-
1
-
-
85018828809
-
Developing a framework of metrics to assess collaboration in integrated project delivery
-
Virginia Polytechnic Institution and State Univ. VA
-
Abdirad, H., and, Pishdad-Bozorgi, P. (2014). " Developing a framework of metrics to assess collaboration in integrated project delivery." Proc., 50th Annual Int. Conf. of the Associated Schools of Construction, Virginia Polytechnic Institution and State Univ., VA.
-
(2014)
Proc. 50th Annual Int. Conf. of the Associated Schools of Construction
-
-
Abdirad, H.1
Pishdad-Bozorgi, P.2
-
2
-
-
56749092458
-
-
AIA National and AIA California Council (Feb. 24, 2015)
-
AIA National and AIA California Council. (2007). " Integrated project delivery: A guide." http://info.aia.org/siteobjects/files/ipd-guide-2007.pdf (Feb. 24, 2015).
-
(2007)
Integrated Project Delivery: A Guide
-
-
-
3
-
-
41649112685
-
Structural equation modeling in practice: A review and recommended two-step approach
-
Anderson, J. C., and, Gerbing, D. W. (1988). " Structural equation modeling in practice: A review and recommended two-step approach." Psychol. Bull., 103 (3), 411-423. PSBUAI 0033-2909 10.1037/0033-2909.103.3.411.
-
(1988)
Psychol. Bull.
, vol.103
, Issue.3
, pp. 411-423
-
-
Anderson, J.C.1
Gerbing, D.W.2
-
7
-
-
0023020183
-
The moderator-mediator variable distinction in social psychological research: Conceptual, strategic, and statistical considerations
-
Baron, R. M., and, Kenny, D. A. (1986). " The moderator-mediator variable distinction in social psychological research: Conceptual, strategic, and statistical considerations." J. Personality Soc. Psychol., 51 (6), 1173-1182. 10.1037/0022-3514.51.6.1173.
-
(1986)
J. Personality Soc. Psychol.
, vol.51
, Issue.6
, pp. 1173-1182
-
-
Baron, R.M.1
Kenny, D.A.2
-
11
-
-
0348195636
-
Methodology and metrics for assessing team effectiveness
-
Brewer, W., and, Mendelson, M. I. (2003). " Methodology and metrics for assessing team effectiveness." Int. J. Eng. Educ., 19, 777-787. IEEDEF 0742-0269
-
(2003)
Int. J. Eng. Educ.
, vol.19
, pp. 777-787
-
-
Brewer, W.1
Mendelson, M.I.2
-
14
-
-
84922503107
-
Practices and effectiveness of building information modeling in construction projects in China
-
Cao, D., Wang, G., Li, H., Skitmore, M., Huang, T., and, Zhang, W. (2015). " Practices and effectiveness of building information modeling in construction projects in China." Autom. Constr., 49 (1), 113-122. AUCOES 0926-5805 10.1016/j.autcon.2014.10.014.
-
(2015)
Autom. Constr.
, vol.49
, Issue.1
, pp. 113-122
-
-
Cao, D.1
Wang, G.2
Li, H.3
Skitmore, M.4
Huang, T.5
Zhang, W.6
-
16
-
-
85018995802
-
-
Bartlett School of Construction and Project Management, Univ. College London, London
-
Chang, C. Y., and, Howard, R. (2016). " How to incentivize BIM participation? Conceptual framework and empirical evidence." Bartlett School of Construction and Project Management, Univ. College London, London.
-
(2016)
How to Incentivize BIM Participation? Conceptual Framework and Empirical Evidence
-
-
Chang, C.Y.1
Howard, R.2
-
17
-
-
85018969641
-
Influence of project delivery system and payment methods on project cost performance
-
Chen, Y. Q., and, Jiao, J. S. (2011). " Influence of project delivery system and payment methods on project cost performance." J. Tongji Univ. (Natural Science), 2011 (09), c1407-1412.
-
(2011)
J. Tongji Univ. (Natural Science)
, vol.2011
, Issue.9
, pp. c1407-1412
-
-
Chen, Y.Q.1
Jiao, J.S.2
-
19
-
-
84885086703
-
BIM implementation throughout the U.K. Construction project lifecycle: An analysis
-
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., and, McNiff, S. (2013). " BIM implementation throughout the U.K. construction project lifecycle: An analysis." Autom. Constr., 36, 145-151. AUCOES 0926-5805 10.1016/j.autcon.2013.09.001.
-
(2013)
Autom. Constr.
, vol.36
, pp. 145-151
-
-
Eadie, R.1
Browne, M.2
Odeyinka, H.3
McKeown, C.4
McNiff, S.5
-
20
-
-
38649094993
-
-
Wiley, Hoboken, NJ
-
Eastman, C., Eastman, C. M., Teicholz, P., and, Sacks, R. (2011). BIM Handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors, Wiley, Hoboken, NJ.
-
(2011)
BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors
-
-
Eastman, C.1
Eastman, C.M.2
Teicholz, P.3
Sacks, R.4
-
22
-
-
3242727943
-
-
Vantage Partners, Brighton, MA
-
Ertel, D., Jeff, W., and, Laura, V. (2001). " Managing strategic alliances: A cross-industry study of how to build and manage successful alliances." Vantage Partners, Brighton, MA.
-
(2001)
Managing Strategic Alliances: A Cross-industry Study of How to Build and Manage Successful Alliances
-
-
Ertel, D.1
Jeff, W.2
Laura, V.3
-
23
-
-
85018996160
-
-
Measuring, monitoring and managing knowledge in command and control organizations." RTO, Neuilly-sur-Seine, France
-
Freeman, J., Weil, S. A., and, Hess, K. P. (2006). " Measuring, monitoring and managing knowledge in command and control organizations." Virtual media for military applications, RTO, Neuilly-sur-Seine, France.
-
(2006)
Virtual Media for Military Applications
-
-
Freeman, J.1
Weil, S.A.2
Hess, K.P.3
-
25
-
-
84857357646
-
Aligning building information model tools and construction management methods
-
Hartmann, T., Van Meerveld, H., Vossebeld, N., and, Adriaanse, A. (2012). " Aligning building information model tools and construction management methods." Autom. Constr., 22, 605-613. AUCOES 0926-5805 10.1016/j.autcon.2011.12.011
-
(2012)
Autom. Constr.
, vol.22
, pp. 605-613
-
-
Hartmann, T.1
Van Meerveld, H.2
Vossebeld, N.3
Adriaanse, A.4
-
28
-
-
0000139690
-
Moral hazard in teams
-
Holmstrom, B. (1982). " Moral hazard in teams." Bell J. Econ., 13 (2), 324-340. BJECD3 10.2307/3003457.
-
(1982)
Bell J. Econ.
, vol.13
, Issue.2
, pp. 324-340
-
-
Holmstrom, B.1
-
29
-
-
67650706330
-
Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives
-
Hu, L. T., and, Bentler, P. M. (1999). " Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives." Struct. Equation Model. A Multidiscip. J., 6 (1), 1-55. 10.1080/10705519909540118.
-
(1999)
Struct. Equation Model. A Multidiscip. J.
, vol.6
, Issue.1
, pp. 1-55
-
-
Hu, L.T.1
Bentler, P.M.2
-
31
-
-
1342309164
-
Trust in project relationships - Inside the black box
-
Kadefors, A. (2004). " Trust in project relationships-Inside the black box." Int. J. Project Manage., 22 (3), 175-182. IPMAEL 10.1016/S0263-7863(03)00031-0.
-
(2004)
Int. J. Project Manage.
, vol.22
, Issue.3
, pp. 175-182
-
-
Kadefors, A.1
-
32
-
-
77955332881
-
Understanding construction industry experience and attitudes toward integrated project delivery
-
Kent, D. C., and, Becerik-Gerber, B. (2010). " Understanding construction industry experience and attitudes toward integrated project delivery." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000188, 815-825. JCEMD4 0733-9364
-
(2010)
J. Constr. Eng. Manage.
, pp. 815-825
-
-
Kent, D.C.1
Becerik-Gerber, B.2
-
34
-
-
84855924520
-
Influence of project delivery methods on achieving sustainable high performance buildings report on case studies
-
Vancouver, Canada
-
Korkmaz, S., et al. (2010). " Influence of project delivery methods on achieving sustainable high performance buildings report on case studies." Charles Pankow Foundation, Vancouver, Canada.
-
(2010)
Charles Pankow Foundation
-
-
Korkmaz, S.1
-
35
-
-
3543000558
-
The swing of the regulatory pendulum in Europe: From precautionary principle to (regulatory) impact analysis
-
Löfstedt, R. E. (2004). " The swing of the regulatory pendulum in Europe: From precautionary principle to (regulatory) impact analysis." J. Risk Uncertainty, 28 (3), 237-260. 10.1023/B:RISK.0000026097.72268.8d.
-
(2004)
J. Risk Uncertainty
, vol.28
, Issue.3
, pp. 237-260
-
-
Löfstedt, R.E.1
-
36
-
-
0013118140
-
Power analysis and determination of sample size for covariance structure modeling
-
MacCallum, R. C., Browne, M. W., and, Sugawara, H. M. (1996). " Power analysis and determination of sample size for covariance structure modeling." Psychol. Methods, 1 (2), 130-149. 10.1037/1082-989X.1.2.130.
-
(1996)
Psychol. Methods
, vol.1
, Issue.2
, pp. 130-149
-
-
MacCallum, R.C.1
Browne, M.W.2
Sugawara, H.M.3
-
38
-
-
33846820562
-
Rethinking fit assessment in structural equation modelling: A commentary and elaboration on Barrett
-
McIntosh, C. N. (2007). " Rethinking fit assessment in structural equation modelling: A commentary and elaboration on Barrett." Personality Individual Differences, 42 (5), 859-867. 10.1016/j.paid.2006.09.020.
-
(2007)
Personality Individual Differences
, vol.42
, Issue.5
, pp. 859-867
-
-
McIntosh, C.N.1
-
39
-
-
84989085629
-
Characteristics of partnership success: Partnership attributes, communication behavior, and conflict resolution techniques
-
Mohr, J., and, Spekman, R. (1994). " Characteristics of partnership success: partnership attributes, communication behavior, and conflict resolution techniques." Strategic Manage. J., 15 (2), 135-152. SMAJD8 0143-2095 10.1002/smj.4250150205.
-
(1994)
Strategic Manage. J.
, vol.15
, Issue.2
, pp. 135-152
-
-
Mohr, J.1
Spekman, R.2
-
40
-
-
84890513766
-
Framework for the coordinated application of two different integrated project delivery platforms
-
Monteiro, A., Mêda, P., and, Martins, J. P. (2014). " Framework for the coordinated application of two different integrated project delivery platforms." Autom. Constr., 38, 87-99. AUCOES 0926-5805 10.1016/j.autcon.2013.11.003
-
(2014)
Autom. Constr.
, vol.38
, pp. 87-99
-
-
Monteiro, A.1
Mêda, P.2
Martins, J.P.3
-
41
-
-
85018999696
-
Collaboration: Enabling synchronized supply chains
-
Atlanta
-
Moore, P., Manrodt, K., and, Holcomb, M. (2005). " Collaboration: Enabling synchronized supply chains." Capgemini, Georgia Southern Univ., Univ. of Tennessee, and Intel Corporation, Atlanta.
-
(2005)
Capgemini, Georgia Southern Univ. Univ. of Tennessee, and Intel Corporation
-
-
Moore, P.1
Manrodt, K.2
Holcomb, M.3
-
42
-
-
84864048085
-
-
Ph.D. thesis, Dept. of Civil and Environmental Engineering, National Univ. of Ireland, Cork, Ireland
-
Mourshed, M. (2006). " Interoperability-based optimisation of architectural design." Ph.D. thesis, Dept. of Civil and Environmental Engineering, National Univ. of Ireland, Cork, Ireland.
-
(2006)
Interoperability-based Optimisation of Architectural Design
-
-
Mourshed, M.1
-
43
-
-
38349115167
-
Evaluation of goodness-of-fit indices for structural equation models
-
Mulaik, S. A., James, L. R., Van Alstine, J., Bennett, N., Lind, S., and, Stilwell, C. D. (1989). " Evaluation of goodness-of-fit indices for structural equation models." Psychol. Bull., 105 (3), 430-445. PSBUAI 0033-2909 10.1037/0033-2909.105.3.430
-
(1989)
Psychol. Bull.
, vol.105
, Issue.3
, pp. 430-445
-
-
Mulaik, S.A.1
James, L.R.2
Van Alstine, J.3
Bennett, N.4
Lind, S.5
Stilwell, C.D.6
-
45
-
-
0003407597
-
Regulatory Impact Analysis: Best Practices in OECD Countries
-
Best Practices in OECD Countries, OECD, Paris
-
Organisation For Economic Cooperation and Development. (1997). Regulatory impact analysis: Best practices in OECD countries, Best Practices in OECD Countries, OECD, Paris.
-
(1997)
Organisation for Economic Cooperation and Development
-
-
-
46
-
-
0000995248
-
Relationship between project interaction and performance indicators
-
Pocock, J. B., Hyun, C. T., Liu, L. Y., and, Kim, M. K. (1996). " Relationship between project interaction and performance indicators." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1996)122:2(165), 165-176. JCEMD4 0733-9364
-
(1996)
J. Constr. Eng. Manage.
, pp. 165-176
-
-
Pocock, J.B.1
Hyun, C.T.2
Liu, L.Y.3
Kim, M.K.4
-
47
-
-
84890740939
-
-
Construction Industry Council, London
-
Saxon, R. G. (2013). Growth through BIM, Construction Industry Council, London.
-
(2013)
Growth Through BIM
-
-
Saxon, R.G.1
-
48
-
-
79952411009
-
Changing roles of the clients, architects, and contractors through BIM
-
Sebastian, R. (2011). " Changing roles of the clients, architects, and contractors through BIM." Eng. Constr. Archit. Manage., 18 (2), 176-187. 10.1108/09699981111111148.
-
(2011)
Eng. Constr. Archit. Manage.
, vol.18
, Issue.2
, pp. 176-187
-
-
Sebastian, R.1
-
49
-
-
84994315144
-
BIM application for integrated design and engineering in small-scale housing development: A pilot project in the Netherlands
-
Future Trends in Architectural Management," CIB Publication, Tainan, Taiwan
-
Sebastian, R., Haak, W., and, Vos, E. (2009). " BIM application for integrated design and engineering in small-scale housing development: A pilot project in The Netherlands." Int. Symp. CIB-W096, "Future Trends in Architectural Management," CIB Publication, Tainan, Taiwan, 2-3.
-
(2009)
Int. Symp. CIB-W096
, pp. 2-3
-
-
Sebastian, R.1
Haak, W.2
Vos, E.3
-
50
-
-
0032116582
-
Effects of sample size, model specification and factor loadings on the GFI in confirmatory factor analysis
-
Shevlin, M., and, Miles, J. N. (1998). " Effects of sample size, model specification and factor loadings on the GFI in confirmatory factor analysis." Personality Individual Differences, 25 (1), 85-90. 10.1016/S0191-8869(98)00055-5.
-
(1998)
Personality Individual Differences
, vol.25
, Issue.1
, pp. 85-90
-
-
Shevlin, M.1
Miles, J.N.2
-
51
-
-
59049095324
-
Building information modelling framework: A research and delivery foundation for industry stakeholders
-
Succar, B. (2009). " Building information modelling framework: A research and delivery foundation for industry stakeholders." Autom. Constr., 18 (3), 357-375. AUCOES 0926-5805 10.1016/j.autcon.2008.10.003.
-
(2009)
Autom. Constr.
, vol.18
, Issue.3
, pp. 357-375
-
-
Succar, B.1
-
52
-
-
84929353774
-
Macro-BIM adoption: Conceptual structures
-
Succar, B., and, Kassem, M. (2015). " Macro-BIM adoption: Conceptual structures." Autom. Constr., 57, 64-79. AUCOES 0926-5805 10.1016/j.autcon.2015.04.018
-
(2015)
Autom. Constr.
, vol.57
, pp. 64-79
-
-
Succar, B.1
Kassem, M.2
-
53
-
-
85019003568
-
Structuring the adoption and implementation of BIM and integrated approaches to project delivery across the Canadian AECO industry: Key drivers from abroad
-
Vancouver, Canada
-
Tahrani, S., Poirier, E. A., Aksenova, G., and, Forgues, D., (2015). " Structuring the adoption and implementation of BIM and integrated approaches to project delivery across the Canadian AECO industry: Key drivers from abroad." Proc., Int. Construction Specialty Conf. of the Canadian Society for Civil Engineering, Vancouver, Canada.
-
(2015)
Proc. Int. Construction Specialty Conf. of the Canadian Society for Civil Engineering
-
-
Tahrani, S.1
Poirier, E.A.2
Aksenova, G.3
Forgues, D.4
-
54
-
-
85018949232
-
Utilization of a co-location office in conjunction with integrated project delivery
-
Birmingham, U.K
-
Thompson, R. D., and, Ozbek, M. E. (2012). " Utilization of a co-location office in conjunction with integrated project delivery." Paper Presented at the 48th ASC Annual Int. Conf., Birmingham, U.K.
-
(2012)
48th ASC Annual Int. Conf.
-
-
Thompson, R.D.1
Ozbek, M.E.2
-
55
-
-
0000467414
-
Economic institutions: Spontaneous and intentional governance
-
Williamson, O. E. (1991). " Economic institutions: Spontaneous and intentional governance." J. Law Econ. Organ., 7, 159-187. 10.1093/jleo/7.special-issue.159.
-
(1991)
J. Law Econ. Organ.
, vol.7
, pp. 159-187
-
-
Williamson, O.E.1
-
57
-
-
0001445915
-
The method of path coefficients
-
Wright, S. (1934). " The method of path coefficients." The Annals of Mathematical Statistics, 5 (3), 161-215. 10.1214/aoms/1177732676.
-
(1934)
The Annals of Mathematical Statistics
, vol.5
, Issue.3
, pp. 161-215
-
-
Wright, S.1
-
59
-
-
0032391619
-
Does trust matter? Exploring the effects of interorganizational and interpersonal trust on performance
-
Zaheer, A., McEvily, B., and, Perrone, V. (1998). " Does trust matter? Exploring the effects of interorganizational and interpersonal trust on performance." Organ. Sci., 9 (2), 141-159. ORSCEZ 1047-7039 10.1287/orsc.9.2.141.
-
(1998)
Organ. Sci.
, vol.9
, Issue.2
, pp. 141-159
-
-
Zaheer, A.1
McEvily, B.2
Perrone, V.3
|