-
1
-
-
29144432257
-
A formalism for utilization of sensor systems and integrated project models for active construction quality control
-
[1] Akinci, B., Boukamp, F., Gordon, C., Huber, D., Lyons, C., Park, K., A formalism for utilization of sensor systems and integrated project models for active construction quality control. Autom. Constr. 15:2 (2006), 124–138, 10.1016/j.autcon.2005.01.008.
-
(2006)
Autom. Constr.
, vol.15
, Issue.2
, pp. 124-138
-
-
Akinci, B.1
Boukamp, F.2
Gordon, C.3
Huber, D.4
Lyons, C.5
Park, K.6
-
2
-
-
34249724458
-
An approach for real world data modelling with the 3D terrestrial laser scanner for built environment
-
[2] Arayici, Y., An approach for real world data modelling with the 3D terrestrial laser scanner for built environment. Autom. Constr. 16:6 (2007), 816–829, 10.1016/j.autcon.2007.02.008.
-
(2007)
Autom. Constr.
, vol.16
, Issue.6
, pp. 816-829
-
-
Arayici, Y.1
-
3
-
-
79960269657
-
Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry
-
[3] Azhar, S., Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry. Leadersh. Manag. Eng. 11:3 (2011), 241–252, 10.1061/(ASCE)LM.1943-5630.0000127.
-
(2011)
Leadersh. Manag. Eng.
, vol.11
, Issue.3
, pp. 241-252
-
-
Azhar, S.1
-
4
-
-
78649315598
-
A framework for an automated and integrated project monitoring and control system for steel fabrication projects
-
[4] Azimi, R., Lee, S., AbouRizk, S.M., Alvanchi, A., A framework for an automated and integrated project monitoring and control system for steel fabrication projects. Autom. Constr. 20:1 (2011), 88–97, 10.1016/j.autcon.2010.07.001.
-
(2011)
Autom. Constr.
, vol.20
, Issue.1
, pp. 88-97
-
-
Azimi, R.1
Lee, S.2
AbouRizk, S.M.3
Alvanchi, A.4
-
5
-
-
77955710066
-
Integrating resource production and construction using BIM
-
[5] Babič, N.Č., Podbreznik, P., Rebolj, D., Integrating resource production and construction using BIM. Autom. Constr. 19:5 (2010), 539–543, 10.1016/j.autcon.2009.11.005.
-
(2010)
Autom. Constr.
, vol.19
, Issue.5
, pp. 539-543
-
-
Babič, N.Č.1
Podbreznik, P.2
Rebolj, D.3
-
6
-
-
70350064472
-
Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control
-
[6] Bosché, F., Haas, C.T., Akinci, B., Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control. J. Comput. Civ. Eng. 23:6 (2009), 311–318, 10.1061/(ASCE)0887-3801(2009)23:6(311).
-
(2009)
J. Comput. Civ. Eng.
, vol.23
, Issue.6
, pp. 311-318
-
-
Bosché, F.1
Haas, C.T.2
Akinci, B.3
-
7
-
-
84902439119
-
Tracking the built status of MEP works: assessing the value of a scan-vs.- BIM system
-
(05014004-1)
-
[7] Bosché, F., Guillemet, A., Turkan, Y., Haas, C.T., Haas, R., Tracking the built status of MEP works: assessing the value of a scan-vs.- BIM system. J. Comput. Civ. Eng., 28(4), 2013, 10.1061/(ASCE)CP.1943-5487.0000343 (05014004-1).
-
(2013)
J. Comput. Civ. Eng.
, vol.28
, Issue.4
-
-
Bosché, F.1
Guillemet, A.2
Turkan, Y.3
Haas, C.T.4
Haas, R.5
-
8
-
-
84930762229
-
Bridging BIM and building: from a literature review to an integrated conceptual framework
-
[8] Chen, K., Lu, W.S., Peng, Y., Rowlinson, S., Huang, G.Q., Bridging BIM and building: from a literature review to an integrated conceptual framework. Int. J. Proj. Manag. 33:6 (2015), 1405–1416, 10.1016/j.ijproman.2015.03.006.
-
(2015)
Int. J. Proj. Manag.
, vol.33
, Issue.6
, pp. 1405-1416
-
-
Chen, K.1
Lu, W.S.2
Peng, Y.3
Rowlinson, S.4
Huang, G.Q.5
-
9
-
-
33744976826
-
Prefabrication and barriers to entry—a case study of public housing and institutional buildings in Hong Kong
-
[9] Chiang, Y.H., Chan, H.W., Lok, K.L., Prefabrication and barriers to entry—a case study of public housing and institutional buildings in Hong Kong. Habitat Int. 30:3 (2006), 482–499, 10.1016/j.habitatint.2004.12.004.
-
(2006)
Habitat Int.
, vol.30
, Issue.3
, pp. 482-499
-
-
Chiang, Y.H.1
Chan, H.W.2
Lok, K.L.3
-
10
-
-
84884559870
-
Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the Internet of Things
-
[11] Ding, L.Y., Zhou, C., Deng, Q.X., Luo, H.B., Ye, X.W., Ni, Y.Q., Guo, P., Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the Internet of Things. Autom. Constr. 36 (2013), 25–37, 10.1016/j.autcon.2013.08.017.
-
(2013)
Autom. Constr.
, vol.36
, pp. 25-37
-
-
Ding, L.Y.1
Zhou, C.2
Deng, Q.X.3
Luo, H.B.4
Ye, X.W.5
Ni, Y.Q.6
Guo, P.7
-
11
-
-
84941789600
-
Comparing carbon emissions of precast and cast-in-situ construction methods–a case study of high-rise private building
-
[12] Dong, Y.H., Jaillon, L., Chu, P., Poon, C., Comparing carbon emissions of precast and cast-in-situ construction methods–a case study of high-rise private building. Constr. Build. Mater. 99 (2015), 39–53, 10.1016/j.conbuildmat.2015.08.145.
-
(2015)
Constr. Build. Mater.
, vol.99
, pp. 39-53
-
-
Dong, Y.H.1
Jaillon, L.2
Chu, P.3
Poon, C.4
-
12
-
-
49949101732
-
An overview of approaches for utilizing RFID in construction industry
-
(5-6 Sept. 2007, Istanbul, Turkey)
-
[13] Ergen, E., Akinci, B., An overview of approaches for utilizing RFID in construction industry. RFID Eurasia, 2007 1st Annual, IEEE, 2007, 1–5, 10.1109/RFIDEURASIA.2007.4368087 (5-6 Sept. 2007, Istanbul, Turkey).
-
(2007)
RFID Eurasia, 2007 1st Annual, IEEE
, pp. 1-5
-
-
Ergen, E.1
Akinci, B.2
-
13
-
-
84953745931
-
Annual Report 2004/2005
-
HKSARG Hong Kong
-
[16] HKHA, Annual Report 2004/2005. 2005, HKSARG, Hong Kong.
-
(2005)
-
-
HKHA1
-
14
-
-
84876946866
-
Use of embedded RFID tags in concrete element supply chains
-
[17] Ikonen, J., Knutas, A., Hämäläinen, H., Ihonen, M., Porras, J., Kallonen, T., Use of embedded RFID tags in concrete element supply chains. Itcon 18:2013 (2013), 119–147.
-
(2013)
Itcon
, vol.18
, Issue.2013
, pp. 119-147
-
-
Ikonen, J.1
Knutas, A.2
Hämäläinen, H.3
Ihonen, M.4
Porras, J.5
Kallonen, T.6
-
15
-
-
84872948188
-
Information lifecycle management with RFID for material control on construction sites
-
[19] Lee, J.H., Song, J.H., Oh, K.S., Gu, N., Information lifecycle management with RFID for material control on construction sites. Adv. Eng. Inform. 27:1 (2013), 108–119, 10.1016/j.aei.2012.11.004.
-
(2013)
Adv. Eng. Inform.
, vol.27
, Issue.1
, pp. 108-119
-
-
Lee, J.H.1
Song, J.H.2
Oh, K.S.3
Gu, N.4
-
16
-
-
85009939736
-
A conceptual framework of prefabricated building construction management system using reverse Engi-neering, BIM, and WSN
-
[20] Lee, S.K., Kwon, S.W., A conceptual framework of prefabricated building construction management system using reverse Engi-neering, BIM, and WSN. Adv. Constr. Build. Technol. Soc., 2014, 37–42.
-
(2014)
Adv. Constr. Build. Technol. Soc.
, pp. 37-42
-
-
Lee, S.K.1
Kwon, S.W.2
-
17
-
-
84878412814
-
A framework for construction safety management and visualization system
-
[25] Park, C.S., Kim, H.J., A framework for construction safety management and visualization system. Autom. Constr. 33 (2013), 95–103, 10.1016/j.autcon.2012.09.012.
-
(2013)
Autom. Constr.
, vol.33
, pp. 95-103
-
-
Park, C.S.1
Kim, H.J.2
-
18
-
-
84872240863
-
Building Information Modeling (BIM) partnering framework for public construction projects
-
[27] Porwal, A., Hewage, K.N., Building Information Modeling (BIM) partnering framework for public construction projects. Autom. Constr. 31 (2013), 204–214, 10.1016/j.autcon.2012.12.004.
-
(2013)
Autom. Constr.
, vol.31
, pp. 204-214
-
-
Porwal, A.1
Hewage, K.N.2
-
19
-
-
81855196055
-
Construction engineering requirements for integrating laser scanning technology and building information modeling
-
[28] Randall, T., Construction engineering requirements for integrating laser scanning technology and building information modeling. J. Constr. Eng. Manag. 137:10 (2011), 797–805, 10.1061/(ASCE)CO.1943-7862.0000322.
-
(2011)
J. Constr. Eng. Manag.
, vol.137
, Issue.10
, pp. 797-805
-
-
Randall, T.1
-
20
-
-
84901938850
-
CoSMoS: a BIM and wireless sensor based integrated solution for worker safety in confined spaces
-
[29] Riaz, Z., Arslan, M., Kiani, A.K., Azhar, S., CoSMoS: a BIM and wireless sensor based integrated solution for worker safety in confined spaces. Autom. Constr. 45 (2014), 96–106, 10.1016/j.autcon.2014.05.010.
-
(2014)
Autom. Constr.
, vol.45
, pp. 96-106
-
-
Riaz, Z.1
Arslan, M.2
Kiani, A.K.3
Azhar, S.4
-
21
-
-
84870770628
-
Onsite 3D marking for construction activity tracking
-
[31] Shahi, A., West, J.S., Haas, C.T., Onsite 3D marking for construction activity tracking. Autom. Constr. 30 (2013), 136–143, 10.1016/j.autcon.2012.11.027.
-
(2013)
Autom. Constr.
, vol.30
, pp. 136-143
-
-
Shahi, A.1
West, J.S.2
Haas, C.T.3
-
22
-
-
30844462121
-
3D scan information management system for construction management
-
[32] Shih, N.J., Huang, S.T., 3D scan information management system for construction management. J. Constr. Eng. Manag. 132:2 (2006), 134–142, 10.1061/(ASCE)0733-9364(2006)132:2(134).
-
(2006)
J. Constr. Eng. Manag.
, vol.132
, Issue.2
, pp. 134-142
-
-
Shih, N.J.1
Huang, S.T.2
-
23
-
-
70350154933
-
Prototype development of an ICT system to support construction management based on virtual models and RFID
-
[33] Sørensen, K.B., Christiansson, P., Svidt, K., Prototype development of an ICT system to support construction management based on virtual models and RFID. J. Inf. Technol. Constr. 14:Special Issue (2009), 263–288.
-
(2009)
J. Inf. Technol. Constr.
, vol.14
, Issue.Special Issue
, pp. 263-288
-
-
Sørensen, K.B.1
Christiansson, P.2
Svidt, K.3
-
24
-
-
34249942080
-
Towards adoption of prefabrication in construction
-
[35] Tam, V.W., Tam, C.M., Zeng, S., Ng, W.C., Towards adoption of prefabrication in construction. Build. Environ. 42:10 (2007), 3642–3654, 10.1016/j.buildenv.2006.10.003.
-
(2007)
Build. Environ.
, vol.42
, Issue.10
, pp. 3642-3654
-
-
Tam, V.W.1
Tam, C.M.2
Zeng, S.3
Ng, W.C.4
-
25
-
-
84857370632
-
Automated progress tracking using 4D schedule and 3D sensing technologies
-
[36] Turkan, Y., Bosché, F., Haas, C.T., Haas, R., Automated progress tracking using 4D schedule and 3D sensing technologies. Autom. Constr. 22 (2012), 414–421, 10.1016/j.autcon.2011.10.003.
-
(2012)
Autom. Constr.
, vol.22
, pp. 414-421
-
-
Turkan, Y.1
Bosché, F.2
Haas, C.T.3
Haas, R.4
-
26
-
-
85010009903
-
An RFID and BIM based simulator for construction material logistics and progress management
-
[38] Yoon, S.W., Chin, S.Y., An RFID and BIM based simulator for construction material logistics and progress management. Korean J. Constr. Eng. Manag. 12:5 (2011), 46–54, 10.6106/KJCEM.2011.12.5.46.
-
(2011)
Korean J. Constr. Eng. Manag.
, vol.12
, Issue.5
, pp. 46-54
-
-
Yoon, S.W.1
Chin, S.Y.2
-
27
-
-
84929502678
-
A big data approach for logistics trajectory discovery from RFID-enabled production data
-
[40] Zhong, R.Y., Huang, G.Q., Lan, S.L., Dai, Q.Y., Chen, X., Zhang, T., A big data approach for logistics trajectory discovery from RFID-enabled production data. Int. J. Prod. Econ. 165 (2015), 260–272, 10.1016/j.ijpe.2015.02.014.
-
(2015)
Int. J. Prod. Econ.
, vol.165
, pp. 260-272
-
-
Zhong, R.Y.1
Huang, G.Q.2
Lan, S.L.3
Dai, Q.Y.4
Chen, X.5
Zhang, T.6
-
28
-
-
84939421306
-
Visualization of RFID-enabled shopfloor logistics Big Data in Cloud Manufacturing
-
[41] Zhong, R.Y., Lan, S.L., Xu, C., Dai, Q.Y., Huang, G.Q., Visualization of RFID-enabled shopfloor logistics Big Data in Cloud Manufacturing. Int. J. Adv. Manuf. Technol. 84:1–4 (2016), 5–16, 10.1007/s00170-015-7702-1.
-
(2016)
Int. J. Adv. Manuf. Technol.
, vol.84
, Issue.1-4
, pp. 5-16
-
-
Zhong, R.Y.1
Lan, S.L.2
Xu, C.3
Dai, Q.Y.4
Huang, G.Q.5
-
29
-
-
84978977044
-
Big Data for supply chain management in the service and manufacturing sectors: challenges, opportunities, and future perspectives
-
[42] Zhong, R.Y., Newman, S.T., Huang, G.Q., Lan, S.L., Big Data for supply chain management in the service and manufacturing sectors: challenges, opportunities, and future perspectives. Comput. Ind. Eng. 101 (2016), 572–591, 10.1016/j.cie.2016.07.013.
-
(2016)
Comput. Ind. Eng.
, vol.101
, pp. 572-591
-
-
Zhong, R.Y.1
Newman, S.T.2
Huang, G.Q.3
Lan, S.L.4
|