gulf of Mexico Platforms", OTC 6654, Offshore Technology Conference, Houston, May 6-9, 1991.
-
(1991)
Offshore Technology Conference
-
-
Shuttleworth, E.P.1
Lalani, M.2
|