메뉴 건너뛰기




Volumn 143, Issue 8, 2017, Pages

Impact of Building Information Modeling Implementation on the Acceptance of Integrated Delivery Systems: Structural Equation Modeling Analysis

Author keywords

Building information modeling; Collaboration; Incentivization; Information technologies; Integrated project delivery; Structural equation modeling

Indexed keywords

CONSTRUCTION INDUSTRY; INFORMATION TECHNOLOGY; INFORMATION THEORY; PROJECT MANAGEMENT; QUALITY CONTROL; SUPPLY CHAINS;

EID: 85019006850     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0001335     Document Type: Article
Times cited : (64)

References (59)
  • 1
    • 85018828809 scopus 로고    scopus 로고
    • Developing a framework of metrics to assess collaboration in integrated project delivery
    • Virginia Polytechnic Institution and State Univ. VA
    • Abdirad, H., and, Pishdad-Bozorgi, P. (2014). " Developing a framework of metrics to assess collaboration in integrated project delivery." Proc., 50th Annual Int. Conf. of the Associated Schools of Construction, Virginia Polytechnic Institution and State Univ., VA.
    • (2014) Proc. 50th Annual Int. Conf. of the Associated Schools of Construction
    • Abdirad, H.1    Pishdad-Bozorgi, P.2
  • 2
    • 56749092458 scopus 로고    scopus 로고
    • AIA National and AIA California Council (Feb. 24, 2015)
    • AIA National and AIA California Council. (2007). " Integrated project delivery: A guide." http://info.aia.org/siteobjects/files/ipd-guide-2007.pdf (Feb. 24, 2015).
    • (2007) Integrated Project Delivery: A Guide
  • 3
    • 41649112685 scopus 로고
    • Structural equation modeling in practice: A review and recommended two-step approach
    • Anderson, J. C., and, Gerbing, D. W. (1988). " Structural equation modeling in practice: A review and recommended two-step approach." Psychol. Bull., 103 (3), 411-423. PSBUAI 0033-2909 10.1037/0033-2909.103.3.411.
    • (1988) Psychol. Bull. , vol.103 , Issue.3 , pp. 411-423
    • Anderson, J.C.1    Gerbing, D.W.2
  • 7
    • 0023020183 scopus 로고
    • The moderator-mediator variable distinction in social psychological research: Conceptual, strategic, and statistical considerations
    • Baron, R. M., and, Kenny, D. A. (1986). " The moderator-mediator variable distinction in social psychological research: Conceptual, strategic, and statistical considerations." J. Personality Soc. Psychol., 51 (6), 1173-1182. 10.1037/0022-3514.51.6.1173.
    • (1986) J. Personality Soc. Psychol. , vol.51 , Issue.6 , pp. 1173-1182
    • Baron, R.M.1    Kenny, D.A.2
  • 11
    • 0348195636 scopus 로고    scopus 로고
    • Methodology and metrics for assessing team effectiveness
    • Brewer, W., and, Mendelson, M. I. (2003). " Methodology and metrics for assessing team effectiveness." Int. J. Eng. Educ., 19, 777-787. IEEDEF 0742-0269
    • (2003) Int. J. Eng. Educ. , vol.19 , pp. 777-787
    • Brewer, W.1    Mendelson, M.I.2
  • 14
    • 84922503107 scopus 로고    scopus 로고
    • Practices and effectiveness of building information modeling in construction projects in China
    • Cao, D., Wang, G., Li, H., Skitmore, M., Huang, T., and, Zhang, W. (2015). " Practices and effectiveness of building information modeling in construction projects in China." Autom. Constr., 49 (1), 113-122. AUCOES 0926-5805 10.1016/j.autcon.2014.10.014.
    • (2015) Autom. Constr. , vol.49 , Issue.1 , pp. 113-122
    • Cao, D.1    Wang, G.2    Li, H.3    Skitmore, M.4    Huang, T.5    Zhang, W.6
  • 17
    • 85018969641 scopus 로고    scopus 로고
    • Influence of project delivery system and payment methods on project cost performance
    • Chen, Y. Q., and, Jiao, J. S. (2011). " Influence of project delivery system and payment methods on project cost performance." J. Tongji Univ. (Natural Science), 2011 (09), c1407-1412.
    • (2011) J. Tongji Univ. (Natural Science) , vol.2011 , Issue.9 , pp. c1407-1412
    • Chen, Y.Q.1    Jiao, J.S.2
  • 19
    • 84885086703 scopus 로고    scopus 로고
    • BIM implementation throughout the U.K. Construction project lifecycle: An analysis
    • Eadie, R., Browne, M., Odeyinka, H., McKeown, C., and, McNiff, S. (2013). " BIM implementation throughout the U.K. construction project lifecycle: An analysis." Autom. Constr., 36, 145-151. AUCOES 0926-5805 10.1016/j.autcon.2013.09.001.
    • (2013) Autom. Constr. , vol.36 , pp. 145-151
    • Eadie, R.1    Browne, M.2    Odeyinka, H.3    McKeown, C.4    McNiff, S.5
  • 23
    • 85018996160 scopus 로고    scopus 로고
    • Measuring, monitoring and managing knowledge in command and control organizations." RTO, Neuilly-sur-Seine, France
    • Freeman, J., Weil, S. A., and, Hess, K. P. (2006). " Measuring, monitoring and managing knowledge in command and control organizations." Virtual media for military applications, RTO, Neuilly-sur-Seine, France.
    • (2006) Virtual Media for Military Applications
    • Freeman, J.1    Weil, S.A.2    Hess, K.P.3
  • 25
    • 84857357646 scopus 로고    scopus 로고
    • Aligning building information model tools and construction management methods
    • Hartmann, T., Van Meerveld, H., Vossebeld, N., and, Adriaanse, A. (2012). " Aligning building information model tools and construction management methods." Autom. Constr., 22, 605-613. AUCOES 0926-5805 10.1016/j.autcon.2011.12.011
    • (2012) Autom. Constr. , vol.22 , pp. 605-613
    • Hartmann, T.1    Van Meerveld, H.2    Vossebeld, N.3    Adriaanse, A.4
  • 28
    • 0000139690 scopus 로고
    • Moral hazard in teams
    • Holmstrom, B. (1982). " Moral hazard in teams." Bell J. Econ., 13 (2), 324-340. BJECD3 10.2307/3003457.
    • (1982) Bell J. Econ. , vol.13 , Issue.2 , pp. 324-340
    • Holmstrom, B.1
  • 29
    • 67650706330 scopus 로고    scopus 로고
    • Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives
    • Hu, L. T., and, Bentler, P. M. (1999). " Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives." Struct. Equation Model. A Multidiscip. J., 6 (1), 1-55. 10.1080/10705519909540118.
    • (1999) Struct. Equation Model. A Multidiscip. J. , vol.6 , Issue.1 , pp. 1-55
    • Hu, L.T.1    Bentler, P.M.2
  • 31
    • 1342309164 scopus 로고    scopus 로고
    • Trust in project relationships - Inside the black box
    • Kadefors, A. (2004). " Trust in project relationships-Inside the black box." Int. J. Project Manage., 22 (3), 175-182. IPMAEL 10.1016/S0263-7863(03)00031-0.
    • (2004) Int. J. Project Manage. , vol.22 , Issue.3 , pp. 175-182
    • Kadefors, A.1
  • 32
    • 77955332881 scopus 로고    scopus 로고
    • Understanding construction industry experience and attitudes toward integrated project delivery
    • Kent, D. C., and, Becerik-Gerber, B. (2010). " Understanding construction industry experience and attitudes toward integrated project delivery." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000188, 815-825. JCEMD4 0733-9364
    • (2010) J. Constr. Eng. Manage. , pp. 815-825
    • Kent, D.C.1    Becerik-Gerber, B.2
  • 34
    • 84855924520 scopus 로고    scopus 로고
    • Influence of project delivery methods on achieving sustainable high performance buildings report on case studies
    • Vancouver, Canada
    • Korkmaz, S., et al. (2010). " Influence of project delivery methods on achieving sustainable high performance buildings report on case studies." Charles Pankow Foundation, Vancouver, Canada.
    • (2010) Charles Pankow Foundation
    • Korkmaz, S.1
  • 35
    • 3543000558 scopus 로고    scopus 로고
    • The swing of the regulatory pendulum in Europe: From precautionary principle to (regulatory) impact analysis
    • Löfstedt, R. E. (2004). " The swing of the regulatory pendulum in Europe: From precautionary principle to (regulatory) impact analysis." J. Risk Uncertainty, 28 (3), 237-260. 10.1023/B:RISK.0000026097.72268.8d.
    • (2004) J. Risk Uncertainty , vol.28 , Issue.3 , pp. 237-260
    • Löfstedt, R.E.1
  • 36
    • 0013118140 scopus 로고    scopus 로고
    • Power analysis and determination of sample size for covariance structure modeling
    • MacCallum, R. C., Browne, M. W., and, Sugawara, H. M. (1996). " Power analysis and determination of sample size for covariance structure modeling." Psychol. Methods, 1 (2), 130-149. 10.1037/1082-989X.1.2.130.
    • (1996) Psychol. Methods , vol.1 , Issue.2 , pp. 130-149
    • MacCallum, R.C.1    Browne, M.W.2    Sugawara, H.M.3
  • 38
    • 33846820562 scopus 로고    scopus 로고
    • Rethinking fit assessment in structural equation modelling: A commentary and elaboration on Barrett
    • McIntosh, C. N. (2007). " Rethinking fit assessment in structural equation modelling: A commentary and elaboration on Barrett." Personality Individual Differences, 42 (5), 859-867. 10.1016/j.paid.2006.09.020.
    • (2007) Personality Individual Differences , vol.42 , Issue.5 , pp. 859-867
    • McIntosh, C.N.1
  • 39
    • 84989085629 scopus 로고
    • Characteristics of partnership success: Partnership attributes, communication behavior, and conflict resolution techniques
    • Mohr, J., and, Spekman, R. (1994). " Characteristics of partnership success: partnership attributes, communication behavior, and conflict resolution techniques." Strategic Manage. J., 15 (2), 135-152. SMAJD8 0143-2095 10.1002/smj.4250150205.
    • (1994) Strategic Manage. J. , vol.15 , Issue.2 , pp. 135-152
    • Mohr, J.1    Spekman, R.2
  • 40
    • 84890513766 scopus 로고    scopus 로고
    • Framework for the coordinated application of two different integrated project delivery platforms
    • Monteiro, A., Mêda, P., and, Martins, J. P. (2014). " Framework for the coordinated application of two different integrated project delivery platforms." Autom. Constr., 38, 87-99. AUCOES 0926-5805 10.1016/j.autcon.2013.11.003
    • (2014) Autom. Constr. , vol.38 , pp. 87-99
    • Monteiro, A.1    Mêda, P.2    Martins, J.P.3
  • 42
    • 84864048085 scopus 로고    scopus 로고
    • Ph.D. thesis, Dept. of Civil and Environmental Engineering, National Univ. of Ireland, Cork, Ireland
    • Mourshed, M. (2006). " Interoperability-based optimisation of architectural design." Ph.D. thesis, Dept. of Civil and Environmental Engineering, National Univ. of Ireland, Cork, Ireland.
    • (2006) Interoperability-based Optimisation of Architectural Design
    • Mourshed, M.1
  • 43
    • 38349115167 scopus 로고
    • Evaluation of goodness-of-fit indices for structural equation models
    • Mulaik, S. A., James, L. R., Van Alstine, J., Bennett, N., Lind, S., and, Stilwell, C. D. (1989). " Evaluation of goodness-of-fit indices for structural equation models." Psychol. Bull., 105 (3), 430-445. PSBUAI 0033-2909 10.1037/0033-2909.105.3.430
    • (1989) Psychol. Bull. , vol.105 , Issue.3 , pp. 430-445
    • Mulaik, S.A.1    James, L.R.2    Van Alstine, J.3    Bennett, N.4    Lind, S.5    Stilwell, C.D.6
  • 45
    • 0003407597 scopus 로고    scopus 로고
    • Regulatory Impact Analysis: Best Practices in OECD Countries
    • Best Practices in OECD Countries, OECD, Paris
    • Organisation For Economic Cooperation and Development. (1997). Regulatory impact analysis: Best practices in OECD countries, Best Practices in OECD Countries, OECD, Paris.
    • (1997) Organisation for Economic Cooperation and Development
  • 46
    • 0000995248 scopus 로고    scopus 로고
    • Relationship between project interaction and performance indicators
    • Pocock, J. B., Hyun, C. T., Liu, L. Y., and, Kim, M. K. (1996). " Relationship between project interaction and performance indicators." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1996)122:2(165), 165-176. JCEMD4 0733-9364
    • (1996) J. Constr. Eng. Manage. , pp. 165-176
    • Pocock, J.B.1    Hyun, C.T.2    Liu, L.Y.3    Kim, M.K.4
  • 47
    • 84890740939 scopus 로고    scopus 로고
    • Construction Industry Council, London
    • Saxon, R. G. (2013). Growth through BIM, Construction Industry Council, London.
    • (2013) Growth Through BIM
    • Saxon, R.G.1
  • 48
    • 79952411009 scopus 로고    scopus 로고
    • Changing roles of the clients, architects, and contractors through BIM
    • Sebastian, R. (2011). " Changing roles of the clients, architects, and contractors through BIM." Eng. Constr. Archit. Manage., 18 (2), 176-187. 10.1108/09699981111111148.
    • (2011) Eng. Constr. Archit. Manage. , vol.18 , Issue.2 , pp. 176-187
    • Sebastian, R.1
  • 49
    • 84994315144 scopus 로고    scopus 로고
    • BIM application for integrated design and engineering in small-scale housing development: A pilot project in the Netherlands
    • Future Trends in Architectural Management," CIB Publication, Tainan, Taiwan
    • Sebastian, R., Haak, W., and, Vos, E. (2009). " BIM application for integrated design and engineering in small-scale housing development: A pilot project in The Netherlands." Int. Symp. CIB-W096, "Future Trends in Architectural Management," CIB Publication, Tainan, Taiwan, 2-3.
    • (2009) Int. Symp. CIB-W096 , pp. 2-3
    • Sebastian, R.1    Haak, W.2    Vos, E.3
  • 50
    • 0032116582 scopus 로고    scopus 로고
    • Effects of sample size, model specification and factor loadings on the GFI in confirmatory factor analysis
    • Shevlin, M., and, Miles, J. N. (1998). " Effects of sample size, model specification and factor loadings on the GFI in confirmatory factor analysis." Personality Individual Differences, 25 (1), 85-90. 10.1016/S0191-8869(98)00055-5.
    • (1998) Personality Individual Differences , vol.25 , Issue.1 , pp. 85-90
    • Shevlin, M.1    Miles, J.N.2
  • 51
    • 59049095324 scopus 로고    scopus 로고
    • Building information modelling framework: A research and delivery foundation for industry stakeholders
    • Succar, B. (2009). " Building information modelling framework: A research and delivery foundation for industry stakeholders." Autom. Constr., 18 (3), 357-375. AUCOES 0926-5805 10.1016/j.autcon.2008.10.003.
    • (2009) Autom. Constr. , vol.18 , Issue.3 , pp. 357-375
    • Succar, B.1
  • 52
    • 84929353774 scopus 로고    scopus 로고
    • Macro-BIM adoption: Conceptual structures
    • Succar, B., and, Kassem, M. (2015). " Macro-BIM adoption: Conceptual structures." Autom. Constr., 57, 64-79. AUCOES 0926-5805 10.1016/j.autcon.2015.04.018
    • (2015) Autom. Constr. , vol.57 , pp. 64-79
    • Succar, B.1    Kassem, M.2
  • 53
    • 85019003568 scopus 로고    scopus 로고
    • Structuring the adoption and implementation of BIM and integrated approaches to project delivery across the Canadian AECO industry: Key drivers from abroad
    • Vancouver, Canada
    • Tahrani, S., Poirier, E. A., Aksenova, G., and, Forgues, D., (2015). " Structuring the adoption and implementation of BIM and integrated approaches to project delivery across the Canadian AECO industry: Key drivers from abroad." Proc., Int. Construction Specialty Conf. of the Canadian Society for Civil Engineering, Vancouver, Canada.
    • (2015) Proc. Int. Construction Specialty Conf. of the Canadian Society for Civil Engineering
    • Tahrani, S.1    Poirier, E.A.2    Aksenova, G.3    Forgues, D.4
  • 54
    • 85018949232 scopus 로고    scopus 로고
    • Utilization of a co-location office in conjunction with integrated project delivery
    • Birmingham, U.K
    • Thompson, R. D., and, Ozbek, M. E. (2012). " Utilization of a co-location office in conjunction with integrated project delivery." Paper Presented at the 48th ASC Annual Int. Conf., Birmingham, U.K.
    • (2012) 48th ASC Annual Int. Conf.
    • Thompson, R.D.1    Ozbek, M.E.2
  • 55
    • 0000467414 scopus 로고
    • Economic institutions: Spontaneous and intentional governance
    • Williamson, O. E. (1991). " Economic institutions: Spontaneous and intentional governance." J. Law Econ. Organ., 7, 159-187. 10.1093/jleo/7.special-issue.159.
    • (1991) J. Law Econ. Organ. , vol.7 , pp. 159-187
    • Williamson, O.E.1
  • 57
    • 0001445915 scopus 로고
    • The method of path coefficients
    • Wright, S. (1934). " The method of path coefficients." The Annals of Mathematical Statistics, 5 (3), 161-215. 10.1214/aoms/1177732676.
    • (1934) The Annals of Mathematical Statistics , vol.5 , Issue.3 , pp. 161-215
    • Wright, S.1
  • 59
    • 0032391619 scopus 로고    scopus 로고
    • Does trust matter? Exploring the effects of interorganizational and interpersonal trust on performance
    • Zaheer, A., McEvily, B., and, Perrone, V. (1998). " Does trust matter? Exploring the effects of interorganizational and interpersonal trust on performance." Organ. Sci., 9 (2), 141-159. ORSCEZ 1047-7039 10.1287/orsc.9.2.141.
    • (1998) Organ. Sci. , vol.9 , Issue.2 , pp. 141-159
    • Zaheer, A.1    McEvily, B.2    Perrone, V.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.