메뉴 건너뛰기




Volumn 12, Issue 2, 2015, Pages 628-641

A Dynamic Algorithm for Distributed Feedback Control for Manufacturing Production, Capacity, and Maintenance

Author keywords

Distributed feedback control; just in time production and machine maintenance; machinery capacity control; maintenance scheduling; nonlinear and discontinuous differential equation; production scheduling

Indexed keywords

ALGORITHMS; CONTINUOUS TIME SYSTEMS; DIFFERENTIAL EQUATIONS; FEEDBACK CONTROL; MACHINERY; MAINTENANCE; NONLINEAR EQUATIONS; NONLINEAR FEEDBACK; PRODUCTION CONTROL; SCHEDULING; STOCHASTIC MODELS; STOCHASTIC SYSTEMS;

EID: 85027958250     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2014.2339281     Document Type: Article
Times cited : (17)

References (29)
  • 1
    • 84865760519 scopus 로고    scopus 로고
    • Steel plant production line automation strategy using advanced distributed control and convergent technology
    • R. K. Panigrahy, N. P. Mahalik, R. K. Mishra, and S. Patnaik, "Steel plant production line automation strategy using advanced distributed control and convergent technology," Int. J. Autom. Control, vol. 6, no. 2, pp. 157-173, 2012.
    • (2012) Int. J. Autom. Control , vol.6 , Issue.2 , pp. 157-173
    • Panigrahy, R.K.1    Mahalik, N.P.2    Mishra, R.K.3    Patnaik, S.4
  • 2
    • 0038292114 scopus 로고    scopus 로고
    • Flexible distributed control of production line with the LON fieldbus technology: A laboratory study
    • N. P. Mahalik and S. K. Lee, "Flexible distributed control of production line with the LON fieldbus technology: A laboratory study," Integr. Manuf. Syst., vol. 14, no. 3, pp. 268-277, 2003.
    • (2003) Integr. Manuf. Syst. , vol.14 , Issue.3 , pp. 268-277
    • Mahalik, N.P.1    Lee, S.K.2
  • 4
    • 27744578861 scopus 로고    scopus 로고
    • Integrated process control and condition-based maintenance scheduler for distributed manufacturing control systems
    • P. Koomsap, N. I. Shaikh, and V. V. Prabhu, "Integrated process control and condition-based maintenance scheduler for distributed manufacturing control systems," Int. J. Prod. Res., vol. 43, no. 8, pp. 1625-1641, 2005.
    • (2005) Int. J. Prod. Res. , vol.43 , Issue.8 , pp. 1625-1641
    • Koomsap, P.1    Shaikh, N.I.2    Prabhu, V.V.3
  • 5
    • 0033221232 scopus 로고    scopus 로고
    • Nonlinear dynamics in distributed arrival time control of heterarchical manufacturing systems
    • Nov.
    • V. V. Prabhu and N. A. Duffie, "Nonlinear dynamics in distributed arrival time control of heterarchical manufacturing systems," IEEE Trans. Control Syste. Technol., vol. 17, no. 6, pp. 724-730, Nov. 1999.
    • (1999) IEEE Trans. Control Syste. Technol. , vol.17 , Issue.6 , pp. 724-730
    • Prabhu, V.V.1    Duffie, N.A.2
  • 6
    • 0345015427 scopus 로고    scopus 로고
    • Modeling and performance of distributed algorithm for scheduling dissimilar machines with setup
    • J. Hong and V. V. Prabhu, "Modeling and performance of distributed algorithm for scheduling dissimilar machines with setup," Int. J. Prod. Res., vol. 41, pp. 4357-4382, 2003.
    • (2003) Int. J. Prod. Res. , vol.41 , pp. 4357-4382
    • Hong, J.1    Prabhu, V.V.2
  • 7
    • 48049102820 scopus 로고    scopus 로고
    • Distributed adaptive control of production scheduling and machine capacity
    • S. Cho and V. V. Prabhu, "Distributed adaptive control of production scheduling and machine capacity," J. Manuf. Syst., vol. 26, pp. 65-74, 2007.
    • (2007) J. Manuf. Syst. , vol.26 , pp. 65-74
    • Cho, S.1    Prabhu, V.V.2
  • 9
    • 0000245614 scopus 로고
    • The single machine early-tardy problem
    • P. Ow and T. Morton, "The single machine early-tardy problem," Manage. Sci., vol. 35, pp. 177-191, 1989.
    • (1989) Manage. Sci. , vol.35 , pp. 177-191
    • Ow, P.1    Morton, T.2
  • 10
    • 22444439337 scopus 로고    scopus 로고
    • Integrated preventive maintenance planning and production scheduling for a single machine
    • Jun.
    • C. R. Cassady and E. Kutanoglu, "Integrated preventive maintenance planning and production scheduling for a single machine," IEEE Trans. Reliability, vol. 54, no. 2, pp. 304-309, Jun. 2005.
    • (2005) IEEE Trans. Reliability , vol.54 , Issue.2 , pp. 304-309
    • Cassady, C.R.1    Kutanoglu, E.2
  • 11
    • 0026222734 scopus 로고
    • Controlled wear process: Modeling optimal control
    • Sep.
    • R. Rishel, "Controlled wear process: Modeling optimal control," IEEE Trans. Autom. Control, vol. 36, no. 9, pp. 1100-1102, Sep. 1991.
    • (1991) IEEE Trans. Autom. Control , vol.36 , Issue.9 , pp. 1100-1102
    • Rishel, R.1
  • 12
    • 0023451630 scopus 로고
    • The drilling problem: A stochastic modeling and control example in manufacturing
    • Nov.
    • C. J. Conrad and N. H. McClamroch, "The drilling problem: A stochastic modeling and control example in manufacturing," IEEE Trans. Autom. Control, vol. 32, no. 11, pp. 947-958, Nov. 1987.
    • (1987) IEEE Trans. Autom. Control , vol.32 , Issue.11 , pp. 947-958
    • Conrad, C.J.1    McClamroch, N.H.2
  • 13
    • 0002299782 scopus 로고
    • Differential equations with discontinuous right-hand sides
    • A. F. Filippov, "Differential equations with discontinuous right-hand sides," Amer. Math. Soc. Transl., vol. 42, pp. 199-231, 1960.
    • (1960) Amer. Math. Soc. Transl. , vol.42 , pp. 199-231
    • Filippov, A.F.1
  • 14
    • 34249830539 scopus 로고
    • A time-indexed formulation of non-preemptive single-machine scheduling problems
    • J. P. Sousa and L. A. Wolsey, "A time-indexed formulation of non-preemptive single-machine scheduling problems," Math. Program., vol. 54, pp. 353-367, 1992.
    • (1992) Math. Program. , vol.54 , pp. 353-367
    • Sousa, J.P.1    Wolsey, L.A.2
  • 15
    • 0024010206 scopus 로고
    • One processor scheduling with symmetric earliness and tardiness penalties
    • M. R. Garey, R. E. Tarjan, and G. T. Wilfong, "One processor scheduling with symmetric earliness and tardiness penalties," Math. Oper. Res., vol. 13, no. 2, pp. 330-348, 1988.
    • (1988) Math. Oper. Res. , vol.13 , Issue.2 , pp. 330-348
    • Garey, M.R.1    Tarjan, R.E.2    Wilfong, G.T.3
  • 16
    • 0026158109 scopus 로고
    • Algorithms for a class of single machine weighted tardiness and earliness problems
    • C. A. Yano and Y. Kim, "Algorithms for a class of single machine weighted tardiness and earliness problems," Europ. J. of Operational Research, vol. 52, pp. 161-178, 1991.
    • (1991) Europ. J. of Operational Research , vol.52 , pp. 161-178
    • Yano, C.A.1    Kim, Y.2
  • 17
    • 85028229854 scopus 로고    scopus 로고
    • Norwell, MA, USA: Kluwer
    • Scalable Enterprise Systems. Norwell, MA, USA: Kluwer, 2003, pp. 101-160.
    • (2003) Scalable Enterprise Systems , pp. 101-160
  • 18
    • 0000295157 scopus 로고
    • Near optimal manufacturing flow controller design
    • M. Caramanis and A. Sharifnia, "Near optimal manufacturing flow controller design," Int. J. Flexible Manuf. Syst., vol. 3, pp. 321-336, 1991.
    • (1991) Int. J. Flexible Manuf. Syst. , vol.3 , pp. 321-336
    • Caramanis, M.1    Sharifnia, A.2
  • 19
    • 0033640850 scopus 로고    scopus 로고
    • Automatic production control applying control theory
    • H. P. Wiendahl and J. W. Breithaupt, "Automatic production control applying control theory," Int. J. Prod. Econ., vol. 63, no. 1, pp. 33-46, 2000.
    • (2000) Int. J. Prod. Econ. , vol.63 , Issue.1 , pp. 33-46
    • Wiendahl, H.P.1    Breithaupt, J.W.2
  • 20
    • 21944434047 scopus 로고    scopus 로고
    • Modeling dynamics of autonomous logistic processes: Discrete-event versus continuous approaches
    • B. Scholz-Reiter, M. Freitag, C. de Beer, and T. Jagalski, "Modeling dynamics of autonomous logistic processes: Discrete-event versus continuous approaches," Ann. CIRP, vol. 55, pp. 413-416, 2005.
    • (2005) Ann. CIRP , vol.55 , pp. 413-416
    • Scholz-Reiter, B.1    Freitag, M.2    De Beer, C.3    Jagalski, T.4
  • 21
    • 80052273991 scopus 로고    scopus 로고
    • Application of a continuous supervisory fuzzy control on a discrete scheduling of manufacturing systems
    • K. Tamani, R. Boukezzoula, and G. Habchi, "Application of a continuous supervisory fuzzy control on a discrete scheduling of manufacturing systems," Eng. Appl. Artif. Intell., vol. 24, pp. 1162-1173, 2011.
    • (2011) Eng. Appl. Artif. Intell. , vol.24 , pp. 1162-1173
    • Tamani, K.1    Boukezzoula, R.2    Habchi, G.3
  • 22
    • 0025481509 scopus 로고
    • Manufacturing flow control and preventive maintenance: A stochastic control approach
    • Sep.
    • E. K. Boukas and A. Haurie, "Manufacturing flow control and preventive maintenance: A stochastic control approach," IEEE Trans. Autom. Control, vol. 35, no. 7, pp. 1024-1031, Sep. 1990.
    • (1990) IEEE Trans. Autom. Control , vol.35 , Issue.7 , pp. 1024-1031
    • Boukas, E.K.1    Haurie, A.2
  • 23
    • 9544250389 scopus 로고    scopus 로고
    • Eliminating drift in inventory and order based production control systems
    • S. M. Disney and D. R. Towill, "Eliminating drift in inventory and order based production control systems," Int. J. Prod. Econ., vol. 93, pp. 331-344, 2005.
    • (2005) Int. J. Prod. Econ. , vol.93 , pp. 331-344
    • Disney, S.M.1    Towill, D.R.2
  • 24
    • 3142687580 scopus 로고    scopus 로고
    • Operation of manufacturing systems with work in process inventory and production control
    • M. Y. Ma and Y. Koren, "Operation of manufacturing systems with work in process inventory and production control," CIRP Ann.-Manuf. Technol., vol. 53, no. 1, pp. 361-365, 2004.
    • (2004) CIRP Ann.-Manuf. Technol. , vol.53 , Issue.1 , pp. 361-365
    • Ma, M.Y.1    Koren, Y.2
  • 25
    • 33745635402 scopus 로고    scopus 로고
    • Piecewise-linear H∞ controller synthesis with applications to inventory control of switched production systems
    • L. Rodrigues and E. K. Boukas, "Piecewise-linear H∞ controller synthesis with applications to inventory control of switched production systems," Automatica, vol. 42, no. 8, pp. 1245-1254, 2006.
    • (2006) Automatica , vol.42 , Issue.8 , pp. 1245-1254
    • Rodrigues, L.1    Boukas, E.K.2
  • 26
    • 84871741531 scopus 로고    scopus 로고
    • An improved formulation of hybrid model predictive control with application to production-inventory systems
    • Jan.
    • N. N. Nandola and E. R. Daniel, "An improved formulation of hybrid model predictive control with application to production-inventory systems," IEEE Trans. Control Syst. Technol., vol. 1, pp. 121-135, Jan. 2013.
    • (2013) IEEE Trans. Control Syst. Technol. , vol.1 , pp. 121-135
    • Nandola, N.N.1    Daniel, E.R.2
  • 27
    • 84872717171 scopus 로고    scopus 로고
    • Coordination of capacity adjustment modes in work systems with autonomous WIP regulation
    • N. A. Duffie, J. Fenske, and M. Vadali, "Coordination of capacity adjustment modes in work systems with autonomous WIP regulation," Logistics Res., vol. 5, no. 3, pp. 99-104, 2012.
    • (2012) Logistics Res. , vol.5 , Issue.3 , pp. 99-104
    • Duffie, N.A.1    Fenske, J.2    Vadali, M.3
  • 29
    • 85028206393 scopus 로고    scopus 로고
    • Ph.D. dissertation, Dept. Ind. Manuf. Eng., The Pennsylvania State Univ., University Park, PA, USA
    • S. G. Lee, "Supply Chain Servo Control: Models and Algorithms," Ph.D. dissertation, Dept. Ind. Manuf. Eng., The Pennsylvania State Univ., University Park, PA, USA, 2013.
    • (2013) Supply Chain Servo Control: Models and Algorithms
    • Lee, S.G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.