메뉴 건너뛰기




Volumn 1, Issue 3, 2001, Pages 191-207

Construction scheduling using 3-D CAD and walk-thru

Author keywords

3 D CAD; Planning; Project management; Scheduling; Walk thru

Indexed keywords


EID: 84993083243     PISSN: 14714175     EISSN: 14770857     Source Type: Journal    
DOI: 10.1108/14714170110814604     Document Type: Article
Times cited : (10)

References (15)
  • 2
    • 0034217297 scopus 로고    scopus 로고
    • Telepresence in concurrent lifecycle design and construction
    • Anumbra, C.J. and Duke, A.K. 2000: Telepresence in concurrent lifecycle design and construction. Artificial Intelligence in Engineering 14, 221–232.
    • (2000) Artificial Intelligence in Engineering , vol.14 , pp. 221-232
    • Anumbra, C.J.1    Duke, A.K.2
  • 3
    • 84993025792 scopus 로고    scopus 로고
    • Construction Management Pull in 4-D CADD
    • Orlando, FL: ASCE
    • Barrett, P. 2000: Construction Management Pull in 4-D CADD. Proceedings of Construction Congress VI. Orlando, FL: ASCE, 997–983.
    • (2000) Proceedings of Construction Congress VI , pp. 997-983
    • Barrett, P.1
  • 5
    • 0042806983 scopus 로고    scopus 로고
    • Benefits of 4-D models for facility owners and AEC service providers
    • Orlando, FL: ASCE
    • Collier, E. and Fischer, M. 2000: Benefits of 4-D models for facility owners and AEC service providers. Proceedings of Construction Congress VI. Orlando, FL: ASCE, 990–995.
    • (2000) Proceedings of Construction Congress VI , pp. 990-995
    • Collier, E.1    Fischer, M.2
  • 6
    • 0034324927 scopus 로고    scopus 로고
    • An Industry Foundation Class Web-based Collaborative Construction Computer Environment: WISPER
    • Faraj, I., Alshawi, M., Aouad, G., Child, T. and Underwood, J. 2001: An Industry Foundation Class Web-based Collaborative Construction Computer Environment: WISPER. Automation in Construction 10, 79–99.
    • (2001) Automation in Construction , vol.10 , pp. 79-99
    • Faraj, I.1    Alshawi, M.2    Aouad, G.3    Child, T.4    Underwood, J.5
  • 7
    • 58849160846 scopus 로고    scopus 로고
    • Beyond sphereland: 4-D-CAD in construction communications
    • Orlando, FL: ASCE
    • Fukai, D. 2000: Beyond sphereland: 4-D-CAD in construction communications. Proceedings of Construction Congress VI. Orlando, FL: ASCE, 1001–1006.
    • (2000) Proceedings of Construction Congress VI , pp. 1001-1006
    • Fukai, D.1
  • 8
    • 84930129118 scopus 로고
    • Microcomputer-Based Project Management for Small Engineering Firms
    • Glavinich, T. 1992: Microcomputer-Based Project Management for Small Engineering Firms. Journal of Management in Engineering 8, 53–62.
    • (1992) Journal of Management in Engineering , vol.8 , pp. 53-62
    • Glavinich, T.1
  • 10
    • 58849164818 scopus 로고    scopus 로고
    • Virtual reality: a solution to seamless technology integration in the AEC Industry
    • Orlando, FL
    • Issa, R. 2000: Virtual reality: a solution to seamless technology integration in the AEC Industry. Proceedings of Construction Congress VI. Orlando, FL: 1007–1013.
    • (2000) Proceedings of Construction Congress VI , pp. 1007-1013
    • Issa, R.1
  • 12
    • 0347234695 scopus 로고    scopus 로고
    • Planning and monitoring of construction projects using virtual reality
    • Retik, A. 1997: Planning and monitoring of construction projects using virtual reality. Project Management 15, 28–31.
    • (1997) Project Management , vol.15 , pp. 28-31
    • Retik, A.1
  • 15
    • 84992990953 scopus 로고    scopus 로고
    • From CAD to virtual real-lity: modelling approaches, data exchange and interactive 3-D building design tools
    • Whyte, J., Bouchlaghem, N., Thorpe, A. and McCaffer, R. 2000: From CAD to virtual real-lity: modelling approaches, data exchange and interactive 3-D building design tools. Automation in Construction 9, 221–232.
    • (2000) Automation in Construction , vol.9 , pp. 221-232
    • Whyte, J.1    Bouchlaghem, N.2    Thorpe, A.3    McCaffer, R.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.