메뉴 건너뛰기




Volumn 79, Issue , 2017, Pages 207-222

Multiscale production routing in multicommodity supply chains with complex production facilities

Author keywords

MILP based heuristic; Multiscale optimization; Production routing; Production scheduling; Supply chain management

Indexed keywords

COORDINATION REACTIONS; HEURISTIC METHODS; INTEGER PROGRAMMING; ITERATIVE METHODS; PRODUCTION CONTROL; SUPPLY CHAIN MANAGEMENT; VEHICLE ROUTING;

EID: 84998667842     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2016.11.001     Document Type: Article
Times cited : (53)

References (39)
  • 1
    • 84946012494 scopus 로고    scopus 로고
    • A two-phase iterative heuristic approach for the production routing problem
    • [1] Absi, N., Archetti, C., Dauzère-Pérès, S., Feillet, D., A two-phase iterative heuristic approach for the production routing problem. Transp Sci 49:4 (2015), 784–795.
    • (2015) Transp Sci , vol.49 , Issue.4 , pp. 784-795
    • Absi, N.1    Archetti, C.2    Dauzère-Pérès, S.3    Feillet, D.4
  • 2
    • 84893873667 scopus 로고    scopus 로고
    • Formulations and branch-and-cut algorithms for multivehicle production and inventory routing problems
    • [2] Adulyasak, Y., Cordeau, J.-F., Jans, R., Formulations and branch-and-cut algorithms for multivehicle production and inventory routing problems. INFORMS J 26:1 (2014), 103–120.
    • (2014) INFORMS J , vol.26 , Issue.1 , pp. 103-120
    • Adulyasak, Y.1    Cordeau, J.-F.2    Jans, R.3
  • 3
    • 84894570180 scopus 로고    scopus 로고
    • Optimization-based adaptive large neighborhood search for the production routing problem
    • [3] Adulyasak, Y., Cordeau, J.-F., Jans, R., Optimization-based adaptive large neighborhood search for the production routing problem. Transp Sci 48:1 (2014), 20–45.
    • (2014) Transp Sci , vol.48 , Issue.1 , pp. 20-45
    • Adulyasak, Y.1    Cordeau, J.-F.2    Jans, R.3
  • 4
    • 84937863906 scopus 로고    scopus 로고
    • Benders decomposition for production routing under demand uncertainty
    • [4] Adulyasak, Y., Cordeau, J.-F., Jans, R., Benders decomposition for production routing under demand uncertainty. Oper Res 63:4 (2015), 851–867.
    • (2015) Oper Res , vol.63 , Issue.4 , pp. 851-867
    • Adulyasak, Y.1    Cordeau, J.-F.2    Jans, R.3
  • 5
    • 84919340915 scopus 로고    scopus 로고
    • The production routing problem: a review of formulations and solution algorithms
    • [5] Adulyasak, Y., Cordeau, J.-F., Jans, R., The production routing problem: a review of formulations and solution algorithms. Comput Oper Res 55 (2015), 141–152.
    • (2015) Comput Oper Res , vol.55 , pp. 141-152
    • Adulyasak, Y.1    Cordeau, J.-F.2    Jans, R.3
  • 6
    • 79955067887 scopus 로고    scopus 로고
    • Analysis of the maximum level policy in a production-distribution system
    • [6] Archetti, C., Bertazzi, L., Paletta, G., Speranza, M.G., Analysis of the maximum level policy in a production-distribution system. Comput Oper Res 38:12 (2011), 1731–1746.
    • (2011) Comput Oper Res , vol.38 , Issue.12 , pp. 1731-1746
    • Archetti, C.1    Bertazzi, L.2    Paletta, G.3    Speranza, M.G.4
  • 7
    • 78650513384 scopus 로고    scopus 로고
    • Tabu search with path relinking for an integrated production-distribution problem
    • [7] Armentano, V.A., Shiguemoto, A.L., Løkketangen, A., Tabu search with path relinking for an integrated production-distribution problem. Comput Oper Res 38:8 (2011), 1199–1209.
    • (2011) Comput Oper Res , vol.38 , Issue.8 , pp. 1199-1209
    • Armentano, V.A.1    Shiguemoto, A.L.2    Løkketangen, A.3
  • 8
    • 0000495533 scopus 로고
    • On an integer program for a delivery problem
    • [8] Balinski, M.L., Quandt, R.E., On an integer program for a delivery problem. Oper Res 12:2 (1964), 300–304.
    • (1964) Oper Res , vol.12 , Issue.2 , pp. 300-304
    • Balinski, M.L.1    Quandt, R.E.2
  • 9
    • 69849087762 scopus 로고    scopus 로고
    • Heuristics for a multiperiod inventory routing problem with production decisions
    • [9] Bard, J.F., Nananukul, N., Heuristics for a multiperiod inventory routing problem with production decisions. Comput Ind Eng 57:3 (2009), 713–723.
    • (2009) Comput Ind Eng , vol.57 , Issue.3 , pp. 713-723
    • Bard, J.F.1    Nananukul, N.2
  • 10
    • 67349211770 scopus 로고    scopus 로고
    • The integrated production-inventory-distribution-routing problem
    • [10] Bard, J.F., Nananukul, N., The integrated production-inventory-distribution-routing problem. J Sched 12:3 (2009), 257–280.
    • (2009) J Sched , vol.12 , Issue.3 , pp. 257-280
    • Bard, J.F.1    Nananukul, N.2
  • 11
    • 77955271201 scopus 로고    scopus 로고
    • A branch-and-price algorithm for an integrated production and inventory routing problem
    • [11] Bard, J.F., Nananukul, N., A branch-and-price algorithm for an integrated production and inventory routing problem. Comput Oper Res 37:12 (2010), 2202–2217.
    • (2010) Comput Oper Res , vol.37 , Issue.12 , pp. 2202-2217
    • Bard, J.F.1    Nananukul, N.2
  • 12
    • 34047126268 scopus 로고    scopus 로고
    • A reactive GRASP and path relinking for a combined production-distribution problem
    • [12] Boudia, M., Louly, M., Prins, C., A reactive GRASP and path relinking for a combined production-distribution problem. Comput Oper Res 34:11 (2007), 3402–3419.
    • (2007) Comput Oper Res , vol.34 , Issue.11 , pp. 3402-3419
    • Boudia, M.1    Louly, M.2    Prins, C.3
  • 13
    • 56349117292 scopus 로고    scopus 로고
    • A memetic algorithm with dynamic population management for an integrated production-distribution problem
    • [13] Boudia, M., Prins, C., A memetic algorithm with dynamic population management for an integrated production-distribution problem. Eur J Oper Res 195:3 (2009), 703–715.
    • (2009) Eur J Oper Res , vol.195 , Issue.3 , pp. 703-715
    • Boudia, M.1    Prins, C.2
  • 14
    • 0035566749 scopus 로고    scopus 로고
    • The Kellogg company optimizes production, inventory, and distribution
    • [14] Brown, G., Keegan, J., Vigus, B., Wood, K., The Kellogg company optimizes production, inventory, and distribution. Interfaces 31:6 (2001), 1–15.
    • (2001) Interfaces , vol.31 , Issue.6 , pp. 1-15
    • Brown, G.1    Keegan, J.2    Vigus, B.3    Wood, K.4
  • 16
    • 70350511633 scopus 로고    scopus 로고
    • An integrated outbound logistics model for frito-lay: coordinating aggregate-level production and distribution decisions
    • [16] Çetinkaya, S., Üster, H., Easwaran, G., Keskin, B.B., An integrated outbound logistics model for frito-lay: coordinating aggregate-level production and distribution decisions. Interfaces 39:5 (2009), 460–475.
    • (2009) Interfaces , vol.39 , Issue.5 , pp. 460-475
    • Çetinkaya, S.1    Üster, H.2    Easwaran, G.3    Keskin, B.B.4
  • 17
    • 0028371172 scopus 로고
    • Coordination of production and distribution planning
    • [17] Chandra, P., Fisher, M.L., Coordination of production and distribution planning. Eur J Oper Res 72:3 (1994), 503–517.
    • (1994) Eur J Oper Res , vol.72 , Issue.3 , pp. 503-517
    • Chandra, P.1    Fisher, M.L.2
  • 18
    • 84893757981 scopus 로고    scopus 로고
    • Thirty years of inventory routing
    • [18] Coelho, L.C., Cordeau, J.-F., Laporte, G., Thirty years of inventory routing. Transp Sci 48:1 (2013), 1–19.
    • (2013) Transp Sci , vol.48 , Issue.1 , pp. 1-19
    • Coelho, L.C.1    Cordeau, J.-F.2    Laporte, G.3
  • 19
    • 0002279446 scopus 로고
    • Improvements and extensions to the Miller-Tucker-Zemlin subtour elimination constraints
    • [19] Desrochers, M., Laporte, G., Improvements and extensions to the Miller-Tucker-Zemlin subtour elimination constraints. Oper Res Lett 10:1 (1991), 27–36.
    • (1991) Oper Res Lett , vol.10 , Issue.1 , pp. 27-36
    • Desrochers, M.1    Laporte, G.2
  • 20
    • 0032661559 scopus 로고    scopus 로고
    • Integrated production/distribution planning in supply chains: an invited review
    • [20] Erengüç, S., Simpson, N., Vakharia, A.J., Integrated production/distribution planning in supply chains: an invited review. Eur J Oper Res 115:2 (1999), 219–236.
    • (1999) Eur J Oper Res , vol.115 , Issue.2 , pp. 219-236
    • Erengüç, S.1    Simpson, N.2    Vakharia, A.J.3
  • 21
    • 84891501093 scopus 로고    scopus 로고
    • A review and critique on integrated production-distribution planning models and techniques
    • [21] Fahimnia, B., Farahani, R.Z., Marian, R., Luong, L., A review and critique on integrated production-distribution planning models and techniques. J Manuf Syst 32:1 (2013), 1–19.
    • (2013) J Manuf Syst , vol.32 , Issue.1 , pp. 1-19
    • Fahimnia, B.1    Farahani, R.Z.2    Marian, R.3    Luong, L.4
  • 22
    • 0033339421 scopus 로고    scopus 로고
    • Synchronized development of production, inventory, and distribution schedules
    • [22] Fumero, F., Vercellis, C., Synchronized development of production, inventory, and distribution schedules. Transp Sci 33:3 (1999), 330–340.
    • (1999) Transp Sci , vol.33 , Issue.3 , pp. 330-340
    • Fumero, F.1    Vercellis, C.2
  • 24
    • 50549084067 scopus 로고    scopus 로고
    • Combining optimization and simulation for strategic and operational industrial gas production and distribution
    • [24] Glankwamdee, W., Linderoth, J., Shen, J., Connard, P., Hutton, J., Combining optimization and simulation for strategic and operational industrial gas production and distribution. Comput Chem Eng 32:11 (2008), 2536–2546.
    • (2008) Comput Chem Eng , vol.32 , Issue.11 , pp. 2536-2546
    • Glankwamdee, W.1    Linderoth, J.2    Shen, J.3    Connard, P.4    Hutton, J.5
  • 26
    • 0041511823 scopus 로고    scopus 로고
    • The capacitated lot sizing problem: a review of models and algorithms
    • [26] Karimi, B., Fatemi Ghomi, S., Wilson, J., The capacitated lot sizing problem: a review of models and algorithms. Omega 31:5 (2003), 365–378.
    • (2003) Omega , vol.31 , Issue.5 , pp. 365-378
    • Karimi, B.1    Fatemi Ghomi, S.2    Wilson, J.3
  • 27
    • 84874109008 scopus 로고    scopus 로고
    • Prospective and perspective review in integrated supply chain modelling for the chemical process industry
    • [27] Laínez, J.M., Puigjaner, L., Prospective and perspective review in integrated supply chain modelling for the chemical process industry. Curr Opin Chem Eng 1:4 (2012), 430–445.
    • (2012) Curr Opin Chem Eng , vol.1 , Issue.4 , pp. 430-445
    • Laínez, J.M.1    Puigjaner, L.2
  • 28
    • 73349128424 scopus 로고    scopus 로고
    • Fifty years of vehicle routing
    • [28] Laporte, G., Fifty years of vehicle routing. Transp Sci 43:4 (2009), 408–416.
    • (2009) Transp Sci , vol.43 , Issue.4 , pp. 408-416
    • Laporte, G.1
  • 29
    • 33748518397 scopus 로고    scopus 로고
    • On the integrated production, inventory, and distribution routing problem
    • [29] Lei, L., Liu, S., Ruszczynski, A., Park, S., On the integrated production, inventory, and distribution routing problem. IIE Trans 38:11 (2006), 955–970.
    • (2006) IIE Trans , vol.38 , Issue.11 , pp. 955-970
    • Lei, L.1    Liu, S.2    Ruszczynski, A.3    Park, S.4
  • 31
    • 84857444866 scopus 로고    scopus 로고
    • Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes
    • [31] Mitra, S., Grossmann, I.E., Pinto, J.M., Arora, N., Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes. Comput Chem Eng 38 (2012), 171–184.
    • (2012) Comput Chem Eng , vol.38 , pp. 171-184
    • Mitra, S.1    Grossmann, I.E.2    Pinto, J.M.3    Arora, N.4
  • 32
    • 35348974381 scopus 로고    scopus 로고
    • Production planning by mixed integer programming
    • Springer Science+Business Media New York
    • [32] Pochet, Y., Wolsey, L.A., Production planning by mixed integer programming. 2006, Springer Science+Business Media, New York.
    • (2006)
    • Pochet, Y.1    Wolsey, L.A.2
  • 34
    • 84868200552 scopus 로고    scopus 로고
    • Rich routing problems arising in supply chain management
    • [34] Schmid, V., Doerner, K.F., Laporte, G., Rich routing problems arising in supply chain management. Eur J Oper Res 224:3 (2013), 435–448.
    • (2013) Eur J Oper Res , vol.224 , Issue.3 , pp. 435-448
    • Schmid, V.1    Doerner, K.F.2    Laporte, G.3
  • 35
    • 0041760308 scopus 로고    scopus 로고
    • Coordinated supply chain management
    • [35] Thomas, D.J., Griffin, P.M., Coordinated supply chain management. Eur J Oper Res 94:1 (1996), 1–15.
    • (1996) Eur J Oper Res , vol.94 , Issue.1 , pp. 1-15
    • Thomas, D.J.1    Griffin, P.M.2
  • 37
    • 84960462194 scopus 로고    scopus 로고
    • Rolling horizon approach for production-distribution coordination of industrial gases supply chains
    • [37] Zamarripa, M., Marchetti, P.A., Grossmann, I.E., Singh, T., Lotero, I., Gopalakrishnan, A., et al. Rolling horizon approach for production-distribution coordination of industrial gases supply chains. Ind Eng Chem Res 55 (2016), 2646–2660.
    • (2016) Ind Eng Chem Res , vol.55 , pp. 2646-2660
    • Zamarripa, M.1    Marchetti, P.A.2    Grossmann, I.E.3    Singh, T.4    Lotero, I.5    Gopalakrishnan, A.6
  • 38
    • 84946144571 scopus 로고    scopus 로고
    • Data-driven construction of convex region surrogate models
    • [38] Zhang, Q., Grossmann, I.E., Sundaramoorthy, A., Pinto, J.M., Data-driven construction of convex region surrogate models. Optim Eng 17:2 (2016), 289–332.
    • (2016) Optim Eng , vol.17 , Issue.2 , pp. 289-332
    • Zhang, Q.1    Grossmann, I.E.2    Sundaramoorthy, A.3    Pinto, J.M.4
  • 39
    • 84944145301 scopus 로고    scopus 로고
    • A discrete-time scheduling model for continuous power-intensive process networks with various power contracts
    • [39] Zhang, Q., Sundaramoorthy, A., Grossmann, I.E., Pinto, J.M., A discrete-time scheduling model for continuous power-intensive process networks with various power contracts. Comput Chem Eng 84 (2016), 382–393.
    • (2016) Comput Chem Eng , vol.84 , pp. 382-393
    • Zhang, Q.1    Sundaramoorthy, A.2    Grossmann, I.E.3    Pinto, J.M.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.