메뉴 건너뛰기




Volumn 9, Issue 5-6, 2002, Pages 378-387

How building design imperatives constrain construction productivity and quality

Author keywords

Bespoke; Custom; Productivity; Quality; Standard; Tailored

Indexed keywords


EID: 84993021061     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/eb021232     Document Type: Review
Times cited : (8)

References (29)
  • 2
    • 13944284289 scopus 로고
    • Buildability: an Assessment
    • Construction Research and Information Association, London.
    • CIRIA (1983) Buildability: an Assessment. Special Publication 26. Construction Research and Information Association, London.
    • (1983) Special Publication 26
  • 3
    • 0013245028 scopus 로고    scopus 로고
    • Standardisation and pre-assembly: adding value to construction projects
    • Construction Industry Research and Information Association, London.
    • CIRIA (1999) Standardisation and pre-assembly: adding value to construction projects. CIRIA Report 176. Construction Industry Research and Information Association, London.
    • (1999) CIRIA Report 176
  • 4
    • 0004603683 scopus 로고    scopus 로고
    • A quantitative study of post contract award design changes in construction
    • Cox, I., Morris, J., Rogerson, J. & Jared, G. (1999) A quantitative study of post contract award design changes in construction. Construction Management and Economics, 17, 427–439.
    • (1999) Construction Management and Economics , vol.17 , pp. 427-439
    • Cox, I.1    Morris, J.2    Rogerson, J.3    Jared, G.4
  • 5
    • 0004047083 scopus 로고    scopus 로고
    • Centre for Strategic Studies in Construction, The University of Reading, UK.
    • CSSC (1996) Designing and Building a World-Class Industry. Centre for Strategic Studies in Construction, The University of Reading, UK.
    • (1996) Designing and Building a World-Class Industry
  • 6
    • 0003732501 scopus 로고    scopus 로고
    • Rethinking construction
    • Department of the Environment, Transport and the Regions, London.
    • DETR (1998) Rethinking construction. The Report of the Construction Industry Task Force. Department of the Environment, Transport and the Regions, London.
    • (1998) The Report of the Construction Industry Task Force
  • 9
    • 0032141143 scopus 로고    scopus 로고
    • An integrated framework for concurrent life-cycle design and construction
    • Evbuomwan, N. & Anumba, C. (1998) An integrated framework for concurrent life-cycle design and construction. Advances in Engineering Softzvare, 5, 587–597.
    • (1998) Advances in Engineering Softzvare , vol.5 , pp. 587-597
    • Evbuomwan, N.1    Anumba, C.2
  • 10
    • 0004127531 scopus 로고
    • Mitchell Publishing Company Limited, London.
    • Ferguson, I. (1989) Buildability in Practice. Mitchell Publishing Company Limited, London.
    • (1989) Buildability in Practice
    • Ferguson, I.1
  • 11
    • 0002908379 scopus 로고    scopus 로고
    • Construction as a manufacturing process?
    • Gann, D.M. (1996) Construction as a manufacturing process? Construction Management and Economics, 14, 437–450.
    • (1996) Construction Management and Economics , vol.14 , pp. 437-450
    • Gann, D.M.1
  • 12
    • 0004551528 scopus 로고
    • Buildability – the Construction Contribution
    • The Chartered Institute of Building, Ascot, UK.
    • Gray, C. (1983) Buildability – the Construction Contribution, Occasional Paper no. 29. The Chartered Institute of Building, Ascot, UK.
    • (1983) Occasional Paper no. 29
    • Gray, C.1
  • 14
    • 0032652329 scopus 로고    scopus 로고
    • Succeeding with ERP
    • Hare, D. (1999) Succeeding with ERP. Manufacturing Engineer, 78, 65–67.
    • (1999) Manufacturing Engineer , vol.78 , pp. 65-67
    • Hare, D.1
  • 18
    • 84993062550 scopus 로고    scopus 로고
    • Second sunrise
    • Jones, M. (1999) Second sunrise. Manufacturer, 2, 4–5.
    • (1999) Manufacturer , vol.2 , pp. 4-5
    • Jones, M.1
  • 19
    • 84993013890 scopus 로고
    • Concurrent engineering – an alternative way for the construction industry
    • APM, July
    • Jones, B. & Riley, M. (1994) Concurrent engineering – an alternative way for the construction industry. Project, APM, July, 17.
    • (1994) Project , pp. 17
    • Jones, B.1    Riley, M.2
  • 21
    • 0030245901 scopus 로고    scopus 로고
    • The renaissance: the beginning of the end for implicit buildability
    • Moore, D. (1996) The renaissance: the beginning of the end for implicit buildability. Building Research and Information, 24, 265.
    • (1996) Building Research and Information , vol.24 , pp. 265
    • Moore, D.1
  • 25
    • 0000298891 scopus 로고    scopus 로고
    • e-commerce/e-business/e-strategy
    • Roberts, A. (2000) e-commerce/e-business/e-strategy. Engineering Management Journal, 10, 250–251.
    • (2000) Engineering Management Journal , vol.10 , pp. 250-251
    • Roberts, A.1
  • 27
    • 84993071649 scopus 로고    scopus 로고
    • Construction product manufacturer of the year
    • October
    • Watson, K. (2001) Construction product manufacturer of the year. Contract Journal Awards Supplement, October, 38.
    • (2001) Contract Journal Awards Supplement , pp. 38
    • Watson, K.1
  • 28
    • 0034300309 scopus 로고    scopus 로고
    • Medical engineering gets back on its feet
    • Wells, O. (2000) Medical engineering gets back on its feet. Manufacturing Engineer, 79, 177–181.
    • (2000) Manufacturing Engineer , vol.79 , pp. 177-181
    • Wells, O.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.