Volumn 44, Issue 12, 2006, Pages 2337-2360

Effective hybrid genetic algorithm for minimizing makespan on a single-batch-processing machine with non-identical job sizes

Author keywords

Batch processing machine; Genetic algorithm; Makespan; Scheduling; Simulated annealing

Indexed keywords


EID: 85016094525     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540500525254     Document Type: Article
Times cited : (94)

References (30)
  • 1
    • 0001507294 scopus 로고
    • Batching and scheduling jobs on batch and discrete processors
    • Ahmadi, J.H., Ahmadi, R.H., Dasu, S. and Tang, C.S., Batching and scheduling jobs on batch and discrete processors. Oper. Res., 1992, 40, 750-763.
    • (1992) Oper. Res. , vol.40 , pp. 750-763
    • Ahmadi, J.H.1    Ahmadi, R.H.2    Dasu, S.3    Tang, C.S.4
  • 2
    • 1542685255 scopus 로고    scopus 로고
    • Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness
    • Balasubramanian, H., Monch, L., Fowler, J. and Pfund, M., Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness. Int. J. Prod. Res., 2004, 42, 1621-1638.
    • (2004) Int. J. Prod. Res. , vol.42 , pp. 1621-1638
    • Balasubramanian, H.1    Monch, L.2    Fowler, J.3    Pfund, M.4
  • 3
    • 0001096735 scopus 로고
    • Genetic algorithms and random keys for sequencing and optimization
    • Bean, J.C., Genetic algorithms and random keys for sequencing and optimization. ORSA J. Comput., 1994, 6, 154-160.
    • (1994) ORSA J. Comput. , vol.6 , pp. 154-160
    • Bean, J.C.1
  • 5
    • 0027656856 scopus 로고
    • Minimizing total completion time on batch-processing machines
    • Chandru, V., Lee, C.Y. and Uzsoy, R., Minimizing total completion time on batch-processing machines. Int. J. Prod. Res., 1993a, 31, 2097-2121.
    • (1993) Int. J. Prod. Res. , vol.31 , pp. 2097-2121
    • Chandru, V.1    Lee, C.Y.2    Uzsoy, R.3
  • 6
    • 0027560273 scopus 로고
    • Minimizing total completion time on a batchprocessing machine with job families
    • Chandru, V., Lee, C.Y. and Uzsoy, R., Minimizing total completion time on a batchprocessing machine with job families. Oper. Res. Lett., 1993b, 13, 61-65.
    • (1993) Oper. Res. Lett. , vol.13 , pp. 61-65
    • Chandru, V.1    Lee, C.Y.2    Uzsoy, R.3
  • 7
    • 0002528075 scopus 로고
    • Approximation algorithm for bin-packing problem an updated survey
    • edited by Y. Ausiello, M. Licertini, and P. Serafini, Springer: New York, NY)
    • Coffman, E.G., Garey, M. and Johnson, D.S., Approximation algorithm for bin-packing problem an updated survey. In Algorithm Design for Computer System Design, edited by Y. Ausiello, M. Licertini, and P. Serafini, pp. 49-106, 1984 (Springer: New York, NY).
    • (1984) In Algorithm Design for Computer System Design , pp. 49-106
    • Coffman, E.G.1    Garey, M.2    Johnson, D.S.3
  • 8
    • 0004015664 scopus 로고
    • Research Report, Simon School of Business Administration, University of Rochester, Rochester, NY)
    • Dobson, G. and Nambimadom, R.S., The Batch Loading and Scheduling Problem. Research Report, 1992 (Simon School of Business Administration, University of Rochester, Rochester, NY).
    • (1992) The Batch Loading and Scheduling Problem
    • Dobson, G.1    Nambimadom, R.S.2
  • 9
    • 0036604740 scopus 로고    scopus 로고
    • Minimizing the makespan on a batch machine with non-identical job sizes: An exact procedure
    • Dupont, L. and Dhaenens-Flipo, C., Minimizing the makespan on a batch machine with non-identical job sizes: an exact procedure. Comput. Oper. Res., 2002, 29, 807-819.
    • (2002) Comput. Oper. Res. , vol.29 , pp. 807-819
    • Dupont, L.1    Dhaenens-Flipo, C.2
  • 11
    • 0031236201 scopus 로고    scopus 로고
    • Branch-and-bound method for minimizing mean flow time on a single-batch-processing machine
    • Dupont, L. and Jolai Ghazvini, F., Branch-and-bound method for minimizing mean flow time on a single-batch-processing machine. Int. J. Ind. Eng., 1997b, 4, 197-203.
    • (1997) Int. J. Ind. Eng. , vol.4 , pp. 197-203
    • Dupont, L.1    Jolai Ghazvini, F.2
  • 12
    • 0008350147 scopus 로고    scopus 로고
    • Minimizing makespan on a single-batch-processing machine with non-identical job sizes
    • Dupont, L. and Jolai Ghazvini, F., Minimizing makespan on a single-batch-processing machine with non-identical job sizes. Eur. J. Automat. Sys., 1998, 32, 431-440.
    • (1998) Eur. J. Automat. Sys. , vol.32 , pp. 431-440
    • Dupont, L.1    Jolai Ghazvini, F.2
  • 14
    • 0031270468 scopus 로고    scopus 로고
    • Scheduling semiconductor burn-in operations to minimize total flow time
    • Hochbaum, D.S. and Landy, D., Scheduling semiconductor burn-in operations to minimize total flow time. Oper. Res., 1997, 45, 874-885.
    • (1997) Oper. Res. , vol.45 , pp. 874-885
    • Hochbaum, D.S.1    Landy, D.2
  • 15
    • 38149058172 scopus 로고
    • Efficient scheduling algorithms for a single-batch-processing machine
    • Ikura, Y. and Gimple, M., Efficient scheduling algorithms for a single-batch-processing machine. Oper. Res. Lett., 1986, 5, 61-65.
    • (1986) Oper. Res. Lett. , vol.5 , pp. 61-65
    • Ikura, Y.1    Gimple, M.2
  • 16
    • 8344253664 scopus 로고    scopus 로고
    • Minimizing number of tardy jobs on a batch-processing machine with incompatible job families
    • Jolai, F., Minimizing number of tardy jobs on a batch-processing machine with incompatible job families. Eur. J. Oper. Res., 2005, 162, 184-190.
    • (2005) Eur. J. Oper. Res. , vol.162 , pp. 184-190
    • Jolai, F.1
  • 17
    • 0032141320 scopus 로고    scopus 로고
    • Minimizing mean flow time on a single-batch-processing machine with non-identical job sizes
    • Jolai Ghazvini, F. and Dupont, L., Minimizing mean flow time on a single-batch-processing machine with non-identical job sizes. Int. J. Prod. Econ., 1998, 55, 273-280.
    • (1998) Int. J. Prod. Econ. , vol.55 , pp. 273-280
    • Jolai Ghazvini, F.1    Dupont, L.2
  • 18
    • 0031699840 scopus 로고    scopus 로고
    • Scheduling a single-batch-processing machine with secondary resource constraints
    • Kempf, K.G., Uzsoy, R. and Wang, C.S., Scheduling a single-batch-processing machine with secondary resource constraints. J. Manuf. Sys., 1998, 17, 37-51.
    • (1998) J. Manuf. Sys. , vol.17 , pp. 37-51
    • Kempf, K.G.1    Uzsoy, R.2    Wang, C.S.3
  • 19
    • 23144434510 scopus 로고    scopus 로고
    • Scheduling a single-batch-processing machine with arbitrary job sizes and incompatible job families
    • Koh, S.G., Koo, P.H., Kim, D.C. and Hur, W.S., Scheduling a single-batch-processing machine with arbitrary job sizes and incompatible job families. Int. J. Prod. Econ., 2005, 98, 81-96.
    • (2005) Int. J. Prod. Econ. , vol.98 , pp. 81-96
    • Koh, S.G.1    Koo, P.H.2    Kim, D.C.3    Hur, W.S.4
  • 20
    • 0032804081 scopus 로고    scopus 로고
    • Minimizing makespan on a single-batch-processing machine with dynamic job arrivals
    • Lee, C.Y. and Uzsoy, R., Minimizing makespan on a single-batch-processing machine with dynamic job arrivals. Int. J. Prod. Res., 1999, 37, 219-236.
    • (1999) Int. J. Prod. Res. , vol.37 , pp. 219-236
    • Lee, C.Y.1    Uzsoy, R.2
  • 21
    • 0026898494 scopus 로고
    • Efficient algorithms for scheduling semiconductor burn-in operations
    • Lee, C.Y., Uzsoy, R. and Martin-Vega, L.A., Efficient algorithms for scheduling semiconductor burn-in operations. Oper. Res., 1992, 40, 764-775.
    • (1992) Oper. Res. , vol.40 , pp. 764-775
    • Lee, C.Y.1    Uzsoy, R.2    Martin-Vega, L.A.3
  • 22
    • 0031077278 scopus 로고    scopus 로고
    • Scheduling with agreeable release times and due dates on a batch-processing machine
    • Li, C.L. and Lee, C.Y., Scheduling with agreeable release times and due dates on a batch-processing machine. Eur. J. Oper. Res., 1997, 96, 564-569.
    • (1997) Eur. J. Oper. Res. , vol.96 , pp. 564-569
    • Li, C.L.1    Lee, C.Y.2
  • 23
    • 0032003105 scopus 로고    scopus 로고
    • Minimizing total tardiness on a batch-processing machine with incompatible job families
    • Mehta, S.V. and Uzsoy, R., Minimizing total tardiness on a batch-processing machine with incompatible job families. IIE Trans. Schedul. Logist., 1998, 30, 165-178.
    • (1998) IIE Trans. Schedul. Logist. , vol.30 , pp. 165-178
    • Mehta, S.V.1    Uzsoy, R.2
  • 24
    • 0346148281 scopus 로고    scopus 로고
    • Minimizing makespan for single machine batch processing with non-identical job sizes using simulated annealing
    • Melouk, S., Damodaran, P. and Chang, P.Y., Minimizing makespan for single machine batch processing with non-identical job sizes using simulated annealing. Int. J. Prod. Econ., 2004, 87, 141-147.
    • (2004) Int. J. Prod. Econ. , vol.87 , pp. 141-147
    • Melouk, S.1    Damodaran, P.2    Chang, P.Y.3
  • 25
    • 13844256873 scopus 로고    scopus 로고
    • Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
    • Monch, L., Balasubramanian, H., Fowler, J. and Pfund, M., Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times. Comput. Oper. Res., 2005, 32, 2731-2750.
    • (2005) Comput. Oper. Res. , vol.32 , pp. 2731-2750
    • Monch, L.1    Balasubramanian, H.2    Fowler, J.3    Pfund, M.4
  • 26
    • 9644265591 scopus 로고    scopus 로고
    • Minimizing makespan on a single batching machine with release times and non-identical job sizes
    • Shuguang, L., Guojun, L., Xiaoli, W. and Qiming, L., Minimizing makespan on a single batching machine with release times and non-identical job sizes. Oper. Res. Lett., 2005, 33, 157-164.
    • (2005) Oper. Res. Lett. , vol.33 , pp. 157-164
    • Shuguang, L.1    Guojun, L.2    Xiaoli, W.3    Qiming, L.4
  • 27
    • 0028461472 scopus 로고
    • A single-batch-processing machine with non-identical job sizes
    • Uzsoy, R., A single-batch-processing machine with non-identical job sizes. Int. J. Prod. Res., 1994, 32, 1615-1635.
    • (1994) Int. J. Prod. Res. , vol.32 , pp. 1615-1635
    • Uzsoy, R.1
  • 28
    • 0029387205 scopus 로고
    • Scheduling batch-processing machines with incompatible job families
    • Uzsoy, R., Scheduling batch-processing machines with incompatible job families. Int. J. Prod. Res, 1995, 33, 2685-2708.
    • (1995) Int. J. Prod. Res , vol.33 , pp. 2685-2708
    • Uzsoy, R.1
  • 29
    • 0001961689 scopus 로고    scopus 로고
    • Minimizing total weighted completion time on a singlebatch-processing machine
    • Uzsoy, R. and Yang, Y., Minimizing total weighted completion time on a singlebatch-processing machine. Prod. Oper. Manag., 1997, 6, 57-73.
    • (1997) Prod. Oper. Manag. , vol.6 , pp. 57-73
    • Uzsoy, R.1    Yang, Y.2
  • 30
    • 0036778940 scopus 로고    scopus 로고
    • A genetic algorithm to minimize maximum lateness on a batch-processing machine
    • Wang, C. and Uzsoy, R., A genetic algorithm to minimize maximum lateness on a batch-processing machine. Comput. Oper. Res., 2002, 29, 1621-1640.
    • (2002) Comput. Oper. Res. , vol.29 , pp. 1621-1640
    • Wang, C.1    Uzsoy, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.