메뉴 건너뛰기




Volumn 76, Issue , 2017, Pages 59-70

Prefabricated construction enabled by the Internet-of-Things

Author keywords

BIM (Building Information Modelling); Internet of Things (IoT); Multi dimensional; Real time; Visibility and traceability

Indexed keywords

ARCHITECTURAL DESIGN; DECISION MAKING; DECISION SUPPORT SYSTEMS; GATEWAYS (COMPUTER NETWORKS); HOUSING; INFORMATION THEORY; INTEROPERABILITY; PREFABRICATED CONSTRUCTION; RADIO FREQUENCY IDENTIFICATION (RFID); VISIBILITY;

EID: 85009956057     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2017.01.006     Document Type: Article
Times cited : (313)

References (29)
  • 1
    • 29144432257 scopus 로고    scopus 로고
    • A formalism for utilization of sensor systems and integrated project models for active construction quality control
    • [1] Akinci, B., Boukamp, F., Gordon, C., Huber, D., Lyons, C., Park, K., A formalism for utilization of sensor systems and integrated project models for active construction quality control. Autom. Constr. 15:2 (2006), 124–138, 10.1016/j.autcon.2005.01.008.
    • (2006) Autom. Constr. , vol.15 , Issue.2 , pp. 124-138
    • Akinci, B.1    Boukamp, F.2    Gordon, C.3    Huber, D.4    Lyons, C.5    Park, K.6
  • 2
    • 34249724458 scopus 로고    scopus 로고
    • An approach for real world data modelling with the 3D terrestrial laser scanner for built environment
    • [2] Arayici, Y., An approach for real world data modelling with the 3D terrestrial laser scanner for built environment. Autom. Constr. 16:6 (2007), 816–829, 10.1016/j.autcon.2007.02.008.
    • (2007) Autom. Constr. , vol.16 , Issue.6 , pp. 816-829
    • Arayici, Y.1
  • 3
    • 79960269657 scopus 로고    scopus 로고
    • Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry
    • [3] Azhar, S., Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry. Leadersh. Manag. Eng. 11:3 (2011), 241–252, 10.1061/(ASCE)LM.1943-5630.0000127.
    • (2011) Leadersh. Manag. Eng. , vol.11 , Issue.3 , pp. 241-252
    • Azhar, S.1
  • 4
    • 78649315598 scopus 로고    scopus 로고
    • A framework for an automated and integrated project monitoring and control system for steel fabrication projects
    • [4] Azimi, R., Lee, S., AbouRizk, S.M., Alvanchi, A., A framework for an automated and integrated project monitoring and control system for steel fabrication projects. Autom. Constr. 20:1 (2011), 88–97, 10.1016/j.autcon.2010.07.001.
    • (2011) Autom. Constr. , vol.20 , Issue.1 , pp. 88-97
    • Azimi, R.1    Lee, S.2    AbouRizk, S.M.3    Alvanchi, A.4
  • 5
    • 77955710066 scopus 로고    scopus 로고
    • Integrating resource production and construction using BIM
    • [5] Babič, N.Č., Podbreznik, P., Rebolj, D., Integrating resource production and construction using BIM. Autom. Constr. 19:5 (2010), 539–543, 10.1016/j.autcon.2009.11.005.
    • (2010) Autom. Constr. , vol.19 , Issue.5 , pp. 539-543
    • Babič, N.Č.1    Podbreznik, P.2    Rebolj, D.3
  • 6
    • 70350064472 scopus 로고    scopus 로고
    • Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control
    • [6] Bosché, F., Haas, C.T., Akinci, B., Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control. J. Comput. Civ. Eng. 23:6 (2009), 311–318, 10.1061/(ASCE)0887-3801(2009)23:6(311).
    • (2009) J. Comput. Civ. Eng. , vol.23 , Issue.6 , pp. 311-318
    • Bosché, F.1    Haas, C.T.2    Akinci, B.3
  • 7
    • 84902439119 scopus 로고    scopus 로고
    • Tracking the built status of MEP works: assessing the value of a scan-vs.- BIM system
    • (05014004-1)
    • [7] Bosché, F., Guillemet, A., Turkan, Y., Haas, C.T., Haas, R., Tracking the built status of MEP works: assessing the value of a scan-vs.- BIM system. J. Comput. Civ. Eng., 28(4), 2013, 10.1061/(ASCE)CP.1943-5487.0000343 (05014004-1).
    • (2013) J. Comput. Civ. Eng. , vol.28 , Issue.4
    • Bosché, F.1    Guillemet, A.2    Turkan, Y.3    Haas, C.T.4    Haas, R.5
  • 8
    • 84930762229 scopus 로고    scopus 로고
    • Bridging BIM and building: from a literature review to an integrated conceptual framework
    • [8] Chen, K., Lu, W.S., Peng, Y., Rowlinson, S., Huang, G.Q., Bridging BIM and building: from a literature review to an integrated conceptual framework. Int. J. Proj. Manag. 33:6 (2015), 1405–1416, 10.1016/j.ijproman.2015.03.006.
    • (2015) Int. J. Proj. Manag. , vol.33 , Issue.6 , pp. 1405-1416
    • Chen, K.1    Lu, W.S.2    Peng, Y.3    Rowlinson, S.4    Huang, G.Q.5
  • 9
    • 33744976826 scopus 로고    scopus 로고
    • Prefabrication and barriers to entry—a case study of public housing and institutional buildings in Hong Kong
    • [9] Chiang, Y.H., Chan, H.W., Lok, K.L., Prefabrication and barriers to entry—a case study of public housing and institutional buildings in Hong Kong. Habitat Int. 30:3 (2006), 482–499, 10.1016/j.habitatint.2004.12.004.
    • (2006) Habitat Int. , vol.30 , Issue.3 , pp. 482-499
    • Chiang, Y.H.1    Chan, H.W.2    Lok, K.L.3
  • 10
    • 84884559870 scopus 로고    scopus 로고
    • Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the Internet of Things
    • [11] Ding, L.Y., Zhou, C., Deng, Q.X., Luo, H.B., Ye, X.W., Ni, Y.Q., Guo, P., Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the Internet of Things. Autom. Constr. 36 (2013), 25–37, 10.1016/j.autcon.2013.08.017.
    • (2013) Autom. Constr. , vol.36 , pp. 25-37
    • Ding, L.Y.1    Zhou, C.2    Deng, Q.X.3    Luo, H.B.4    Ye, X.W.5    Ni, Y.Q.6    Guo, P.7
  • 11
    • 84941789600 scopus 로고    scopus 로고
    • Comparing carbon emissions of precast and cast-in-situ construction methods–a case study of high-rise private building
    • [12] Dong, Y.H., Jaillon, L., Chu, P., Poon, C., Comparing carbon emissions of precast and cast-in-situ construction methods–a case study of high-rise private building. Constr. Build. Mater. 99 (2015), 39–53, 10.1016/j.conbuildmat.2015.08.145.
    • (2015) Constr. Build. Mater. , vol.99 , pp. 39-53
    • Dong, Y.H.1    Jaillon, L.2    Chu, P.3    Poon, C.4
  • 12
    • 49949101732 scopus 로고    scopus 로고
    • An overview of approaches for utilizing RFID in construction industry
    • (5-6 Sept. 2007, Istanbul, Turkey)
    • [13] Ergen, E., Akinci, B., An overview of approaches for utilizing RFID in construction industry. RFID Eurasia, 2007 1st Annual, IEEE, 2007, 1–5, 10.1109/RFIDEURASIA.2007.4368087 (5-6 Sept. 2007, Istanbul, Turkey).
    • (2007) RFID Eurasia, 2007 1st Annual, IEEE , pp. 1-5
    • Ergen, E.1    Akinci, B.2
  • 13
    • 84953745931 scopus 로고    scopus 로고
    • Annual Report 2004/2005
    • HKSARG Hong Kong
    • [16] HKHA, Annual Report 2004/2005. 2005, HKSARG, Hong Kong.
    • (2005)
    • HKHA1
  • 14
    • 84876946866 scopus 로고    scopus 로고
    • Use of embedded RFID tags in concrete element supply chains
    • [17] Ikonen, J., Knutas, A., Hämäläinen, H., Ihonen, M., Porras, J., Kallonen, T., Use of embedded RFID tags in concrete element supply chains. Itcon 18:2013 (2013), 119–147.
    • (2013) Itcon , vol.18 , Issue.2013 , pp. 119-147
    • Ikonen, J.1    Knutas, A.2    Hämäläinen, H.3    Ihonen, M.4    Porras, J.5    Kallonen, T.6
  • 15
    • 84872948188 scopus 로고    scopus 로고
    • Information lifecycle management with RFID for material control on construction sites
    • [19] Lee, J.H., Song, J.H., Oh, K.S., Gu, N., Information lifecycle management with RFID for material control on construction sites. Adv. Eng. Inform. 27:1 (2013), 108–119, 10.1016/j.aei.2012.11.004.
    • (2013) Adv. Eng. Inform. , vol.27 , Issue.1 , pp. 108-119
    • Lee, J.H.1    Song, J.H.2    Oh, K.S.3    Gu, N.4
  • 16
    • 85009939736 scopus 로고    scopus 로고
    • A conceptual framework of prefabricated building construction management system using reverse Engi-neering, BIM, and WSN
    • [20] Lee, S.K., Kwon, S.W., A conceptual framework of prefabricated building construction management system using reverse Engi-neering, BIM, and WSN. Adv. Constr. Build. Technol. Soc., 2014, 37–42.
    • (2014) Adv. Constr. Build. Technol. Soc. , pp. 37-42
    • Lee, S.K.1    Kwon, S.W.2
  • 17
    • 84878412814 scopus 로고    scopus 로고
    • A framework for construction safety management and visualization system
    • [25] Park, C.S., Kim, H.J., A framework for construction safety management and visualization system. Autom. Constr. 33 (2013), 95–103, 10.1016/j.autcon.2012.09.012.
    • (2013) Autom. Constr. , vol.33 , pp. 95-103
    • Park, C.S.1    Kim, H.J.2
  • 18
    • 84872240863 scopus 로고    scopus 로고
    • Building Information Modeling (BIM) partnering framework for public construction projects
    • [27] Porwal, A., Hewage, K.N., Building Information Modeling (BIM) partnering framework for public construction projects. Autom. Constr. 31 (2013), 204–214, 10.1016/j.autcon.2012.12.004.
    • (2013) Autom. Constr. , vol.31 , pp. 204-214
    • Porwal, A.1    Hewage, K.N.2
  • 19
    • 81855196055 scopus 로고    scopus 로고
    • Construction engineering requirements for integrating laser scanning technology and building information modeling
    • [28] Randall, T., Construction engineering requirements for integrating laser scanning technology and building information modeling. J. Constr. Eng. Manag. 137:10 (2011), 797–805, 10.1061/(ASCE)CO.1943-7862.0000322.
    • (2011) J. Constr. Eng. Manag. , vol.137 , Issue.10 , pp. 797-805
    • Randall, T.1
  • 20
    • 84901938850 scopus 로고    scopus 로고
    • CoSMoS: a BIM and wireless sensor based integrated solution for worker safety in confined spaces
    • [29] Riaz, Z., Arslan, M., Kiani, A.K., Azhar, S., CoSMoS: a BIM and wireless sensor based integrated solution for worker safety in confined spaces. Autom. Constr. 45 (2014), 96–106, 10.1016/j.autcon.2014.05.010.
    • (2014) Autom. Constr. , vol.45 , pp. 96-106
    • Riaz, Z.1    Arslan, M.2    Kiani, A.K.3    Azhar, S.4
  • 21
    • 84870770628 scopus 로고    scopus 로고
    • Onsite 3D marking for construction activity tracking
    • [31] Shahi, A., West, J.S., Haas, C.T., Onsite 3D marking for construction activity tracking. Autom. Constr. 30 (2013), 136–143, 10.1016/j.autcon.2012.11.027.
    • (2013) Autom. Constr. , vol.30 , pp. 136-143
    • Shahi, A.1    West, J.S.2    Haas, C.T.3
  • 22
    • 30844462121 scopus 로고    scopus 로고
    • 3D scan information management system for construction management
    • [32] Shih, N.J., Huang, S.T., 3D scan information management system for construction management. J. Constr. Eng. Manag. 132:2 (2006), 134–142, 10.1061/(ASCE)0733-9364(2006)132:2(134).
    • (2006) J. Constr. Eng. Manag. , vol.132 , Issue.2 , pp. 134-142
    • Shih, N.J.1    Huang, S.T.2
  • 23
    • 70350154933 scopus 로고    scopus 로고
    • Prototype development of an ICT system to support construction management based on virtual models and RFID
    • [33] Sørensen, K.B., Christiansson, P., Svidt, K., Prototype development of an ICT system to support construction management based on virtual models and RFID. J. Inf. Technol. Constr. 14:Special Issue (2009), 263–288.
    • (2009) J. Inf. Technol. Constr. , vol.14 , Issue.Special Issue , pp. 263-288
    • Sørensen, K.B.1    Christiansson, P.2    Svidt, K.3
  • 24
    • 34249942080 scopus 로고    scopus 로고
    • Towards adoption of prefabrication in construction
    • [35] Tam, V.W., Tam, C.M., Zeng, S., Ng, W.C., Towards adoption of prefabrication in construction. Build. Environ. 42:10 (2007), 3642–3654, 10.1016/j.buildenv.2006.10.003.
    • (2007) Build. Environ. , vol.42 , Issue.10 , pp. 3642-3654
    • Tam, V.W.1    Tam, C.M.2    Zeng, S.3    Ng, W.C.4
  • 25
    • 84857370632 scopus 로고    scopus 로고
    • Automated progress tracking using 4D schedule and 3D sensing technologies
    • [36] Turkan, Y., Bosché, F., Haas, C.T., Haas, R., Automated progress tracking using 4D schedule and 3D sensing technologies. Autom. Constr. 22 (2012), 414–421, 10.1016/j.autcon.2011.10.003.
    • (2012) Autom. Constr. , vol.22 , pp. 414-421
    • Turkan, Y.1    Bosché, F.2    Haas, C.T.3    Haas, R.4
  • 26
    • 85010009903 scopus 로고    scopus 로고
    • An RFID and BIM based simulator for construction material logistics and progress management
    • [38] Yoon, S.W., Chin, S.Y., An RFID and BIM based simulator for construction material logistics and progress management. Korean J. Constr. Eng. Manag. 12:5 (2011), 46–54, 10.6106/KJCEM.2011.12.5.46.
    • (2011) Korean J. Constr. Eng. Manag. , vol.12 , Issue.5 , pp. 46-54
    • Yoon, S.W.1    Chin, S.Y.2
  • 27
    • 84929502678 scopus 로고    scopus 로고
    • A big data approach for logistics trajectory discovery from RFID-enabled production data
    • [40] Zhong, R.Y., Huang, G.Q., Lan, S.L., Dai, Q.Y., Chen, X., Zhang, T., A big data approach for logistics trajectory discovery from RFID-enabled production data. Int. J. Prod. Econ. 165 (2015), 260–272, 10.1016/j.ijpe.2015.02.014.
    • (2015) Int. J. Prod. Econ. , vol.165 , pp. 260-272
    • Zhong, R.Y.1    Huang, G.Q.2    Lan, S.L.3    Dai, Q.Y.4    Chen, X.5    Zhang, T.6
  • 28
    • 84939421306 scopus 로고    scopus 로고
    • Visualization of RFID-enabled shopfloor logistics Big Data in Cloud Manufacturing
    • [41] Zhong, R.Y., Lan, S.L., Xu, C., Dai, Q.Y., Huang, G.Q., Visualization of RFID-enabled shopfloor logistics Big Data in Cloud Manufacturing. Int. J. Adv. Manuf. Technol. 84:1–4 (2016), 5–16, 10.1007/s00170-015-7702-1.
    • (2016) Int. J. Adv. Manuf. Technol. , vol.84 , Issue.1-4 , pp. 5-16
    • Zhong, R.Y.1    Lan, S.L.2    Xu, C.3    Dai, Q.Y.4    Huang, G.Q.5
  • 29
    • 84978977044 scopus 로고    scopus 로고
    • Big Data for supply chain management in the service and manufacturing sectors: challenges, opportunities, and future perspectives
    • [42] Zhong, R.Y., Newman, S.T., Huang, G.Q., Lan, S.L., Big Data for supply chain management in the service and manufacturing sectors: challenges, opportunities, and future perspectives. Comput. Ind. Eng. 101 (2016), 572–591, 10.1016/j.cie.2016.07.013.
    • (2016) Comput. Ind. Eng. , vol.101 , pp. 572-591
    • Zhong, R.Y.1    Newman, S.T.2    Huang, G.Q.3    Lan, S.L.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.