메뉴 건너뛰기




Volumn 7, Issue 4, 2000, Pages 347-361

Identification of optimal size resources for a repetitive housing construction

Author keywords

Construction; Optimal; Queuing; Repetitive; Resources; Simulation

Indexed keywords


EID: 84992957233     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/eb021158     Document Type: Review
Times cited : (6)

References (14)
  • 6
  • 9
    • 0030673571 scopus 로고    scopus 로고
    • Computer assisted scheduling for repetitive construction second construction
    • El-Rayes, K. & Moselhi, O. (1997) Computer assisted scheduling for repetitive construction second construction. Speciality Conference Proceedings Montreal, CSCE 2, pp. 21–29.
    • (1997) Speciality Conference Proceedings Montreal, CSCE , vol.2 , pp. 21-29
    • El-Rayes, K.1    Moselhi, O.2
  • 12
    • 0028547191 scopus 로고
    • Visual simulation of construction projects on a microcomputer
    • Harun, Z.B. & Sing, G. (1994) Visual simulation of construction projects on a microcomputer. Simulation Practice and Theory, 2, 77–90.
    • (1994) Simulation Practice and Theory , vol.2 , pp. 77-90
    • Harun, Z.B.1    Sing, G.2
  • 14
    • 0033156974 scopus 로고    scopus 로고
    • Fuzzy optimal model for resource constrained construction scheduling
    • Leu, S., Chen, A. & Yang, C. (1999) Fuzzy optimal model for resource constrained construction scheduling. Journal of Computing in Engineering, ASCE, 13, 207–216.
    • (1999) Journal of Computing in Engineering, ASCE , vol.13 , pp. 207-216
    • Leu, S.1    Chen, A.2    Yang, C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.