메뉴 건너뛰기




Volumn 18, Issue 1, 2019, Pages 39-69

Supporting timing analysis of vehicular embedded systems through the refinement of timing constraints

Author keywords

Component model; Component based development; Distributed embedded systems; End to end timing analysis; Timing model

Indexed keywords

ABSTRACTING; TIMING CIRCUITS;

EID: 85011294824     PISSN: 16191366     EISSN: 16191374     Source Type: Journal    
DOI: 10.1007/s10270-017-0579-8     Document Type: Article
Times cited : (32)

References (47)
  • 7
    • 85062053217 scopus 로고    scopus 로고
    • Release 4.1, Rev. 2, Ver. 1.1.0., The AUTOSAR Consortium, Oct
    • AUTOSAR Technical Overview, Release 4.1, Rev. 2, Ver. 1.1.0., The AUTOSAR Consortium, Oct 2013. http://autosar.org
    • (2013) AUTOSAR Technical Overview
  • 8
    • 80052109764 scopus 로고    scopus 로고
    • Ver. 2, TIMMO (TIMing MOdel), Deliverable 7, Oct, The TIMMO Consortium
    • TIMMO Methodology, Ver. 2, TIMMO (TIMing MOdel), Deliverable 7, Oct 2009, The TIMMO Consortium
    • (2009) TIMMO Methodology
  • 9
    • 85062054273 scopus 로고    scopus 로고
    • TIMMO-2-USE
    • TIMMO-2-USE. https://itea3.org/project/timmo-2-use.html
  • 12
    • 0028418313 scopus 로고
    • Holistic schedulability analysis for distributed hard real-time systems
    • Tindell, K., Clark, J.: Holistic schedulability analysis for distributed hard real-time systems. Microprocess. Microprogram. 40, 117–134 (1994)
    • (1994) Microprocess. Microprogram. , vol.40 , pp. 117-134
    • Tindell, K.1    Clark, J.2
  • 13
    • 84874625529 scopus 로고    scopus 로고
    • Support for end-to-end response-time and delay analysis in the industrial tool suite: issues, experiences and a case study
    • Mubeen, S., Mäki-Turja, J., Sjödin, M.: Support for end-to-end response-time and delay analysis in the industrial tool suite: issues, experiences and a case study. Comput. Sci. Inf. Syst. 10(1), 1361–1384 (2013)
    • (2013) Comput. Sci. Inf. Syst. , vol.10 , Issue.1 , pp. 1361-1384
    • Mubeen, S.1    Mäki-Turja, J.2    Sjödin, M.3
  • 14
    • 84894900492 scopus 로고    scopus 로고
    • Communications-oriented development of component-based vehicular distributed real-time embedded systems
    • Mubeen, S., Mäki-Turja, J., Sjödin, M.: Communications-oriented development of component-based vehicular distributed real-time embedded systems. J. Syst. Archit. 60(2), 207–220 (2014)
    • (2014) J. Syst. Archit. , vol.60 , Issue.2 , pp. 207-220
    • Mubeen, S.1    Mäki-Turja, J.2    Sjödin, M.3
  • 21
    • 84966285018 scopus 로고    scopus 로고
    • Version V2.1.12, Version V2.1.12, Deliverable 11, Aug, Accessed Mar 2016
    • EAST-ADL Domain Model Specification, Version V2.1.12, Version V2.1.12, Deliverable 11, Aug 2012,http://www.east-adl.info/Specification/V2.1.12/EAST-ADL-Specification_V2.1.12.pdf. Accessed Mar 2016
    • (2012) EAST-ADL Domain Model Specification
  • 24
    • 84902479181 scopus 로고    scopus 로고
    • An overview of the SAE Architecture Analysis & Design Language (AADL) standard: A basis for model-based architecture-driven embedded systems engineering
    • Springer, New York
    • Feiler, P., Lewis, B., Vestal, S., Colbert, E.: An overview of the SAE Architecture Analysis & Design Language (AADL) standard: a basis for model-based architecture-driven embedded systems engineering. In: Architecture Description Languages. The International Federation for Information Processing (IFIP), vol. 176. (Springer, New York, 2005), pp. 3–15
    • (2005) Architecture Description Languages. the International Federation for Information Processing (IFIP) , vol.176 , pp. 3-15
    • Feiler, P.1    Lewis, B.2    Vestal, S.3    Colbert, E.4
  • 25
    • 85062049473 scopus 로고    scopus 로고
    • SCADE Suite, Accessed Mar 2016
    • SCADE Suite. http://www.esterel-technologies.com/products/scade-suite. Accessed Mar 2016
  • 28
    • 85062052703 scopus 로고    scopus 로고
    • Accessed Mar 2016
    • CHESS Project, CHESS consortium. http://www.chess-project.org. Accessed Mar 2016
  • 31
    • 84881369480 scopus 로고    scopus 로고
    • An architectural approach to the analysis, verification and validation of software intensive embedded systems
    • Chen, D., Feng, L., Qureshi, T., Lönn, H., Hagl, F.: An architectural approach to the analysis, verification and validation of software intensive embedded systems. Computing 95(8), 649–688 (2013)
    • (2013) Computing , vol.95 , Issue.8 , pp. 649-688
    • Chen, D.1    Feng, L.2    Qureshi, T.3    Lönn, H.4    Hagl, F.5
  • 33
    • 84903475151 scopus 로고    scopus 로고
    • Mastering Timing Information for Advanced Automotive Systems Engineering
    • Mastering Timing Information for Advanced Automotive Systems Engineering. In the TIMMO-2-USE Brochure, 2012. http://www.timmo-2-use.org/pdf/T2UBrochure
    • (2012) The TIMMO-2-USE Brochure
  • 35
    • 84908031104 scopus 로고    scopus 로고
    • TECS components providing functionalities of OSEK specification for ITRON OS
    • Ohno, A., Azumi, T., Nishio, N.: TECS components providing functionalities of OSEK specification for ITRON OS. J. Inf. Process. 22(4), 584–594 (2014)
    • (2014) J. Inf. Process. , vol.22 , Issue.4 , pp. 584-594
    • Ohno, A.1    Azumi, T.2    Nishio, N.3
  • 37
    • 77954732859 scopus 로고    scopus 로고
    • CUTS: A system execution modeling tool for realizing continuous system integration testing
    • May
    • Hill, H.: CUTS: a system execution modeling tool for realizing continuous system integration testing. In: 32nd ACM/IEEE International Conference on Software Engineering, May 2010
    • (2010) 32Nd ACM/IEEE International Conference on Software Engineering
    • Hill, H.1
  • 39
    • 85062050074 scopus 로고    scopus 로고
    • EAST-ADL Tooling, Accessed Mar 2016
    • EAST-ADL Tooling. http://www.east-adl.info/Tooling.html. Accessed Mar 2016
  • 46
    • 0029267687 scopus 로고
    • Fixed priority pre-emptive scheduling: an historic perspective
    • Audsley, N., Burns, A., Davis, R., Tindell, K., Wellings, A.: Fixed priority pre-emptive scheduling: an historic perspective. Real-Time Syst. 8(2/3), 173–198 (1995)
    • (1995) Real-Time Syst. , vol.8 , Issue.2-3 , pp. 173-198
    • Audsley, N.1    Burns, A.2    Davis, R.3    Tindell, K.4    Wellings, A.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.