메뉴 건너뛰기




Volumn 6, Issue , 2018, Pages 12412-12424

A critical analysis of software risk management techniques in large scale systems

Author keywords

large scale system; risk factors; Risk management; risk management tools

Indexed keywords

COMPUTER SOFTWARE; DECISION MAKING; INDUSTRY; LARGE SCALE SYSTEMS; MONITORING; PLANNING; RISK ASSESSMENT; RISK PERCEPTION; RISKS; SOFTWARE DESIGN; SOFTWARE ENGINEERING; TOOLS;

EID: 85042113676     PISSN: None     EISSN: 21693536     Source Type: Journal    
DOI: 10.1109/ACCESS.2018.2805862     Document Type: Article
Times cited : (25)

References (39)
  • 1
    • 84938805304 scopus 로고    scopus 로고
    • Software risk management: Importance and practices
    • M. Chowdhury, A. Al, and S. Arefeen, "Software risk management: Importance and practices," in Proc. IJCIT ISSN, 2011, pp. 2078-5828.
    • (2011) Proc. IJCIT ISSN , pp. 2078-5828
    • Chowdhury, M.1    Al, A.2    Arefeen, S.3
  • 2
    • 0019610159 scopus 로고
    • Risk reduction as a managerial motive for conglomerate mergers
    • Y. Amihud and B. Lev, "Risk reduction as a managerial motive for conglomerate mergers," Bell J. Econ., vol. 12, no. 12, pp. 605-617, 1981.
    • (1981) Bell J. Econ. , vol.12 , Issue.12 , pp. 605-617
    • Amihud, Y.1    Lev, B.2
  • 3
    • 84924756883 scopus 로고    scopus 로고
    • Choosing project risk management techniques. A theoretical framework
    • A. Cagliano, S. Grimaldi, and C. Rafele, "Choosing project risk management techniques. A theoretical framework," J. Risk Res., vol. 18, no. 2, pp. 232-248, 2015.
    • (2015) J. Risk Res. , vol.18 , Issue.2 , pp. 232-248
    • Cagliano, A.1    Grimaldi, S.2    Rafele, C.3
  • 4
    • 85027065277 scopus 로고    scopus 로고
    • Top fifty software risk factors and the best thirty risk management techniques in software development lifecycle for successful software projects
    • A. Elzamly, B. Hussin, and N. M. Salleh, "Top fifty software risk factors and the best thirty risk management techniques in software development lifecycle for successful software projects," Int. J. Hybrid Inf. Technol., vol. 9, no. 6, pp. 11-32, 2016.
    • (2016) Int. J. Hybrid Inf. Technol. , vol.9 , Issue.6 , pp. 11-32
    • Elzamly, A.1    Hussin, B.2    Salleh, N.M.3
  • 5
    • 85026653960 scopus 로고    scopus 로고
    • Towards an efficient risk assessment in software projects-Fuzzy reinforcement paradigm
    • [Online].
    • A. Kumar, O. Samuel, X. Li, M. Abdel-Basset, and H. Wang, "Towards an efficient risk assessment in software projects-Fuzzy reinforcement paradigm," Comput. Elect. Eng., 2017. [Online]. Available: Http://dx.doi.org/10.1016/j.compeleceng.2017.07.022
    • (2017) Comput. Elect. Eng.
    • Kumar, A.1    Samuel, O.2    Li, X.3    Abdel-Basset, M.4    Wang, H.5
  • 6
    • 79960567300 scopus 로고    scopus 로고
    • Top ten lists of software project risks: Evidence from the literature survey
    • T. Arnuphaptrairong, "Top ten lists of software project risks: Evidence from the literature survey," in Proc. Int. Multiconf. Eng. Comput. Sci., vol. 1. 2011, pp. 1-6.
    • (2011) Proc. Int. Multiconf. Eng. Comput. Sci. , vol.1 , pp. 1-6
    • Arnuphaptrairong, T.1
  • 7
    • 84855895707 scopus 로고    scopus 로고
    • Knowledgebased risk management framework for information technology project
    • Feb
    • S. Alhawari, L. Karadsheh, A. N. Talet, and E. Mansour, "Knowledgebased risk management framework for information technology project," Int. J. Inf. Manage., vol. 32, no. 1, pp. 50-65, Feb. 2012.
    • (2012) Int. J. Inf. Manage. , vol.32 , Issue.1 , pp. 50-65
    • Alhawari, S.1    Karadsheh, L.2    Talet, A.N.3    Mansour, E.4
  • 9
    • 84911983031 scopus 로고    scopus 로고
    • Impact of risk management on project performance: The importance of soft skills
    • M. M. de Carvalho and R. R. Junior, "Impact of risk management on project performance: The importance of soft skills," Int. J. Prod. Res., vol. 53, no. 2, pp. 321-340, 2015.
    • (2015) Int. J. Prod. Res. , vol.53 , Issue.2 , pp. 321-340
    • De Carvalho, M.M.1    Junior, R.R.2
  • 11
    • 84944088860 scopus 로고    scopus 로고
    • A software application for rapid risk assessment in integrated supply chains
    • Jan.
    • F. Aqlan, "A software application for rapid risk assessment in integrated supply chains," Expert Syst. Appl., vol. 43, pp. 109-116, Jan. 2016.
    • (2016) Expert Syst. Appl. , vol.43 , pp. 109-116
    • Aqlan, F.1
  • 12
    • 85044296810 scopus 로고    scopus 로고
    • A short review for selecting the best tools and techniques to perform software risk management
    • M. F. Rabbi and K. O. B. Mannan, "A short review for selecting the best tools and techniques to perform software risk management," Eur. J. Adv. Eng. Technol., vol. 3, no. 6, pp. 1-7, 2016.
    • (2016) Eur. J. Adv. Eng. Technol. , vol.3 , Issue.6 , pp. 1-7
    • Rabbi, M.F.1    Mannan, K.O.B.2
  • 13
    • 0027601346 scopus 로고
    • Risk associated with software development: Aholistic framework for assessment and management
    • May
    • C. Chittister and Y. Y. Haimes, "Risk associated with software development: Aholistic framework for assessment and management," IEEE Trans. Syst., Man, Cybern., vol. 23, no. 3, pp. 710-723, May 1993.
    • (1993) IEEE Trans. Syst., Man, Cybern. , vol.23 , Issue.3 , pp. 710-723
    • Chittister, C.1    Haimes, Y.Y.2
  • 14
    • 0027148168 scopus 로고
    • Requirements and design change in large-scale software development: Analysis from the viewpoint of process backtracking
    • May
    • T. Tamai and A. Itou, "Requirements and design change in large-scale software development: Analysis from the viewpoint of process backtracking," in Proc. 15th Int. Conf. Softw. Eng., May 1993, pp. 167-176.
    • (1993) Proc. 15th Int. Conf. Softw. Eng. , pp. 167-176
    • Tamai, T.1    Itou, A.2
  • 15
    • 0031512352 scopus 로고    scopus 로고
    • Risk mitigation in large-scale systems: Lessons from high reliability organizations
    • M. Grabowski and K. Roberts, "Risk mitigation in large-scale systems: Lessons from high reliability organizations," California Manage. Rev., vol. 39, no. 4, pp. 152-161, 1997.
    • (1997) California Manage. Rev. , vol.39 , Issue.4 , pp. 152-161
    • Grabowski, M.1    Roberts, K.2
  • 16
    • 9144256179 scopus 로고    scopus 로고
    • Assessing risk in ERP projects: Identify and prioritize the factors
    • S.-M. Huang, "Assessing risk in ERP projects: Identify and prioritize the factors," Ind. Manage. Data Syst., vol. 104, no. 8, pp. 681-688, 2004.
    • (2004) Ind. Manage. Data Syst. , vol.104 , Issue.8 , pp. 681-688
    • Huang, S.-M.1
  • 19
    • 34248326773 scopus 로고    scopus 로고
    • Ultra-large-scale systems: The software challenge of the future
    • Carnegie Mellon Univ., Pittsburgh, PA, USA, Tech. Rep
    • L. Northrop, "Ultra-large-scale systems: The software challenge of the future," Softw. Eng. Inst., Carnegie Mellon Univ., Pittsburgh, PA, USA, Tech. Rep., 2006.
    • (2006) Softw. Eng. Inst.
    • Northrop, L.1
  • 20
    • 4243202765 scopus 로고    scopus 로고
    • Software project risks and their effect on outcomes
    • Apr
    • L. Wallace and M. Keil, "Software project risks and their effect on outcomes," Commun. ACM, vol. 47, no. 4, pp. 68-73, Apr. 2004.
    • (2004) Commun. ACM , vol.47 , Issue.4 , pp. 68-73
    • Wallace, L.1    Keil, M.2
  • 21
    • 84929324916 scopus 로고    scopus 로고
    • Risk management for IT and software projects
    • Berlin, Germany Springer
    • E. Wallmüller, M. Wieczorek, U. Naujoks, and B. Bartlett, "Risk management for IT and software projects," in Business Continuity. Berlin, Germany: Springer, 2002, pp. 165-178.
    • (2002) Business Continuity , pp. 165-178
    • Wallmüller, E.1    Wieczorek, M.2    Naujoks, U.3    Bartlett, B.4
  • 22
    • 0035201702 scopus 로고    scopus 로고
    • Use and benefits of tools for project risk management
    • Jan
    • T. Raz and E. Michael, "Use and benefits of tools for project risk management," Int. J. Project Manage., vol. 19, no. 1, pp. 9-17, Jan. 2001.
    • (2001) Int. J. Project Manage. , vol.19 , Issue.1 , pp. 9-17
    • Raz, T.1    Michael, E.2
  • 23
    • 84960362649 scopus 로고    scopus 로고
    • Classification and identification of risk management techniques for mitigating risks with factor analysis technique in software risk management
    • A. Elzamly and B. Hussin, "Classification and identification of risk management techniques for mitigating risks with factor analysis technique in software risk management," Rev. Comput. Eng. Res., vol. 2, no. 2, pp. 22-38, 2015.
    • (2015) Rev. Comput. Eng. Res. , vol.2 , Issue.2 , pp. 22-38
    • Elzamly, A.1    Hussin, B.2
  • 24
    • 0034340029 scopus 로고    scopus 로고
    • Risk factors in enterprise-wide/ERP projects
    • Dec
    • M. Sumner, "Risk factors in enterprise-wide/ERP projects," J. Inf. Tech-nol., vol. 15, no. 4, pp. 317-327, Dec. 2000.
    • (2000) J. Inf. Tech-nol. , vol.15 , Issue.4 , pp. 317-327
    • Sumner, M.1
  • 25
    • 0025791156 scopus 로고
    • Software risk management: Principles and practices
    • Jan
    • B. W. Boehm, "Software risk management: Principles and practices," IEEE Softw., vol. 8, no. 1, pp. 32-41, Jan. 1991.
    • (1991) IEEE Softw. , vol.8 , Issue.1 , pp. 32-41
    • Boehm, B.W.1
  • 26
    • 0034894377 scopus 로고    scopus 로고
    • Identifying software project risks: An international Delphi study
    • R. Schmidt, K. Lyytinen, M. Keil, and P. Cule, "Identifying software project risks: An international Delphi study," J. Manage. Inf. Syst., vol. 17, no. 4, pp. 5-36, 2001.
    • (2001) J. Manage. Inf. Syst. , vol.17 , Issue.4 , pp. 5-36
    • Schmidt, R.1    Lyytinen, K.2    Keil, M.3    Cule, P.4
  • 27
    • 71549173177 scopus 로고
    • Toward an assessment of software development risk
    • H. Barki, S. Rivard, and J. Talbot, "Toward an assessment of software development risk," J. Manage. Inf. Syst., vol. 10, no. 2, pp. 203-225, 1993.
    • (1993) J. Manage. Inf. Syst. , vol.10 , Issue.2 , pp. 203-225
    • Barki, H.1    Rivard, S.2    Talbot, J.3
  • 28
    • 84870695190 scopus 로고    scopus 로고
    • A case study of risk management in agile systems development
    • Verona, Italy
    • S. Coyle and K. Conboy, "A case study of risk management in agile systems development," in Proc. 17th Eur. Conf. Inf. Syst., Verona, Italy, 2009, pp. 2567-2578.
    • (2009) Proc. 17th Eur. Conf. Inf. Syst. , pp. 2567-2578
    • Coyle, S.1    Conboy, K.2
  • 29
    • 84932098839 scopus 로고    scopus 로고
    • Modelling and evaluating software project risks with quantitative analysis techniques in planning software development
    • A. Elzamly and B. Hussin, "Modelling and evaluating software project risks with quantitative analysis techniques in planning software development," J. Comput. Inf. Technol., vol. 23, no. 2, pp. 123-139, 2015.
    • (2015) J. Comput. Inf. Technol. , vol.23 , Issue.2 , pp. 123-139
    • Elzamly, A.1    Hussin, B.2
  • 31
    • 85044285774 scopus 로고    scopus 로고
    • Study of different risk management model and risk knowledge acquisition with WEKA
    • Jun./Jul
    • K. Kaur, A. Kaur, and R. Kaur, "Study of different risk management model and risk knowledge acquisition with WEKA," Int. J. Eng. Res. General Sci., vol. 2, no. 4, pp. 26-35, Jun./Jul. 2014.
    • (2014) Int. J. Eng. Res. General Sci. , vol.2 , Issue.4 , pp. 26-35
    • Kaur, K.1    Kaur, A.2    Kaur, R.3
  • 32
    • 3743050163 scopus 로고    scopus 로고
    • Large-scale project management is risk management
    • Jul
    • R. N. Charette, "Large-scale project management is risk management," IEEE Softw., vol. 13, no. 4, pp. 110-117, Jul. 1996.
    • (1996) IEEE Softw. , vol.13 , Issue.4 , pp. 110-117
    • Charette, R.N.1
  • 35
    • 0012023999 scopus 로고    scopus 로고
    • Empirical evaluation of a risk management method
    • J. Kontio and V. R. Basili, "Empirical evaluation of a risk management method," in Proc. SEI Conf. Risk Manage., 1997, pp. 1-8.
    • (1997) Proc. SEI Conf. Risk Manage , pp. 1-8
    • Kontio, J.1    Basili, V.R.2
  • 37
    • 0242650673 scopus 로고
    • Taxonomy-based risk identification
    • Carnegie Mellon Univ., Pittsburgh, PA, USA, Tech. Rep. CMU/SEI-93-TR-06
    • M. J. Carr, S. L. Konda, I. Monarch, F. C. Ulrich, and C. F. Walker, "Taxonomy-based risk identification," Softw. Eng. Inst., Carnegie Mellon Univ., Pittsburgh, PA, USA, Tech. Rep. CMU/SEI-93-TR-06, 1993.
    • (1993) Softw. Eng. Inst.
    • Carr, M.J.1    Konda, S.L.2    Monarch, I.3    Ulrich, F.C.4    Walker, C.F.5
  • 38
    • 0009609444 scopus 로고
    • An introduction to team risk management
    • Carnegie Mellon Univ., Pittsburgh, PA, USA, Special Rep. CMU/SEI-94-SR-1 version 1.0
    • R. P. Higuera, D. Gluch, A. J. Dorofee, R. L. Murphy, J. A. Walker, and R. C. Williams, "An introduction to team risk management," Softw. Eng. Inst., Carnegie Mellon Univ., Pittsburgh, PA, USA, Special Rep. CMU/SEI-94-SR-1 version 1.0, 1994.
    • (1994) Softw. Eng. Inst.
    • Higuera, R.P.1    Gluch, D.2    Dorofee, A.J.3    Murphy, R.L.4    Walker, J.A.5    Williams, R.C.6


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.