-
1
-
-
0003799788
-
-
Wiley, New York
-
Ang, A. H.-S. and Tang, W. H. (1975), Probability Concepts in Engineering Planning and Design, Vol. I, Wiley, New York.
-
(1975)
Probability Concepts in Engineering Planning and Design
, vol.1
-
-
Ang, A.H.-S.1
Tang, W.H.2
-
3
-
-
84948645065
-
-
3rd ed., McGraw-Hill, Sydney
-
Antill, J. M. and Farmer, B. E. (1991), Antill’s Engineering Management, 3rd ed., McGraw-Hill, Sydney.
-
(1991)
Antill’s Engineering Management
-
-
Antill, J.M.1
Farmer, B.E.2
-
4
-
-
84860157266
-
Performance Risk Associated with Renewable Energy CDM Projects
-
Balatbat, M. C. A., Findlay, E. and Carmichael, D. G. (2012), Performance Risk Associated with Renewable Energy CDM Projects, Journal of Management in Engineering, 28(1), 51-58.
-
(2012)
Journal of Management in Engineering
, vol.28
, Issue.1
, pp. 51-58
-
-
Balatbat, M.C.A.1
Findlay, E.2
Carmichael, D.G.3
-
5
-
-
0003845913
-
-
McGraw-Hill, New York
-
Benjamin, J. R. and Cornell, C. A. (1970), Probability, Statistics, and Decision for Civil Engineers, McGraw-Hill, New York.
-
(1970)
Probability, Statistics, and Decision for Civil Engineers
-
-
Benjamin, J.R.1
Cornell, C.A.2
-
6
-
-
34648823421
-
Are Real Options Actually Used in the Real World?
-
Block, S. (2007), Are Real Options Actually Used in the Real World?, The Engineering Economist, 52, 255-267.
-
(2007)
The Engineering Economist
, vol.52
, pp. 255-267
-
-
Block, S.1
-
7
-
-
0009501385
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
Canada, J. R. and White, J. A. (1980), Capital Investment Decision Analysis for Management and Engineering, Prentice-Hall, Englewood Cliffs, NJ.
-
(1980)
Capital Investment Decision Analysis for Management and Engineering
-
-
Canada, J.R.1
White, J.A.2
-
8
-
-
0347485773
-
-
Ellis Horwood Ltd. (John Wiley and Sons), Chichester, ISBN 0 85312 283 0
-
Carmichael, D. G. (1981), Structural Modelling and Optimization, Ellis Horwood Ltd. (John Wiley and Sons), Chichester, 306 pp, ISBN 0 85312 283 0.
-
(1981)
Structural Modelling and Optimization
, pp. 306
-
-
Carmichael, D.G.1
-
9
-
-
0003809223
-
-
Ellis Horwood Ltd. (John Wiley & Sons Ltd), Chichester, ISBN 0 7458 0212 5
-
Carmichael, D. G. (1987), Engineering Queues in Construction and Mining, Ellis Horwood Ltd. (John Wiley & Sons Ltd), Chichester, 378 pp, ISBN 0 7458 0212 5.
-
(1987)
Engineering Queues in Construction and Mining
, pp. 378
-
-
Carmichael, D.G.1
-
10
-
-
69249109921
-
-
Ellis Horwood Ltd. (John Wiley and Sons Ltd), Chichester, ISBN 0 7458 0706 2
-
Carmichael, D. G. (1989), Construction Engineering Networks, Ellis Horwood Ltd. (John Wiley and Sons Ltd), Chichester, 198 pp, ISBN 0 7458 0706 2.
-
(1989)
Construction Engineering Networks
, pp. 198
-
-
Carmichael, D.G.1
-
11
-
-
84871786224
-
-
A A Balkema, Rotterdam, ISBN 90 5809 324 7/333 6
-
Carmichael, D. G. (2000), Contracts and International Project Management, A A Balkema, Rotterdam, 208 pp, ISBN 90 5809 324 7/333 6.
-
(2000)
Contracts and International Project Management
, pp. 208
-
-
Carmichael, D.G.1
-
12
-
-
79960243832
-
-
A A Balkema, Rotterdam, (Swets & Zeitlinger B. V., Lisse), ISBN 90 5809 326 3
-
Carmichael, D. G. (2002), Disputes and International Projects, A A Balkema, Rotterdam, (Swets & Zeitlinger B. V., Lisse), 435 pp, ISBN 90 5809 326 3.
-
(2002)
Disputes and International Projects
, pp. 435
-
-
Carmichael, D.G.1
-
13
-
-
85055466565
-
-
A A Balkema, Rotterdam, (Swets & Zeitlinger B. V., Lisse), ISBN 90 5809 325 5
-
Carmichael, D. G. (2004), Project Management Framework, A A Balkema, Rotterdam, (Swets & Zeitlinger B. V., Lisse), 284 pp, ISBN 90 5809 325 5.
-
(2004)
Project Management Framework
, pp. 284
-
-
Carmichael, D.G.1
-
14
-
-
85055778651
-
-
Taylor & Francis, London, ISBN 13 9 78 0 415 34726 6, 10 0 415 34726 2
-
Carmichael, D. G. (2006), Project Planning, and Control, Taylor & Francis, London, 328 pp, ISBN 13 9 78 0 415 34726 6, 10 0 415 34726 2.
-
(2006)
Project Planning, and Control
, pp. 328
-
-
Carmichael, D.G.1
-
15
-
-
79958854435
-
An Alternative Approach to Capital Investment Appraisal
-
Carmichael, D. G. (2011), An Alternative Approach to Capital Investment Appraisal, The Engineering Economist, 56(2), 1-17.
-
(2011)
The Engineering Economist
, vol.56
, Issue.2
, pp. 1-17
-
-
Carmichael, D.G.1
-
16
-
-
84890717948
-
-
CRC Press, Taylor & Francis, London, ISBN 9781466570610, Cat K16494
-
Carmichael, D. G. (2013), Problem Solving for Engineers, CRC Press, Taylor & Francis, London, ISBN 9781466570610, Cat K16494.
-
(2013)
Problem Solving for Engineers
-
-
Carmichael, D.G.1
-
17
-
-
40749159684
-
Probabilistic DCF Analysis, and Capital Budgeting and Investment: A Survey
-
Carmichael, D. G. and Balatbat, M. C. A. (2008a), Probabilistic DCF Analysis, and Capital Budgeting and Investment: A Survey, The Engineering Economist, 53(1), 84-102.
-
(2008)
The Engineering Economist
, vol.53
, Issue.1
, pp. 84-102
-
-
Carmichael, D.G.1
Balatbat, M.C.A.2
-
18
-
-
84993102017
-
The Influence of Extra Projects on Overall Investment Feasibility
-
Carmichael, D. G. and Balatbat, M. C. A. (2008b), The Influence of Extra Projects on Overall Investment Feasibility, Journal of Financial Management of Property and Construction, 13(3), 161-175.
-
(2008)
Journal of Financial Management of Property and Construction
, vol.13
, Issue.3
, pp. 161-175
-
-
Carmichael, D.G.1
Balatbat, M.C.A.2
-
19
-
-
85080437968
-
The Incorporation of Uncertainty Associated with Climate Change into Infrastructure Investment Appraisal, Conference - Managing Projects
-
Sydney, unpublished
-
Carmichael, D. G. and Balatbat, M. C. A. (2009), The Incorporation of Uncertainty Associated with Climate Change into Infrastructure Investment Appraisal, Conference - Managing Projects, Programs and Ventures in Times of Uncertainty and Disruptive Change, Sydney, unpublished.
-
(2009)
Programs and Ventures in Times of Uncertainty and Disruptive Change
-
-
Carmichael, D.G.1
Balatbat, M.C.A.2
-
20
-
-
84969392702
-
A Review and Study of Project Investment Cash Flow Correlations
-
Carmichael, D. G. and Balatbat, M. C. A. (2010), A Review and Study of Project Investment Cash Flow Correlations, International Journal of Project Planning and Finance, 1(1), 1-21.
-
(2010)
International Journal of Project Planning and Finance
, vol.1
, Issue.1
, pp. 1-21
-
-
Carmichael, D.G.1
Balatbat, M.C.A.2
-
21
-
-
84857272915
-
Risk Associated with Managed Investment Primary Production Projects
-
Carmichael, D. G. and Balatbat, M. C. A. (2011), Risk Associated with Managed Investment Primary Production Projects, International Journal of Project Organisation and Management, 3(3/4), 273-289.
-
(2011)
International Journal of Project Organisation and Management
, vol.3
, Issue.3-4
, pp. 273-289
-
-
Carmichael, D.G.1
Balatbat, M.C.A.2
-
22
-
-
85080368489
-
-
The University of New South Wales, Sydney
-
Carmichael, D. G. and Bustamante, B. L. (2014), Interest Rate Uncertainty and Investment Value - A Second Order Moment Approach, School of Civil and Environmental Engineering, The University of New South Wales, Sydney.
-
(2014)
Interest Rate Uncertainty and Investment Value - A Second Order Moment Approach, School of Civil and Environmental Engineering
-
-
Carmichael, D.G.1
Bustamante, B.L.2
-
23
-
-
85080426781
-
-
The University of New South Wales, Sydney
-
Carmichael, D. G. and Handford, L. B. (2014), Equivalent Fixed-Rate and Variable-Rate Loans, School of Civil and Environmental Engineering, The University of New South Wales, Sydney.
-
(2014)
Equivalent Fixed-Rate and Variable-Rate Loans, School of Civil and Environmental Engineering
-
-
Carmichael, D.G.1
Handford, L.B.2
-
24
-
-
84857332115
-
Real Options Estimate Using Probabilistic Present Worth Analysis
-
Carmichael, D. G., Hersh, A. M. and Parasu, P. (2011), Real Options Estimate Using Probabilistic Present Worth Analysis, The Engineering Economist, 56(4), 295-320.
-
(2011)
The Engineering Economist
, vol.56
, Issue.4
, pp. 295-320
-
-
Carmichael, D.G.1
Hersh, A.M.2
Parasu, P.3
-
25
-
-
85080359445
-
-
School of Civil and Environmental Engineering, The University of New South Wales, Sydney
-
Carmichael, D. G., Lea, K. A. and Balatbat, M. C. A. (2014), The Financial Additionality and Viability of CDM Projects Allowing for Uncertainty, School of Civil and Environmental Engineering, The University of New South Wales, Sydney.
-
(2014)
The Financial Additionality and Viability of CDM Projects Allowing for Uncertainty
-
-
Carmichael, D.G.1
Lea, K.A.2
Balatbat, M.C.A.3
-
29
-
-
70449332093
-
-
Wharton School Publishing, Upper Saddle River, NJ
-
Damodaran, A. (2008), Strategic Risk Taking, Wharton School Publishing, Upper Saddle River, NJ.
-
(2008)
Strategic Risk Taking
-
-
Damodaran, A.1
-
30
-
-
0022266776
-
An Approximate Method for the Analysis of Uncertainty in Benefit-Cost Ratios
-
Dandy, G. C. (1985), An Approximate Method for the Analysis of Uncertainty in Benefit-Cost Ratios, Water Resources Research, 21(3), 267-271.
-
(1985)
Water Resources Research
, vol.21
, Issue.3
, pp. 267-271
-
-
Dandy, G.C.1
-
31
-
-
61849113702
-
Waiting Cost Models for Real Options
-
Eschenbach, T. G., Lewis, N. A. and Hartman, J. C. (2009), Waiting Cost Models for Real Options, The Engineering Economist, 54(1), 1-21.
-
(2009)
The Engineering Economist
, vol.54
, Issue.1
, pp. 1-21
-
-
Eschenbach, T.G.1
Lewis, N.A.2
Hartman, J.C.3
-
32
-
-
0001894589
-
The Derivation of Probabilistic Information for the Evaluation of Risky Investments
-
Hillier, F. S. (1963), The Derivation of Probabilistic Information for the Evaluation of Risky Investments, Management Science, 9(3), 443-457.
-
(1963)
Management Science
, vol.9
, Issue.3
, pp. 443-457
-
-
Hillier, F.S.1
-
33
-
-
0001894589
-
Supplement “To The Derivation of Probabilistic Information for the Evaluation of Risky Investments”
-
Hillier, F. S. (1965), Supplement “To The Derivation of Probabilistic Information for the Evaluation of Risky Investments”, Management Science, 11(3), 485-487.
-
(1965)
Management Science
, vol.11
, Issue.3
, pp. 485-487
-
-
Hillier, F.S.1
-
35
-
-
40749103772
-
Evaluating Risky Capital Investments
-
Hillier, F. S. and Heebink, D. V. (1965), Evaluating Risky Capital Investments, California Management Review, 8(2), 71-80.
-
(1965)
California Management Review
, vol.8
, Issue.2
, pp. 71-80
-
-
Hillier, F.S.1
Heebink, D.V.2
-
36
-
-
40749104208
-
The Consideration of Risk in Project Selection
-
Hodges, S. D. and Moore, P. G. (1968), The Consideration of Risk in Project Selection, Journal of the Institute of Actuaries, 94, 355-378.
-
(1968)
Journal of the Institute of Actuaries
, vol.94
, pp. 355-378
-
-
Hodges, S.D.1
Moore, P.G.2
-
40
-
-
0003890315
-
-
Prentice Hall, Upper Saddle River, NJ
-
Hull, J. C. (1997), Options, Futures, and Other Derivatives, Prentice Hall, Upper Saddle River, NJ.
-
(1997)
Options, Futures, and Other Derivatives
-
-
Hull, J.C.1
-
41
-
-
0003890315
-
-
5th ed. 2002, Prentice Hall, Upper Saddle River, NJ
-
Hull, J. C. (2002), Options, Futures and Other Derivatives. 5th ed. 2002, Prentice Hall, Upper Saddle River, NJ.
-
(2002)
Options, Futures and Other Derivatives
-
-
Hull, J.C.1
-
42
-
-
0003890315
-
-
6th ed., Prentice Hall, Upper Saddle River, NJ
-
Hull, J. C. (2006), Options, Futures and Other Derivatives, 6th ed., Prentice Hall, Upper Saddle River, NJ.
-
(2006)
Options, Futures and Other Derivatives
-
-
Hull, J.C.1
-
43
-
-
77953201603
-
A Study of Correlation Aspects in Probabilistic NPV Analysis
-
2010
-
Johar, K., Carmichael, D. G. and Balatbat, M. C. A. (2010), A Study of Correlation Aspects in Probabilistic NPV Analysis, The Engineering Economist, 55(2), 181-199, 2010.
-
(2010)
The Engineering Economist
, vol.55
, Issue.2
, pp. 181-199
-
-
Johar, K.1
Carmichael, D.G.2
Balatbat, M.C.A.3
-
44
-
-
84978569348
-
Estimation of Periodic Standard Deviations under the Pert and Derivation of Probabilistic Information
-
Kim, S. H. and Elsaid, H. H. (1988), Estimation of Periodic Standard Deviations under the Pert and Derivation of Probabilistic Information, Journal of Business Finance & Accounting, 15(4), 557-571.
-
(1988)
Journal of Business Finance & Accounting
, vol.15
, Issue.4
, pp. 557-571
-
-
Kim, S.H.1
Elsaid, H.H.2
-
45
-
-
40749160014
-
Derivation of an Intertemporal Correlation Coefficient Model Based on Cash Flow Components and Probabilistic Evaluation of a Project’s NPV
-
Kim, S. H., Hussein, H. E. and Kim, D. J. (1999), Derivation of an Intertemporal Correlation Coefficient Model Based on Cash Flow Components and Probabilistic Evaluation of a Project’s NPV, The Engineering Economist, 44(3), 276-294.
-
(1999)
The Engineering Economist
, vol.44
, Issue.3
, pp. 276-294
-
-
Kim, S.H.1
Hussein, H.E.2
Kim, D.J.3
-
47
-
-
50549097054
-
Can We Capture the Value of Option Volatility?
-
Lewis, N. A., Eschenbach, T. G. and Hartman, J. C. (2008), Can We Capture the Value of Option Volatility?, The Engineering Economist, 53(3), 230-258.
-
(2008)
The Engineering Economist
, vol.53
, Issue.3
, pp. 230-258
-
-
Lewis, N.A.1
Eschenbach, T.G.2
Hartman, J.C.3
-
48
-
-
33750549512
-
-
Research Paper No. 3, HWWI Research Programme on International Climate Policy, Hamburg, Germany
-
Michaelowa, A. (2005), CDM: Current Status and Possibilities for Reform, Hamburg Institute of International Economics, Research Paper No. 3, HWWI Research Programme on International Climate Policy, Hamburg, Germany.
-
(2005)
CDM: Current Status and Possibilities for Reform, Hamburg Institute of International Economics
-
-
Michaelowa, A.1
-
50
-
-
84857281370
-
-
Insead, Fontainebleau, France
-
Nielsen, L. T. (1992), Understanding N(d1) and N(d2): Risk-Adjusted Probabilities in the Black-Scholes Model, 16 pp., Insead, Fontainebleau, France.
-
(1992)
Understanding N(d1) and N(d2): Risk-Adjusted Probabilities in the Black-Scholes Model
, pp. 16
-
-
Nielsen, L.T.1
-
51
-
-
84909455807
-
-
Monograph AIIE-EE-73-1, The American Institute of Industrial Engineers, Atlanta, GA
-
Reisman, A. and Rao, A. K. (1973), Discounted Cash Flow Analysis: Stochastic Extensions, Monograph AIIE-EE-73-1, The American Institute of Industrial Engineers, Atlanta, GA.
-
(1973)
Discounted Cash Flow Analysis: Stochastic Extensions
-
-
Reisman, A.1
Rao, A.K.2
-
52
-
-
66949147291
-
Assessing the Additionality of CDM Projects: Practical Experiences and Lessons Learned
-
Schneider, L. (2009), Assessing the Additionality of CDM Projects: Practical Experiences and Lessons Learned, Climate Policy, 9(3), 242-254.
-
(2009)
Climate Policy
, vol.9
, Issue.3
, pp. 242-254
-
-
Schneider, L.1
-
53
-
-
0003553294
-
-
Massachusetts Institute of Technology Press, Cambridge, MA
-
Trigeorgis, L. (1996), Real Options, Massachusetts Institute of Technology Press, Cambridge, MA.
-
(1996)
Real Options
-
-
Trigeorgis, L.1
-
54
-
-
18344385876
-
Making Use of Real Options Simple: An Overview and Applications in Flexible/Modular Decision Making
-
Trigeorgis, L. (2005), Making Use of Real Options Simple: An Overview and Applications in Flexible/Modular Decision Making, The Engineering Economist, 50(1), 25-53.
-
(2005)
The Engineering Economist
, vol.50
, Issue.1
, pp. 25-53
-
-
Trigeorgis, L.1
-
55
-
-
0026822970
-
Probability Distribution for Benefit/Cost Ratio and Net Benefit
-
Tung, Y. K. (1992), Probability Distribution for Benefit/Cost Ratio and Net Benefit, Journal of Water Resources Planning and Management, 118(2), 133-150.
-
(1992)
Journal of Water Resources Planning and Management
, vol.118
, Issue.2
, pp. 133-150
-
-
Tung, Y.K.1
-
56
-
-
33750604853
-
-
ed. M.-K. Lee, UNEP Risoe Centre, Roskilde, Denmark
-
UNEP Risoe (2003), CDM Information and Guidebook, ed. M.-K. Lee, UNEP Risoe Centre, Roskilde, Denmark.
-
(2003)
CDM Information and Guidebook
-
-
-
57
-
-
46049084204
-
-
CD4CDM project, UNEP (United Nations Environment Program) Risoe Centre, Roskilde, Denmark
-
UNEP Risoe (2007), Guide to Financing CDM Projects, CD4CDM project, UNEP (United Nations Environment Program) Risoe Centre, Roskilde, Denmark.
-
(2007)
Guide to Financing CDM Projects
-
-
-
58
-
-
84883490532
-
-
Accessed 9 September 2012
-
UNFCCC (United Nations Framework Convention on Climate Change) (2011a), Guidelines on the Assessment of Investment Analysis, http://cdm.unfccc.int/Reference/Guidclarif/reg/reg_guid03.pdf [Accessed 9 September 2012].
-
(2011)
Guidelines on the Assessment of Investment Analysis
-
-
-
59
-
-
84889260946
-
-
Accessed 9 September 2012
-
UNFCCC (United Nations Framework Convention on Climate Change) (2011b), Tool for the Demonstration and Assessment of Additionality, http://cdm.unfccc.int/methodologies/PAmethodologies/tools/am-tool-01-v6.0.0.pdf [Accessed 9 September 2012].
-
(2011)
Tool for the Demonstration and Assessment of Additionality
-
-
-
60
-
-
85080369816
-
-
Accessed 9 September 2012
-
UNFCCC (United Nations Framework Convention on Climate Change) (2012), What Is the CDM, http://cdm.unfccc.int/about/index.html [Accessed 9 September 2012].
-
(2012)
What Is the CDM
-
-
-
61
-
-
17744385169
-
A Statistical Analysis of Risk in Capital Investment Projects
-
Wagle, B. (1967), A Statistical Analysis of Risk in Capital Investment Projects, Operational Research Society, 18(1), 13-33.
-
(1967)
Operational Research Society
, vol.18
, Issue.1
, pp. 13-33
-
-
Wagle, B.1
|