메뉴 건너뛰기




Volumn 4, Issue 4, 2003, Pages 15-22

Using discrete-event simulation to create flexibility in apac supply chain management

Author keywords

Decision support system; Flexibility; Simulation; Supply chain management

Indexed keywords


EID: 84993777210     PISSN: 09722696     EISSN: 09740198     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (7)

References (23)
  • 1
    • 0032687229 scopus 로고    scopus 로고
    • Limited Flexibility in Cellular Manufacturing Systems: A Simulation Study
    • Albino V. and Garavelli A.C. (1999) Limited Flexibility in Cellular Manufacturing Systems: A Simulation Study, International Journal of Production Economics, 60/61, 447-455.
    • (1999) International Journal of Production Economics , vol.60-61 , pp. 447-455
    • Albino, V.1    Garavelli, A.C.2
  • 3
    • 0034659588 scopus 로고    scopus 로고
    • Implementation of An Object-Oriented Tool for the Simulation of Manufacturing Systems
    • Borenstein D. (2000) Implementation of An Object-Oriented Tool for the Simulation of Manufacturing Systems, International Journal of Production Research, 38 (9), 2125-2142.
    • (2000) International Journal of Production Research , vol.38 , Issue.9 , pp. 2125-2142
    • Borenstein, D.1
  • 4
    • 0031189965 scopus 로고    scopus 로고
    • Impact of Routing Flexibility on the Performance of An FMS A Simulation Study
    • Caprihan R. and Wadhwa S. (1997) Impact of Routing Flexibility on the Performance of An FMS A Simulation Study, International Journal of Flexible Manufacturing Systems, 9 (3), 273-298.
    • (1997) International Journal of Flexible Manufacturing Systems , vol.9 , Issue.3 , pp. 273-298
    • Caprihan, R.1    Wadhwa, S.2
  • 5
    • 0027576654 scopus 로고
    • A Robust Adaptive Scheduler for an Intelligence Workstation Controller
    • Cho H. and Wysk R.A. (1993) A Robust Adaptive Scheduler for an Intelligence Workstation Controller, International Journal of Production Research, 31 (4), 771-789.
    • (1993) International Journal of Production Research , vol.31 , Issue.4 , pp. 771-789
    • Cho, H.1    Wysk, R.A.2
  • 9
    • 0035276196 scopus 로고    scopus 로고
    • Equipment Flexibility Vs. Inventory: A Simulation Study of Manufacturing Systems
    • Garg S., Vrat P. and Kanda A. (2001) Equipment Flexibility Vs. Inventory: A Simulation Study of Manufacturing Systems, International Journal of Production Economics, 70 (2), 125-143.
    • (2001) International Journal of Production Economics , vol.70 , Issue.2 , pp. 125-143
    • Garg, S.1    Vrat, P.2    Kanda, A.3
  • 10
    • 0026836252 scopus 로고
    • Flexibility Trade-offs in a Random Flexible Manufacturing System: A Simulation Study
    • Gupta Y.P. and Goyal S. (1992) Flexibility Trade-offs in a Random Flexible Manufacturing System: A Simulation Study, International Journal of Production Research, 30 (3), 527-557.
    • (1992) International Journal of Production Research , vol.30 , Issue.3 , pp. 527-557
    • Gupta, Y.P.1    Goyal, S.2
  • 12
    • 0025564697 scopus 로고
    • Implementation Issues Using Simulation for Real-Time Scheduling, Control, and Monitoring
    • New Orleans
    • Harmonosky C.M. (1990) Implementation Issues Using Simulation for Real-Time Scheduling, Control, and Monitoring, Proceedings of the Winter Simulation Conference, New Orleans.
    • (1990) Proceedings of the Winter Simulation Conference
    • Harmonosky, C.M.1
  • 15
    • 0026838740 scopus 로고
    • An Investigation of the Effect of Machine Flexibility and Number of Part Families
    • Nandkeolyar U. and Christy D.P. (1992) An Investigation of the Effect of Machine Flexibility and Number of Part Families, International Journal of Production Research, 30 (3), 513-526.
    • (1992) International Journal of Production Research , vol.30 , Issue.3 , pp. 513-526
    • Nandkeolyar, U.1    Christy, D.P.2
  • 20
    • 0002646636 scopus 로고
    • Expanding Simulation beyond Planning and Design
    • Thompson M.B. (1994) Expanding Simulation beyond Planning and Design, Industrial Engineering, 26 (10), 65-67.
    • (1994) Industrial Engineering , vol.26 , Issue.10 , pp. 65-67
    • Thompson, M.B.1
  • 22
    • 0024731596 scopus 로고
    • An Application of Discrete-Event Simulation to On-Line Control and Scheduling in Flexible Manufacturing
    • Wu D.S. and Wysk R.A. (1989) An Application of Discrete-Event Simulation to On-Line Control and Scheduling in Flexible Manufacturing, International Journal of Production Research, 27, 1603-1624.
    • (1989) International Journal of Production Research , vol.27 , pp. 1603-1624
    • Wu, D.S.1    Wysk, R.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.