메뉴 건너뛰기




Volumn , Issue , 2004, Pages

A new method for computing pseudo-time for real gas flow using the material balance equation

Author keywords

[No Author keywords available]

Indexed keywords

COMPRESSIBILITY; ERRORS; GASES; GASOLINE; OIL WELLS; POROSITY; POROUS MATERIALS; RESERVOIR MANAGEMENT; VISCOSITY; WELL TESTING;

EID: 85036473559     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (6)

References (10)
  • 1
    • 0002888344 scopus 로고
    • The Flow of Real Gases through Porous Media
    • May
    • AL-HUSSAINY, R., RAMYEY, H.J., JR. and CRAWFORD, P.B., The Flow of Real Gases through Porous Media, JPT, pp. 625-636, May 1966.
    • (1966) JPT , pp. 625-636
    • Al-Hussainy, R.1    Ramyey, H.J.2    Crawford, P.B.3
  • 2
    • 85058847652 scopus 로고
    • Real Gas Pseudo-Time” – A New Function for Pressure Buildup Analysis of MHF Gas Wells
    • Paper SPE 8279 Las Vegas, NV, September 23-26
    • AGARWAL, R.G., “Real Gas Pseudo-Time” – A New Function for Pressure Buildup Analysis of MHF Gas Wells, Paper SPE 8279 presented at AFTCE, Las Vegas, NV, September 23-26, 1979.
    • (1979) AFTCE
    • Agarwal, R.G.1
  • 3
    • 0042251774 scopus 로고
    • Simplified Equations of Flow in Gas Drive Reservoirs and the Theoretical Foundation of Multiphase Pressure Buildup Analyses
    • MARTIN, J.C., Simplified Equations of Flow in Gas Drive Reservoirs and the Theoretical Foundation of Multiphase Pressure Buildup Analyses, Trans. AIME, Vol. 216, pp. 309-311, 1959.
    • (1959) Trans. AIME , vol.216 , pp. 309-311
    • Martin, J.C.1
  • 4
    • 85057430943 scopus 로고
    • Rapid Methods for Reservoir Compressibilities
    • April
    • RAMEY, H.J., JR., Rapid Methods for Reservoir Compressibilities, JPT, pp. 447-454, April 1961.
    • (1961) JPT , pp. 447-454
    • Ramey, H.J.1
  • 5
    • 0020273499 scopus 로고
    • Application of Pseudotime to Buildup Test Analysis of Low-Permeability Gas Wells with Long-Duration Wellbore Storage Distortion
    • December
    • LEE, W.J. and HOLDITCH, S.A., Application of Pseudotime to Buildup Test Analysis of Low-Permeability Gas Wells with Long-Duration Wellbore Storage Distortion, JPT, pp. 2877-2887, December 1982.
    • (1982) JPT , pp. 2877-2887
    • Lee, W.J.1    Holditch, S.A.2
  • 6
    • 0023562430 scopus 로고
    • Gas Reservoir Decline-Curve Analysis Using Type Curves with Real Gas Pseudopressure and Normalized Time
    • December
    • FRAIM, M.L. and WATTENBARGER, R.A., Gas Reservoir Decline-Curve Analysis Using Type Curves with Real Gas Pseudopressure and Normalized Time, SPE Formation Evaluation, December 1987.
    • (1987) SPE Formation Evaluation
    • Fraim, M.L.1    Wattenbarger, R.A.2
  • 7
    • 84889264572 scopus 로고
    • Z Abnormally Pressured Gas Reservoirs
    • Paper SPE 10125 San Antonio, TX, October 5-7
    • RAMAGOST, B.P. and FARSHAD, F.F., p/Z Abnormally Pressured Gas Reservoirs, Paper SPE 10125 presented at the AFTCE, San Antonio, TX, October 5-7, 1981.
    • (1981) AFTCE
    • Ramagost, B.P.1    Farshad, F.F.2
  • 10
    • 0006132587 scopus 로고
    • Decline Curve Analysis for Variable Pressure Drop/Variable Flowrate Systems
    • Paper SPE 21513 Houston, TX, January 23-24
    • BLASINGAME, T.A., McCray, T.L. and LEE, W.J., Decline Curve Analysis for Variable Pressure Drop/Variable Flowrate Systems, Paper SPE 21513 presented at the SPE Gas Technology Symposium, Houston, TX, January 23-24, 1991.
    • (1991) SPE Gas Technology Symposium
    • Blasingame, T.A.1    McCray, T.L.2    Lee, W.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.