메뉴 건너뛰기




Volumn 7, Issue 1, 2000, Pages 15-28

Establishing and processing client requirements—a key aspect of concurrent engineering in construction

Author keywords

Client requirements processing; Concurrent engineering; Construction

Indexed keywords


EID: 84993102438     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/eb021129     Document Type: Review
Times cited : (73)

References (59)
  • 1
    • 0001901320 scopus 로고    scopus 로고
    • Concurrent engineering in construction: State of the An
    • 1–3 September, (eds P.K. Chawdhry, P. Ghodous & D. Vandorpe), University of Bath, UK
    • Anumba, C.J. & Kamara, J.M. (1999) Concurrent engineering in construction: State of the An. In: Advances in Concurrent Engineering, Proceedings CE99, 1–3 September (eds P.K. Chawdhry, P. Ghodous & D. Vandorpe), pp. 461–470. University of Bath, UK.
    • (1999) Advances in Concurrent Engineering, Proceedings CE99 , pp. 461-470
    • Anumba, C.J.1    Kamara, J.M.2
  • 5
    • 84992965924 scopus 로고    scopus 로고
    • Methodology for integrating concurrent engineering concepts in a steelwork construction project
    • 1–3 September, (eds P.K. Chawdhry, P. Ghodous & D. Vandorpe), University of Bath, UK
    • Anumba, C.J., Baldwin, A.N., Bouchlaghem, D., Prasad, B., Cutting-Decelle, A.F., Dufau, J. & Mommessin, M. (1999) Methodology for integrating concurrent engineering concepts in a steelwork construction project. In: Advances in Concurrent Engineering, proceedings CE99, 1–3 September (eds P.K. Chawdhry, P. Ghodous & D. Vandorpe), pp. 479–488. University of Bath, UK.
    • (1999) Advances in Concurrent Engineering, proceedings CE99 , pp. 479-488
    • Anumba, C.J.1    Baldwin, A.N.2    Bouchlaghem, D.3    Prasad, B.4    Cutting-Decelle, A.F.5    Dufau, J.6    Mommessin, M.7
  • 8
    • 0032202502 scopus 로고    scopus 로고
    • Understanding concurrent engineering implementation: a case-study approach
    • Brookes, N.J. & Backhouse, C.J. (1998) Understanding concurrent engineering implementation: a case-study approach. International Journal of Production Research, 36(11), 3035–3054.
    • (1998) International Journal of Production Research , vol.36 , Issue.11 , pp. 3035-3054
    • Brookes, N.J.1    Backhouse, C.J.2
  • 9
    • 0004623914 scopus 로고    scopus 로고
    • Developing originating requirements: defining the design decisions
    • Buede, D.M. (1997) Developing originating requirements: defining the design decisions. IEEE Transactions on Aerospace and Electronic Systems, 33, 596–609.
    • (1997) IEEE Transactions on Aerospace and Electronic Systems , vol.33 , pp. 596-609
    • Buede, D.M.1
  • 11
    • 0011107673 scopus 로고    scopus 로고
    • CIB, Thomas Telford, London
    • Construction Industry Board (CIB) (1997) Briefing the Team (Working Group 1). CIB, Thomas Telford, London.
    • (1997) Briefing the Team (Working Group 1)
  • 19
    • 0003133862 scopus 로고
    • The nature, classification and management of tools and resources for concurrent engineering
    • Pittsburgh, Pennsylvania, August 29–31 (eds A. J. Paul & M. Sobolewski), Concurrent Technologies Corporation, Johnstown, PA
    • Evbuomwan, N.F.O. & Sivaloganathan, S. (1994) The nature, classification and management of tools and resources for concurrent engineering. In: Proceedings of Concurrent Engineering, 1994 Conference, Pittsburgh, Pennsylvania, August 29–31 (eds A. J. Paul & M. Sobolewski), pp. 119–128. Concurrent Technologies Corporation, Johnstown, PA.
    • (1994) Proceedings of Concurrent Engineering, 1994 Conference , pp. 119-128
    • Evbuomwan, N.F.O.1    Sivaloganathan, S.2
  • 20
    • 0003102815 scopus 로고
    • State of the art report on concurrent engineering
    • August 29–31, Pittsburgh, Pennsylvania (eds A. J. Paul & M. Sobolewski), Concurrent Technologies Corporation, Johnstown, PA
    • Evbuomwan, N.F.O., Sivaloganathan, S. & Jebb, A. (1994) State of the art report on concurrent engineering. In: Proceedings of Concurrent Engineering, 1994 Conference, August 29–31, Pittsburgh, Pennsylvania (eds A. J. Paul & M. Sobolewski), pp. 35–44. Concurrent Technologies Corporation, Johnstown, PA.
    • (1994) Proceedings of Concurrent Engineering, 1994 Conference , pp. 35-44
    • Evbuomwan, N.F.O.1    Sivaloganathan, S.2    Jebb, A.3
  • 23
    • 0347461287 scopus 로고
    • Occasional Paper No. 7, Department of Construction, Management and Engineering, University of Reading, UK
    • Goodacre, P., Pain, J., Murray, J. & Noble, M. (1982) Research in building design. Occasional Paper No. 7, Department of Construction, Management and Engineering, University of Reading, UK.
    • (1982) Research in building design
    • Goodacre, P.1    Pain, J.2    Murray, J.3    Noble, M.4
  • 26
    • 0004624926 scopus 로고    scopus 로고
    • Controlling the client
    • 17 October
    • Howie, W. (1996) Controlling the client. New Civil Engineer, 17 October, 12.
    • (1996) New Civil Engineer , pp. 12
    • Howie, W.1
  • 28
    • 0004573260 scopus 로고    scopus 로고
    • Fast or concurrent: the art of getting construction improved
    • (ed. L. Alarcon)
    • Huovila, P., Koskela, L. & Lautanala, M. (1997) Fast or concurrent: the art of getting construction improved. In: Lean Construction (ed. L. Alarcon), pp. 143–159.
    • (1997) Lean Construction , pp. 143-159
    • Huovila, P.1    Koskela, L.2    Lautanala, M.3
  • 29
    • 84993070649 scopus 로고    scopus 로고
    • Institution of Civil Engineers (ICE)
    • Thomas Telford, London
    • A. A. Balkema, Rotterdam. Institution of Civil Engineers (ICE) (1996) Creating Value in Engineering. Thomas Telford, London.
    • (1996) Creating Value in Engineering
    • Balkema, A.A.1
  • 30
    • 0003870515 scopus 로고
    • Integration definition for function modelling (IDEF-0)
    • National Institute of Standards and Technology, USA
    • Integration Definition (IDEF) (1993) Integration definition for function modelling (IDEF-0). FIPS Publication 183. National Institute of Standards and Technology, USA.
    • (1993) FIPS Publication , vol.183
  • 39
    • 0031104075 scopus 로고    scopus 로고
    • Evaluation of factors influencing construction clients' decision to build
    • Kometa, ST. & Olomolaiye, P.O. (1997) Evaluation of factors influencing construction clients' decision to build. Journal of Management in Engineering, 13, 77–86.
    • (1997) Journal of Management in Engineering , vol.13 , pp. 77-86
    • Kometa, S.T.1    Olomolaiye, P.O.2
  • 41
    • 84892057822 scopus 로고
    • Facilitating conceptual design in concurrent engineering
    • McLean, Virginia (eds A. J. Paul & M. Sobolewski), Concurrent Technologies Corporation, Johnstown, PA
    • Kuan, K-K. (1995) Facilitating conceptual design in concurrent engineering. In: Proceedings Concurrent Engineering 1995 Conference, McLean, Virginia (eds A. J. Paul & M. Sobolewski), pp. 223–229. Concurrent Technologies Corporation, Johnstown, PA.
    • (1995) Proceedings Concurrent Engineering 1995 Conference , pp. 223-229
    • Kuan, K.-K.1
  • 50
    • 0003431001 scopus 로고    scopus 로고
    • Integrated Products and Process Organization. Prentice Hall PTR, New Jersey
    • Prasad, B. (1996) Concurrent Engineering Fundamentals. Vol. 1: Integrated Products and Process Organization. Prentice Hall PTR, New Jersey.
    • (1996) Concurrent Engineering Fundamentals , vol.1
    • Prasad, B.1
  • 51
    • 84992812901 scopus 로고    scopus 로고
    • How tools and techniques in concurrent engineering contribute towards easing co-operation, creativity and uncertainty (Editorial)
    • Prasad, B. (1998) How tools and techniques in concurrent engineering contribute towards easing co-operation, creativity and uncertainty (Editorial). Concurrent Engineering: Research and Applications, 6, 2–6.
    • (1998) Concurrent Engineering: Research and Applications , vol.6 , pp. 2-6
    • Prasad, B.1
  • 52
    • 84993040717 scopus 로고    scopus 로고
    • RIBA, London
    • Royal Institue of British Architects (RIBA) (1997) RIBA Directory of Practices 1997. RIBA, London.
    • (1997) RIBA Directory of Practices 1997
  • 57
    • 0004043602 scopus 로고
    • The role of concurrent engineering in weapons system acquisition
    • IDA Report R-338. Institute for Defence Analyses, Alexandria, VA
    • Winner, R.I., Pennell, J.P., Bertrend, H.E. & Slusarczuk, M.M.G. (1988) The role of concurrent engineering in weapons system acquisition. In: IDA Report R-338. Institute for Defence Analyses, Alexandria, VA.
    • (1988)
    • Winner, R.I.1    Pennell, J.P.2    Bertrend, H.E.3    Slusarczuk, M.M.G.4
  • 58
    • 0004623913 scopus 로고
    • Effective project management results from establishing the optimum brief
    • Nov
    • Worthington, J. (1994) Effective project management results from establishing the optimum brief. Property Review, Nov, 182–185.
    • (1994) Property Review , pp. 182-185
    • Worthington, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.