메뉴 건너뛰기




Volumn Part F129582, Issue , 1993, Pages 107-114

Does every inspection need a meeting?

Author keywords

[No Author keywords available]

Indexed keywords

SOFTWARE DESIGN; SOFTWARE ENGINEERING;

EID: 85009903143     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1145/256428.167070     Document Type: Conference Paper
Times cited : (124)

References (14)
  • 2
    • 0004010083 scopus 로고
    • Reading, Massachusetts: Addison-Wesley Publishing Co
    • W.S. Humphery, Managing the Software Process, Reading, Massachusetts: Addison-Wesley Publishing Co., 1989.
    • (1989) Managing the Software Process
    • Humphery, W.S.1
  • 6
    • 0022685886 scopus 로고
    • In-process inspections of workproducts at AT&T
    • March/April
    • P. J. Fowler, "In-Process Inspections of Workproducts at AT&T," AT&T Technical Journal, Volume 65, Issue 2, March/April 1986.
    • (1986) AT&T Technical Journal , vol.65 , Issue.2
    • Fowler, P.J.1
  • 8
    • 0017292244 scopus 로고
    • Design and code inspections to reduce errors in program development
    • M.E. Fagan, "Design and Code Inspections to Reduce Errors in Program Development," IBM Syst. J., vol. 15, no. 3, 1976, pp. 182-211.
    • (1976) IBM Syst. J. , vol.15 , Issue.3 , pp. 182-211
    • Fagan, M.E.1
  • 9
    • 0004253152 scopus 로고
    • Second Edition. Englewood Cliffs, NJ: Prentice-Hall
    • E. Yourdon, Structured Walkthroughs, Second Edition. Englewood Cliffs, NJ: Prentice-Hall, 1979.
    • (1979) Structured Walkthroughs
    • Yourdon, E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.