메뉴 건너뛰기




Volumn 42, Issue C, 1991, Pages 1-55

Concurrent Processing in Power System Analysis

Author keywords

[No Author keywords available]

Indexed keywords


EID: 85013540667     PISSN: 00905267     EISSN: None     Source Type: Book Series    
DOI: 10.1016/B978-0-12-012742-9.50006-9     Document Type: Chapter
Times cited : (3)

References (43)
  • 2
    • 0014995747 scopus 로고
    • Parallelism, pipelining, and computer efficiency
    • January
    • Chen, T.C., “Parallelism, pipelining, and computer efficiency,”. Computer Design, January 1971, 69–74.
    • (1971) Computer Design , pp. 69-74
    • Chen, T.C.1
  • 4
    • 85050492726 scopus 로고
    • Numerical algorithms for parallel computers
    • Proceedings of the National Computer Conference, AFIPS Press
    • D. K. Stevenson, “Numerical algorithms for parallel computers,” Proceedings of the National Computer Conference, AFIPS Press, vol. 49, 1980.
    • (1980) , vol.49
    • Stevenson, D.K.1
  • 5
    • 0022661204 scopus 로고
    • Parallel supercomputing today and the Cedar approach
    • February
    • Kuck, D.J., Davidson, E.S., Lawrie, D.H., Sameh, A.H., “Parallel supercomputing today and the Cedar approach,”. Science 231 (February 1986), 967–974.
    • (1986) Science , vol.231 , pp. 967-974
    • Kuck, D.J.1    Davidson, E.S.2    Lawrie, D.H.3    Sameh, A.H.4
  • 7
    • 84921179476 scopus 로고
    • Parallel Processing in Power Systems Computation
    • Co-Chairmen, IEEE Computer and Analytical Methods Subcommittee, submitted for publication in the IEEE Transactions on Power Systems
    • D. J. Tylavsky and A. Bose, Co-Chairmen, IEEE Computer and Analytical Methods Subcommittee, “Parallel Processing in Power Systems Computation,” submitted for publication in the IEEE Transactions on Power Systems, 1991.
    • (1991)
    • Tylavsky, D.J.1    Bose, A.2
  • 9
    • 0020915698 scopus 로고
    • Fast transient stability solution using an array processor
    • PICA 1983, Houston, Texas, May
    • H. Taoka, S. Abe, and S. Takeda, “Fast transient stability solution using an array processor,” PICA 1983, Houston, Texas, May 1983.
    • (1983)
    • Taoka, H.1    Abe, S.2    Takeda, S.3
  • 10
    • 0022099384 scopus 로고
    • Cluster analysis of power-system networks for array processing solutions
    • Pt. C July
    • Saleh, A.O.M., Laughton, M.A., “Cluster analysis of power-system networks for array processing solutions,”. IEE Proceedings 132:No. 4 (July 1985), 172–178 Pt. C.
    • (1985) IEE Proceedings , vol.132 , Issue.No. 4 , pp. 172-178
    • Saleh, A.O.M.1    Laughton, M.A.2
  • 11
    • 84944999348 scopus 로고
    • An environment for rule-based blackboards and distributed problem solving
    • Morgan Daufmann Publishers San Nateo, CA
    • Talukdar, S.N., Cardozo, E., “An environment for rule-based blackboards and distributed problem solving”. Readings in Distributed Artificial Intelligence, 1988, Morgan Daufmann Publishers, San Nateo, CA.
    • (1988) Readings in Distributed Artificial Intelligence
    • Talukdar, S.N.1    Cardozo, E.2
  • 12
    • 84882980232 scopus 로고    scopus 로고
    • Coarse grain scheduling in parallel triangular factorization and solution of power system matrices
    • IEEE Transactions on Power Systems paper #90 SM 485-3 PWRS, to appear
    • K. Lau, D. J. Tylavsky, and A. Bose “Coarse grain scheduling in parallel triangular factorization and solution of power system matrices,”, IEEE Transactions on Power Systems paper #90 SM 485-3 PWRS, to appear.
    • Lau, K.1    Tylavsky, D.J.2    Bose, A.3
  • 13
    • 0342386455 scopus 로고
    • A Technology Assessment Study of Near Term Computer Capabilities and Their Impact on Power Flow and Stability Simulation Program
    • EPRI-TPS-77–749 Final Report
    • D.E. Barry, C. Pottle and K. Wirgau, A Technology Assessment Study of Near Term Computer Capabilities and Their Impact on Power Flow and Stability Simulation Program, EPRI-TPS-77–749 Final Report (1978).
    • (1978)
    • Barry, D.E.1    Pottle, C.2    Wirgau, K.3
  • 15
    • 84910997787 scopus 로고
    • Design of Multiprocessor Structures for Simulation of Power System Dynamics
    • EPRI-EL-1756
    • F.M. Brasch, J.E. Van Ness and S.C. Kang, Design of Multiprocessor Structures for Simulation of Power System Dynamics, EPRI-EL-1756, (1981).
    • (1981)
    • Brasch, F.M.1    Van Ness, J.E.2    Kang, S.C.3
  • 16
    • 11644272956 scopus 로고
    • Decomposition and Sparsity with Application to Distribution Computing
    • Exploring Applications of Parallel Processing to Power System Analysis Problems, ed. P.M. Anderson, EPRI-EL-566-SR
    • A.M. Erisman, “Decomposition and Sparsity with Application to Distribution Computing,” Exploring Applications of Parallel Processing to Power System Analysis Problems, ed. P.M. Anderson, EPRI-EL-566-SR, pp. 183–208,(1977).
    • (1977) , pp. 183-208
    • Erisman, A.M.1
  • 18
    • 11644279527 scopus 로고
    • Parallel Processing of Power System Analysis Problems via Simple Parallel Microcomputer Structures
    • Electric Power Research Institute Palo Alto
    • Fong, J., Pottle, C., “Parallel Processing of Power System Analysis Problems via Simple Parallel Microcomputer Structures,”. Exploring Applications of Parallel Processing to Power System Analysis Problems, 1977, Electric Power Research Institute, Palo Alto, 265–286.
    • (1977) Exploring Applications of Parallel Processing to Power System Analysis Problems , pp. 265-286
    • Fong, J.1    Pottle, C.2
  • 19
    • 0022463920 scopus 로고
    • Quadrant Interlocking Factorization: A Form of Block L-U Factorization
    • Tylavsky, D.J., “Quadrant Interlocking Factorization: A Form of Block L-U Factorization,”. Proc. IEEE, 1986, 232–233.
    • (1986) Proc. IEEE , pp. 232-233
    • Tylavsky, D.J.1
  • 20
    • 0024104182 scopus 로고
    • A Parallel Scheme for the Forward/Backward Substitutions in Solving Sparse Linear Equations
    • Abur, A., “A Parallel Scheme for the Forward/Backward Substitutions in Solving Sparse Linear Equations,”. IEEE Trans. on PWRS-3, 1988, 1471–1478.
    • (1988) IEEE Trans. on PWRS-3 , pp. 1471-1478
    • Abur, A.1
  • 21
    • 85013519825 scopus 로고    scopus 로고
    • –1 Methods
    • IEEE PES 1989 Summer Meeting, Paper #89 SM 679–2 PWRS.
    • –1 Methods,” IEEE PES 1989 Summer Meeting, Paper #89 SM 679–2 PWRS.
    • Alvarado, F.L.1    Yu, D.C.2    Betancourt, R.3
  • 23
    • 0024862538 scopus 로고
    • Parallel Power System Transient Stability Analysis on Hypercube Multiprocessors
    • IEEE Power Industry Computer Applications Conference Seattle, WA, May
    • S.Y. Lee, H.D. Chiang, KG. Lee and B.Y. Ku, “Parallel Power System Transient Stability Analysis on Hypercube Multiprocessors,” IEEE Power Industry Computer Applications Conference, Seattle, WA, May 1989.
    • (1989)
    • Lee, S.Y.1    Chiang, H.D.2    Lee, K.G.3    Ku, B.Y.4
  • 24
    • 0020832105 scopus 로고
    • The Use of Multiple Factoring in the Parallel Solution of Algebraic Equations
    • Power Industry Computer Applications Conference
    • J.E. Van Ness and G. Molina, “The Use of Multiple Factoring in the Parallel Solution of Algebraic Equations,” Power Industry Computer Applications Conference, (1983).
    • (1983)
    • Van Ness, J.E.1    Molina, G.2
  • 25
    • 0022671483 scopus 로고
    • Parallel Inversion of Sparse Matrices
    • Feb.
    • Betancourt, R., Alvarado, F.L., “Parallel Inversion of Sparse Matrices,”. IEEE Trans. on Power Systems PWRS-1:No.1 (1986), 74–81 Feb.
    • (1986) IEEE Trans. on Power Systems , vol.PWRS-1 , Issue.No.1 , pp. 74-81
    • Betancourt, R.1    Alvarado, F.L.2
  • 26
    • 84939372468 scopus 로고    scopus 로고
    • Sparse Matrix Inverse Factors
    • IEEE PES 1988 Summer Meeting, Paper #88 SM 728–8.
    • M.K. Enns, W.F. Tinney, F.L. Alvarado, “Sparse Matrix Inverse Factors,” IEEE PES 1988 Summer Meeting, Paper #88 SM 728–8.
    • Enns, M.K.1    Tinney, W.F.2    Alvarado, F.L.3
  • 27
    • 0025468367 scopus 로고    scopus 로고
    • Implementation of the Fast Decoupled Load Flow on a Vector Computer
    • IEEE PES 1990 Winter Power Meeting.
    • A. Gomez, and R. Betancourt, “Implementation of the Fast Decoupled Load Flow on a Vector Computer,” IEEE PES 1990 Winter Power Meeting.
    • Gomez, A.1    Betancourt, R.2
  • 28
    • 85013514537 scopus 로고
    • Precedence Relationship Performance of an Indirect Matrix Solver
    • PES 89 Summer Meeting and IEEE Trans. on Power Systems (accepted)
    • D.J. Tylavsky and B. Gopalakrishnan, “Precedence Relationship Performance of an Indirect Matrix Solver,” PES 89 Summer Meeting and IEEE Trans. on Power Systems (accepted) (1989).
    • (1989)
    • Tylavsky, D.J.1    Gopalakrishnan, B.2
  • 29
    • 0024090907 scopus 로고
    • Supercomputers for the utility future
    • October/November
    • Douglas, J., “Supercomputers for the utility future,”. Electric Power Research Institute Journal, 1988, 6–15 October/November.
    • (1988) Electric Power Research Institute Journal , pp. 6-15
    • Douglas, J.1
  • 30
    • 0018544869 scopus 로고
    • Future computer technology for large power system simulation
    • November
    • Happ, H.H., Pottle, C., Wirgau, K.A., “Future computer technology for large power system simulation,”. Automatica 15:no. 6 (1979), 621–629 November.
    • (1979) Automatica , vol.15 , Issue.no. 6 , pp. 621-629
    • Happ, H.H.1    Pottle, C.2    Wirgau, K.A.3
  • 32
    • 0026260874 scopus 로고
    • Parallel Newton type methods for power system stability analysis using local and shared memory multiprocessors
    • accepted for publication in IEEE Transactions on Power Systems, IEEE Winter PES Meeting, New York, New York
    • N. Zhu, J. S. Chai, A Bose, and D. J. Tylavsky, “Parallel Newton type methods for power system stability analysis using local and shared memory multiprocessors,” accepted for publication in IEEE Transactions on Power Systems, IEEE Winter PES Meeting, New York, New York, 1991.
    • (1991)
    • Zhu, N.1    Chai, J.S.2    Bose, A.3    Tylavsky, D.J.4
  • 34
    • 85013534808 scopus 로고
    • A highly parallel method for transient stability analysis
    • IEEE Proceedings of the PICA Conference, Seattle, Washington, pp. 380–386, May
    • M. La Scala, A. Bose, D. J. Tylavsky, and J. S. Chai, “A highly parallel method for transient stability analysis,” IEEE Proceedings of the PICA Conference, Seattle, Washington, pp. 380–386, May 1989.
    • (1989)
    • La Scala, M.1    Bose, A.2    Tylavsky, D.J.3    Chai, J.S.4
  • 35
    • 85013531095 scopus 로고
    • Real-time digital simulator for power system analysis on a hypercube computer
    • accepted for publication in IEEE Transactions on Power Systems, IEEE Winter PES Meeting, New York, New York
    • H. Taoka, et al., “Real-time digital simulator for power system analysis on a hypercube computer,” accepted for publication in IEEE Transactions on Power Systems, IEEE Winter PES Meeting, New York, New York, 1991.
    • (1991)
    • Taoka, H.1
  • 36
    • 0023669840 scopus 로고
    • Transient stability simulation by waveform relaxation methods
    • November
    • Ilic-Spong, M., Crow, M.L., Pai, M.A., “Transient stability simulation by waveform relaxation methods,”. IEEE Transactions on Power Systems PSWR-2:no. 4 (1987), 943–953 November.
    • (1987) IEEE Transactions on Power Systems , vol.PSWR-2 , Issue.no. 4 , pp. 943-953
    • Ilic-Spong, M.1    Crow, M.L.2    Pai, M.A.3
  • 37
    • 0025468440 scopus 로고
    • The parallel implementation of the waveform relaxation method for transient stability simulation
    • accepted for publication in IEEE Transactions on Power Systems, IEEE Winter PES Meeting, paper #91 WM 158–6 PWRS
    • M. L. Crow and M. Ilic, “The parallel implementation of the waveform relaxation method for transient stability simulation,” accepted for publication in IEEE Transactions on Power Systems, IEEE Winter PES Meeting, paper #91 WM 158–6 PWRS, 1990.
    • (1990)
    • Crow, M.L.1    Ilic, M.2
  • 39
    • 85013517058 scopus 로고
    • A Pipelined-in-time parallel algorithm for transient stability analysis
    • accepted for publication in IEEE Transactions on Power Systems, IEEE Summer PES Meeting
    • M. La Scala, R. Sbrizzai, and F. Torelli, “A Pipelined-in-time parallel algorithm for transient stability analysis,” accepted for publication in IEEE Transactions on Power Systems, IEEE Summer PES Meeting, 1990.
    • (1990)
    • La Scala, M.1    Sbrizzai, R.2    Torelli, F.3
  • 40
    • 0018467156 scopus 로고
    • Parallel solution of transient problems by trapezoidal integration
    • May/June
    • Alvarado, F.L., “Parallel solution of transient problems by trapezoidal integration,”. IEEE Transactions on Power Apparatus and Systems PAS-98 (1979), 1080–1090 May/June.
    • (1979) IEEE Transactions on Power Apparatus and Systems , vol.PAS-98 , pp. 1080-1090
    • Alvarado, F.L.1
  • 41
    • 85013557006 scopus 로고
    • Bottlenecks in parallel algorithms for power system stability analysis
    • submitted to the IEEE Transactions on Power Systems, summer meeting, San Diego, CA
    • J. S. Chai and A. Bose, “Bottlenecks in parallel algorithms for power system stability analysis,” submitted to the IEEE Transactions on Power Systems, summer meeting, San Diego, CA, 1991.
    • (1991)
    • Chai, J.S.1    Bose, A.2
  • 42
    • 0004517673 scopus 로고
    • Extended Transient-Midterm Stability Package: Technical Guide for the Stability Program
    • EPRI EL-2000-CCM-Project 1208, Jan
    • Extended Transient-Midterm Stability Package: Technical Guide for the Stability Program, EPRI EL-2000-CCM-Project 1208, Jan. 1987.
    • (1987)
  • 43
    • 85013545199 scopus 로고
    • Short-term load forecasting using an artificial neural network
    • accepted for publication in the IEEE Transactions on Power Systems, IEEE PES Winter Meeting, paper #91 WM 199–0 PWRS, New York, New York
    • K. Y. Lee and J. H. Park, “Short-term load forecasting using an artificial neural network,” accepted for publication in the IEEE Transactions on Power Systems, IEEE PES Winter Meeting, paper #91 WM 199–0 PWRS, New York, New York, 1991.
    • (1991)
    • Lee, K.Y.1    Park, J.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.