|
Volumn , Issue , 2016, Pages
|
The experience of using jet pumps with hydraulic pumping bottom-hole assemblies to reactivate idle wells in a heavy oil reservoir in the East Soldado field
|
Author keywords
[No Author keywords available]
|
Indexed keywords
ASSEMBLY;
BOTTOM-HOLE ASSEMBLY;
CRUDE OIL;
EJECTORS (PUMPS);
ENERGY RESOURCES;
FIGHTER AIRCRAFT;
INJECTION (OIL WELLS);
JET PUMPS;
NOZZLES;
OFFSHORE OIL WELLS;
OIL WELL COMPLETION;
OIL WELL PUMPING;
OIL WELLS;
OPERATING COSTS;
PETROLEUM ENGINEERING;
PETROLEUM RESERVOIR ENGINEERING;
PETROLEUM RESERVOIR EVALUATION;
PETROLEUM RESERVOIRS;
PISTONS;
PUMPS;
RECIPROCATING PUMPS;
ULTRASONIC APPLICATIONS;
WELL COMPLETION;
WELL STIMULATION;
ARTIFICIAL LIFT METHODS;
HEAVY OIL RESERVOIRS;
HYDRAULIC PISTONS;
HYDRAULIC PUMPING;
MONITORING PARAMETERS;
OPTIMUM PERFORMANCE;
PRODUCTION RATES;
PRODUCTION STRINGS;
HEAVY OIL PRODUCTION;
|
EID: 85009061168
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.2118/180799-MS Document Type: Conference Paper |
Times cited : (1)
|
References (4)
|