-
1
-
-
69249179924
-
-
C. McEntee, N. Strong, A. Sido and M. Allison. Washington, D.C., American Institute of Architects
-
American Institute of Architects, C. o. I. P. (2006). Report on Integrated Practice. C. McEntee, N. Strong, A. Sido and M. Allison. Washington, D.C., American Institute of Architects.
-
(2006)
Report on Integrated Practice
-
-
-
2
-
-
69249179924
-
-
Washington, D.C.: American Institute of Architects
-
American Institute of Architects, C. o. I. P. (2006). Report on Integrated Practice. Washington, D.C.: American Institute of Architects.
-
(2006)
Report on Integrated Practice
-
-
-
3
-
-
30744440355
-
The extent of team integration within construction projects
-
Baiden, B.K., Price, A.D.F., Dainty, A.R.J. (2006). “The extent of team integration within construction projects”. International Journal of Project Management, 24 (1), 13-23.
-
(2006)
International Journal of Project Management
, vol.24
, Issue.1
, pp. 13-23
-
-
Baiden, B.K.1
Price, A.D.F.2
Dainty, A.R.J.3
-
4
-
-
0004011301
-
-
Ph.D. Dissertation, School of Civil Engineering, University of Birmingham, Birmingham, United Kingdom
-
Ballard, G. (2000). The Last Planner System of Production Control, Ph.D. Dissertation, School of Civil Engineering, University of Birmingham, Birmingham, United Kingdom.
-
(2000)
The Last Planner System of Production Control
-
-
Ballard, G.1
-
6
-
-
85026640112
-
-
Nov. 2009
-
Ballard, G., Decker, D., Mack, J. (2009). “Lean Construction in California Health Care, Modern Steel Construction”, Nov. 2009. available at http://www.modernsteel.com/Uploads/Issues/November_2008/112008_30783_sutter_health_web.pdf
-
(2009)
Lean Construction in California Health Care, Modern Steel Construction
-
-
Ballard, G.1
Decker, D.2
Mack, J.3
-
7
-
-
27344439225
-
Insights into collaboration at the project level: Complexity, social interaction and procurement mechanisms
-
Cicmil, S., & Marshall, D. (2005). “Insights into collaboration at the project level: complexity, social interaction and procurement mechanisms”. Building Research & Information, 33(6), 523-535.
-
(2005)
Building Research & Information
, vol.33
, Issue.6
, pp. 523-535
-
-
Cicmil, S.1
Marshall, D.2
-
8
-
-
77954795877
-
-
A Joint Project of AIA California Council Integrated Project Delivery Steering Commitee and AIA National Integrated Practice Discussion Group
-
Cohen, J. (2010). Integrated Project Delivery: Case Studies, A Joint Project of AIA California Council Integrated Project Delivery Steering Commitee and AIA National Integrated Practice Discussion Group.
-
(2010)
Integrated Project Delivery: Case Studies
-
-
Cohen, J.1
-
9
-
-
78649271961
-
-
Retrieved July 10, 2010
-
Construction Management Association of America (CMAA). (2009). Managing Integrated Project Delivery. Retrieved July 10, 2010: http://cmaanet.org/files/shared/ng_Integrated_Project_Delivery11-19-092_pdf
-
(2009)
Managing Integrated Project Delivery
-
-
-
12
-
-
0002666634
-
Participant observation.
-
H. R. Bernard (Ed.), AltaMira Press, Walnut Creek, CA
-
DeWalt, K. M., DeWalt, B. R., & Wayland, C. B. (1998). “Participant observation.” In H. R. Bernard (Ed.), Handbook of methods in cultural anthropology. Pp: 259-299. AltaMira Press, Walnut Creek, CA.
-
(1998)
Handbook of Methods in Cultural Anthropology
, pp. 259-299
-
-
Dewalt, K.M.1
Dewalt, B.R.2
Wayland, C.B.3
-
14
-
-
85026641620
-
-
Paper presented at the Engineering Project Organiziation Conference, Lake Tahoe, CA
-
Dossick, C. S., & Neff, G. (2010a, November 4-6). “Messy Talk and Clean Technology: Requirements for Inter-organizational Collaboration and BIM Implementation within the AEC Industry”. Paper presented at the Engineering Project Organiziation Conference, Lake Tahoe, CA.
-
(2010)
Messy Talk and Clean Technology: Requirements for Inter-Organizational Collaboration and BIM Implementation within the AEC Industry
-
-
Dossick, C.S.1
Neff, G.2
-
15
-
-
77949691000
-
Organizational Divisions in BIM-Enabled Commercial Construction
-
Dossick, C. S., & Neff, G. (2010b). “Organizational Divisions in BIM-Enabled Commercial Construction”. Journal of Construction Engineering and Management, 136(4), 459-467
-
(2010)
Journal of Construction Engineering and Management
, vol.136
, Issue.4
, pp. 459-467
-
-
Dossick, C.S.1
Neff, G.2
-
17
-
-
70349760533
-
-
Managers, Designers, Engineers, and Contractors. Hoboken, New Jersey: John Wiley & Sons, Inc
-
Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2008). BIM Handbook: A Guide to Building Infomation Modeling for Owners, Managers, Designers, Engineers, and Contractors. Hoboken, New Jersey: John Wiley & Sons, Inc.
-
(2008)
BIM Handbook: A Guide to Building Infomation Modeling for Owners
-
-
Eastman, C.1
Teicholz, P.2
Sacks, R.3
Liston, K.4
-
18
-
-
0003732501
-
-
Construction Task force, London: UK. Retreived July 8, 2010
-
Egan J. (1998). Rethinking construction. Construction Task force, London: UK. Retreived July 8, 2010: http://www.architecture.com/Files/RIBAHoldings/PolicyAndInternationalRelations/Policy/PublicAffairs/RethinkingConstruction.pdf
-
(1998)
Rethinking Construction
-
-
Egan, J.1
-
19
-
-
0013298872
-
-
Strategic Forum for Constuction, London, UK. Retrieved July 10, 2010
-
Egan J. (2002). Accelerating change. Strategic Forum for Constuction, London, UK. Retrieved July 10, 2010: http://www.strategicforum.org.uk/pdf/report_sept02.pdf
-
(2002)
Accelerating Change
-
-
Egan, J.1
-
21
-
-
46349109442
-
3D Model-Based Collaboration in Design Development and Construction of Complex Shaped Buildings
-
Ku, K., Pollalis, S. N., Fischer, M. A., & Shelden, D. R. (2008). “3D Model-Based Collaboration in Design Development and Construction of Complex Shaped Buildings”. Journal of Information Technology in Construction, 13, 458-485.
-
(2008)
Journal of Information Technology in Construction
, vol.13
, pp. 458-485
-
-
Ku, K.1
Pollalis, S.N.2
Fischer, M.A.3
Shelden, D.R.4
-
22
-
-
84995943651
-
Sutter Health: Developing a Contracting Model to Support Lean Project Delivery
-
Lichtig, W. (2005) “Sutter Health: Developing a Contracting Model to Support Lean Project Delivery,” Lean Construction Journal, 2 (1): 105-112.
-
(2005)
Lean Construction Journal
, vol.2
, Issue.1
, pp. 105-112
-
-
Lichtig, W.1
-
23
-
-
77949736276
-
-
(Working Paper No. WP106): Stanford University
-
Liston, K., Fischer, M., Kunz, J., & Dong, N. (2007). “Observations of Two MEP iRoom Coordination Meetings: An Investigation of Artifact Use in AEC Project Meetings” (Working Paper No. WP106): Stanford University.
-
(2007)
Observations of Two MEP Iroom Coordination Meetings: An Investigation of Artifact Use in AEC Project Meetings
-
-
Liston, K.1
Fischer, M.2
Kunz, J.3
Dong, N.4
-
24
-
-
0032342510
-
Concurrent engineering: A strategy for procuring construction projects
-
Love, P.E.D., Gunasekaran, A., Li, H. (1998). “Concurrent engineering: a strategy for procuring construction projects”. Int. J. Project Management. 16(6):375-83.
-
(1998)
Int. J. Project Management.
, vol.16
, Issue.6
, pp. 375-383
-
-
Love, P.E.D.1
Gunasekaran, A.2
Li, H.3
-
25
-
-
0013043944
-
An experimental study of computer mediated collaborative design
-
Maher, M. L., Cicognan, A., & Simoff, S. J. (1998). “An experimental study of computer mediated collaborative design”. International Journal of Design Computing, 1, 10-20.
-
(1998)
International Journal of Design Computing
, vol.1
, pp. 10-20
-
-
Maher, M.L.1
Cicognan, A.2
Simoff, S.J.3
-
26
-
-
0034269299
-
Forces driving adoption of new information technologies
-
Mitropoulos, P., & Tatum, C. B. (2000). Forces driving adoption of new information technologies. J. Constr. And Mgmt., 126(5), 340-348.
-
(2000)
J. Constr and Mgmt.
, vol.126
, Issue.5
, pp. 340-348
-
-
Mitropoulos, P.1
Tatum, C.B.2
-
27
-
-
18144403769
-
Evaluation of stakeholder influence in the implementation of construction projects
-
Olander, S., Landin, A. (2005). “Evaluation of stakeholder influence in the implementation of construction projects”. International J. of Project Management 23: 321-328
-
(2005)
International J of Project Management
, vol.23
, pp. 321-328
-
-
Olander, S.1
Landin, A.2
-
28
-
-
0034416232
-
Using Technology and Constituting Structures: A Practice Lens for Studying Technology in Organizations
-
Orlikowski, W. J. (2000). “Using Technology and Constituting Structures: A Practice Lens for Studying Technology in Organizations”. Organization Science, 11(4), 404-428.
-
(2000)
Organization Science
, vol.11
, Issue.4
, pp. 404-428
-
-
Orlikowski, W.J.1
-
29
-
-
84891300255
-
-
Hoboken, New Jersey: John Wiley & Sons, Inc
-
Smith, D. K., & Tardif, M. (2009). Building Information Modeling: A Strategic Implementation Guide for Architects, Engineers, Constructors, and Real Estate Asset Managers. Hoboken, New Jersey: John Wiley & Sons, Inc.
-
(2009)
Building Information Modeling: A Strategic Implementation Guide for Architects, Engineers, Constructors, and Real Estate Asset Managers
-
-
Smith, D.K.1
Tardif, M.2
-
30
-
-
0001817489
-
Toyotas Principles of Set-Based Concurrent Engineering.”
-
Sobek D.K, II, Ward, A.C., and Liker, J.K. (1999). “Toyota’s Principles of Set-Based Concurrent Engineering.” Sloan Management Review, Winter, 67-83.
-
(1999)
Sloan Management Review, Winter
, pp. 67-83
-
-
Sobek, D.K.1
Ward, A.C.2
Liker, J.K.3
-
31
-
-
0030354997
-
Brainstorming Groups in Context: Effectiveness in a Product Design Firm
-
Sutton, R. I., & Hargadon, A. (1996). Brainstorming Groups in Context: Effectiveness in a Product Design Firm. Administrative Science Quarterly, 41(4), 685-718.
-
(1996)
Administrative Science Quarterly
, vol.41
, Issue.4
, pp. 685-718
-
-
Sutton, R.I.1
Hargadon, A.2
-
33
-
-
36249022572
-
Antecedents of Successful Three-Dimensional Computer-Aided Design Implementation in Design and Construction Networks
-
Taylor, J. (2007). Antecedents of Successful Three-Dimensional Computer-Aided Design Implementation in Design and Construction Networks. Journal of Construction Engineering and Management, 133(12).
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.12
-
-
Taylor, J.1
-
34
-
-
0002533915
-
-
How Delaying Decisions can Make Better Cars Faster.” Sloan Management Review, Spring
-
Ward, A., Liker, J.K., Cristiano, J.J., and Sobek, D.K II. (1995). “The Second Toyota Paradox: How Delaying Decisions can Make Better Cars Faster.” Sloan Management Review, Spring, 43-61.
-
(1995)
“The Second Toyota Paradox
, pp. 43-61
-
-
Ward, A.1
Liker, J.K.2
Cristiano, J.J.3
Sobek, D.K.4
|