메뉴 건너뛰기




Volumn 6, Issue 2, 2015, Pages 1046-1054

Stochastic pre-hurricane restoration planning for electric power systems infrastructure

Author keywords

Hurricane planning; power system resiliency; resource allocation; stochastic program with recourse

Indexed keywords

COST EFFECTIVENESS; ELECTRIC POWER SYSTEMS; HURRICANES; INTEGER PROGRAMMING; REPAIR; RESOURCE ALLOCATION; RESTORATION; STOCHASTIC SYSTEMS;

EID: 85027925915     PISSN: 19493053     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSG.2015.2388736     Document Type: Article
Times cited : (173)

References (30)
  • 1
    • 75949084718 scopus 로고    scopus 로고
    • Performance assessment of topologically diverse power systems subjected to hurricane events
    • Apr
    • J. Winkler, L. Duenas-Osorio, R. Stein, and D. Subramanian, "Performance assessment of topologically diverse power systems subjected to hurricane events," Rel. Eng. Syst. Safety, vol. 95, no. 4, pp. 323-336, Apr. 2010.
    • (2010) Rel. Eng. Syst. Safety , vol.95 , Issue.4 , pp. 323-336
    • Winkler, J.1    Duenas-Osorio, L.2    Stein, R.3    Subramanian, D.4
  • 2
    • 0031198932 scopus 로고    scopus 로고
    • Power distribution planning: A review of models and issues
    • Aug
    • S. K. Khator and L. C. Leung, "Power distribution planning: A review of models and issues," IEEE Trans. Power Syst., vol. 12, no. 3, pp. 1151-1159, Aug. 1997.
    • (1997) IEEE Trans. Power Syst. , vol.12 , Issue.3 , pp. 1151-1159
    • Khator, S.K.1    Leung, L.C.2
  • 3
    • 85006728185 scopus 로고    scopus 로고
    • Rebuilding electrical infrastructure along the Gulf Coast: A case study
    • B. Ball, "Rebuilding electrical infrastructure along the Gulf Coast: A case study," Bridge-Washington-Nat. Acad. Eng., vol. 36, no. 1, p. 21, 2006.
    • (2006) Bridge-Washington-Nat.Acad. Eng. , vol.36 , Issue.1 , pp. 21
    • Ball, B.1
  • 4
    • 77953231741 scopus 로고    scopus 로고
    • Technology planning for electric power supply in critical events considering a bulk grid, backup power plants, and micro-grids
    • Jun
    • A. Kwasinski, "Technology planning for electric power supply in critical events considering a bulk grid, backup power plants, and micro-grids," IEEE Syst. J., vol. 4, no. 2, pp. 167-178, Jun. 2010.
    • (2010) IEEE Syst. J , vol.4 , Issue.2 , pp. 167-178
    • Kwasinski, A.1
  • 5
    • 33846408652 scopus 로고    scopus 로고
    • Optimizing scheduling of post-earthquake electric power restoration tasks
    • Feb
    • N. Xu et al., "Optimizing scheduling of post-earthquake electric power restoration tasks," Earthq. Eng. Struct. Dyn., vol. 36, no. 2, pp. 265-284, Feb. 2007.
    • (2007) Earthq. Eng. Struct. Dyn. , vol.36 , Issue.2 , pp. 265-284
    • Xu, N.1
  • 6
    • 84875949416 scopus 로고    scopus 로고
    • A survey of models and algorithms for emergency response logistics in electric distribution systems. Part I: Reliability planning with fault considerations
    • Jul
    • N. Perrier et al., "A survey of models and algorithms for emergency response logistics in electric distribution systems. Part I: Reliability planning with fault considerations," Comput. Oper. Res., vol. 40, no. 7, pp. 1895-1906, Jul. 2013.
    • (2013) Comput. Oper. Res. , vol.40 , Issue.7 , pp. 1895-1906
    • Perrier, N.1
  • 7
    • 84875965727 scopus 로고    scopus 로고
    • A survey of models and algorithms for emergency response logistics in electric distribution systems. Part II: Contingency planning level
    • Jul
    • N. Perrier et al., "A survey of models and algorithms for emergency response logistics in electric distribution systems. Part II: Contingency planning level," Comput. Oper. Res., vol. 40, no. 7, pp. 1907-1922, Jul. 2013.
    • (2013) Comput. Oper. Res. , vol.40 , Issue.7 , pp. 1907-1922
    • Perrier, N.1
  • 8
    • 80052029374 scopus 로고    scopus 로고
    • Factors in the resilience of electrical power distribution infrastructures
    • Mar
    • P. J. Maliszewski and C. Perrings, "Factors in the resilience of electrical power distribution infrastructures," Appl. Geogr., vol. 32, no. 2, pp. 668-679, Mar. 2012.
    • (2012) Appl. Geogr. , vol.32 , Issue.2 , pp. 668-679
    • Maliszewski, P.J.1    Perrings, C.2
  • 9
    • 79958785587 scopus 로고    scopus 로고
    • Importance of soil and elevation characteristics for modeling hurricane-induced power outages
    • Jul
    • S. M. Quiring, L. Zhu, and S. D. Guikema, "Importance of soil and elevation characteristics for modeling hurricane-induced power outages," Nat. Hazards, vol. 58, no. 1, pp. 365-390, Jul. 2011.
    • (2011) Nat. Hazards , vol.58 , Issue.1 , pp. 365-390
    • Quiring, S.M.1    Zhu, L.2    Guikema, S.D.3
  • 10
    • 67649307051 scopus 로고    scopus 로고
    • Methodology for assessing the resilience of networked infrastructure
    • Jun
    • A. R. Dorothy, K. C. Kapur, and R. D. Christie, "Methodology for assessing the resilience of networked infrastructure," IEEE Syst. J., vol. 3, no. 2, pp. 174-180, Jun. 2009.
    • (2009) IEEE Syst. J , vol.3 , Issue.2 , pp. 174-180
    • Dorothy, A.R.1    Kapur, K.C.2    Christie, R.D.3
  • 11
    • 36348978159 scopus 로고    scopus 로고
    • Statistical forecasting of electric power restoration times in hurricanes and ice storms
    • Nov
    • H. Liu, R. A. Davidson, and T. Apanasovich, "Statistical forecasting of electric power restoration times in hurricanes and ice storms," IEEE Trans. Power Syst., vol. 22, no. 4, pp. 2270-2279, Nov. 2007.
    • (2007) IEEE Trans. Power Syst. , vol.22 , Issue.4 , pp. 2270-2279
    • Liu, H.1    Davidson, R.A.2    Apanasovich, T.3
  • 12
    • 28844491825 scopus 로고    scopus 로고
    • Negative binomial regression of electric power outages in hurricanes
    • Dec
    • H. Liu, R. Davidson, D. Rosowsky, and J. Stedinger, "Negative binomial regression of electric power outages in hurricanes," J. Infrastruct. Syst., vol. 11, no. 4, pp. 258-267, Dec. 2005.
    • (2005) J. Infrastruct. Syst. , vol.11 , Issue.4 , pp. 258-267
    • Liu, H.1    Davidson, R.2    Rosowsky, D.3    Stedinger, J.4
  • 13
    • 78649769396 scopus 로고    scopus 로고
    • Prestorm estimation of hurricane damage to electric power distribution systems
    • Oct
    • S. D. Guikema, S. M. Quiring, and S. R. Han, "Prestorm estimation of hurricane damage to electric power distribution systems," Risk Anal., vol. 30, no. 12, pp. 1744-1752, Oct. 2010.
    • (2010) Risk Anal , vol.30 , Issue.12 , pp. 1744-1752
    • Guikema, S.D.1    Quiring, S.M.2    Han, S.R.3
  • 14
    • 0032000286 scopus 로고    scopus 로고
    • Repair-unit location models for power failures
    • Feb
    • M. J. Yao and K. J. Min, "Repair-unit location models for power failures," IEEE Trans. Eng. Manage., vol. 45, no. 1, pp. 57-65, Feb. 1998.
    • (1998) IEEE Trans. Eng. Manage , vol.45 , Issue.1 , pp. 57-65
    • Yao, M.J.1    Min, K.J.2
  • 15
    • 82855181002 scopus 로고    scopus 로고
    • Strategic stockpiling of power system supplies for disaster recovery
    • San Diego, CA, USA
    • C. Coffrin, P. V. Hentenryck, and R. Bent, "Strategic stockpiling of power system supplies for disaster recovery," in Proc. IEEE Power Eng. Soc. Gen. Meeting, San Diego, CA, USA, 2011, pp. 1-8.
    • (2011) Proc. IEEE Power Eng. Soc. Gen. Meeting , pp. 1-8
    • Coffrin, C.1    Hentenryck, P.V.2    Bent, R.3
  • 16
    • 84863124130 scopus 로고    scopus 로고
    • Service restoration with consideration of rush repair
    • Wuhan, China
    • Y. Yongbo et al., "Service restoration with consideration of rush repair," in Proc. Power Eng. Auto. Conf. (PEAM), Wuhan, China, 2011, pp. 308-312.
    • (2011) Proc. Power Eng. Auto. Conf. (PEAM) , pp. 308-312
    • Yongbo, Y.1
  • 17
    • 0348170695 scopus 로고    scopus 로고
    • Resource planning and a depot location model for electric power restoration
    • May
    • S. Wang, B. R. Sarker, L. Mann, Jr., and E. Triantaphyllou, "Resource planning and a depot location model for electric power restoration," Eur. J. Oper. Res., vol. 155, no. 1, pp. 22-43, May 2004.
    • (2004) Eur. J. Oper. Res. , vol.155 , Issue.1 , pp. 22-43
    • Wang, S.1    Sarker, B.R.2    Mann, L.3    Triantaphyllou, E.4
  • 20
    • 85083941933 scopus 로고    scopus 로고
    • Dynamic maintenance scheduling for power systems incorporating hurricane effects
    • Venice, Italy
    • A. Arab, E. Tekin, A. Khodaei, S. K. Khator, and Z. Han, "Dynamic maintenance scheduling for power systems incorporating hurricane effects," in Proc. IEEE Smart Grid Commun. Conf., Venice, Italy, 2014, pp. 1-6.
    • (2014) Proc. IEEE Smart Grid Commun. Conf. , pp. 1-6
    • Arab, A.1    Tekin, E.2    Khodaei, A.3    Khator, S.K.4    Han, Z.5
  • 22
    • 0000415520 scopus 로고
    • The integer L-shaped method for stochastic integer programs with complete recourse
    • Apr
    • G. Laporte and F. V. Louveaux, "The integer L-shaped method for stochastic integer programs with complete recourse," Oper. Res. Lett., vol. 13, no. 3, pp. 133-142, Apr. 1993.
    • (1993) Oper. Res. Lett. , vol.13 , Issue.3 , pp. 133-142
    • Laporte, G.1    Louveaux, F.V.2
  • 23
    • 33747623533 scopus 로고    scopus 로고
    • A computationally efficient mixed integer linear formulation for the thermal unit commitment problem
    • Aug
    • M. Carrion and J. M. Arroyo, "A computationally efficient mixed integer linear formulation for the thermal unit commitment problem," IEEE Trans. Power Syst., vol. 21, no. 3, pp. 1371-1378, Aug. 2006.
    • (2006) IEEE Trans. Power Syst. , vol.21 , Issue.3 , pp. 1371-1378
    • Carrion, M.1    Arroyo, J.M.2
  • 25
    • 0018468345 scopus 로고
    • Comparison of three methods for selecting values of input variables in the analysis of output from a computer code
    • M. D. McKay, R. J. Beckman, and W. J. Conover, "Comparison of three methods for selecting values of input variables in the analysis of output from a computer code," Technometrics, vol. 21, no. 2, pp. 239-245, 1979.
    • (1979) Technometrics , vol.21 , Issue.2 , pp. 239-245
    • McKay, M.D.1    Beckman, R.J.2    Conover, W.J.3
  • 26
    • 0003540525 scopus 로고    scopus 로고
    • A users guide to LHS: Sandias latin hypercube sampling software
    • Sandia Nat. Lab., Albuquerque, NM, USA , Tech. Rep. SAND98-0210
    • G. D. Wyss and K. H. Jorgensen, "A users guide to LHS: Sandias Latin hypercube sampling software," Dept. Risk Assess. Syst. Model., Sandia Nat. Lab., Albuquerque, NM, USA, 1998, Tech. Rep. SAND98-0210.
    • (1998) Dept. Risk Assess. Syst. Model
    • Wyss, G.D.1    Jorgensen, K.H.2
  • 27
    • 0037321577 scopus 로고    scopus 로고
    • Scenario reduction algorithms in stochastic programming
    • H. Heitsch and W. Rmisch, "Scenario reduction algorithms in stochastic programming," Computat. Optim. Appl., vol. 24, nos. 2-3, pp. 187-206, 2003.
    • (2003) Computat. Optim. Appl. , vol.24 , Issue.2-3 , pp. 187-206
    • Heitsch, H.1    Rmisch, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.