메뉴 건너뛰기




Volumn 2, Issue , 2016, Pages

The advantages of integrating major hazard safety and impact assessments for pipeline projects

Author keywords

[No Author keywords available]

Indexed keywords

ACCIDENTS; CONSTRUCTION EQUIPMENT; COST EFFECTIVENESS; CRUDE OIL; ECONOMIC AND SOCIAL EFFECTS; ENVIRONMENTAL IMPACT; GAS HAZARDS; GAS PIPELINES; HAZARDS; INTEGRATED CONTROL; OFFSHORE OIL WELLS; PETROLEUM PRODUCTS; PETROLEUM TRANSPORTATION; PIPELINES; PIPING SYSTEMS; RISK ASSESSMENT; SAFETY ENGINEERING; TRAFFIC SURVEYS; WATER PIPELINES;

EID: 84996848677     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1115/IPC2016-64370     Document Type: Conference Paper
Times cited : (3)

References (8)
  • 2
    • 84996612555 scopus 로고    scopus 로고
    • Transportation Safety Board of Canada, Pipeline Investigation Report P07H0040, Trans Mountain Pipeline L.P. 610-Millimetre- Diameter Crude Oil Pipeline, Kilometre Post 3.10, Westridge Dock Transfer Line, Burnaby, British Columbia, 24 July
    • Transportation Safety Board of Canada, Pipeline Investigation Report P07H0040, Crude Oil Pipeline - Third- Party Damage, Trans Mountain Pipeline L.P. 610-Millimetre- Diameter Crude Oil Pipeline, Kilometre Post 3.10, Westridge Dock Transfer Line, Burnaby, British Columbia, 24 July 2007.
    • (2007) Crude Oil Pipeline - Third- Party Damage
  • 4
    • 84996641455 scopus 로고    scopus 로고
    • http://www.nytimes.com/1998/10/19/world/oil-pipelineblast-fire-colombia-kill-45-mostly-villagers-rebels-Areblamed.html.
  • 5
    • 84996641471 scopus 로고    scopus 로고
    • http://www3.gendisasters.com/alaska/13500/fairbanks-Akvicinity-oil-pipeline-blast-july-1977.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.