-
1
-
-
0000816725
-
Branch-and-price
-
Barnhart, C., Johnson, E.L., Nemhauser, G.L., Savelsbergh, M.W.P., Vance, P.H., 1998. Branch-and-price: Column generation for solving huge integer programs. Operations Research 46, 316-332.
-
(1998)
Operations Research
, vol.46
, pp. 316-332
-
-
Barnhart, C.1
Johnson, E.L.2
Nemhauser, G.L.3
Savelsbergh, M.W.P.4
Vance, P.H.5
-
2
-
-
85040424712
-
Turordningsplanering
-
Bergström, J., Forsberg, D., Karlsson, J., 2002. Turordningsplanering. The Forest Research Institute of Sweden, Working paper, (in Swedish).
-
(2002)
The Forest Research Institute of Sweden, Working paper
-
-
Bergström, J.1
Forsberg, D.2
Karlsson, J.3
-
4
-
-
85040436477
-
Wood flow problems in the Swedish forestry
-
Carlsson, D., Rönnqvist, M., 1998. Wood flow problems in the Swedish forestry. Department of Mathematics, Linköping Institute of Technology, LiTH-MAT-R-1998-16, Sweden.
-
(1998)
Department of Mathematics, Linköping Institute of Technology, LiTH-MAT-R-1998-16
-
-
Carlsson, D.1
Rönnqvist, M.2
-
5
-
-
0039444463
-
Use of OR Systems in the Chilean Forestry Industry
-
Epstein, R., Morales, R., Seron, J., Weintraub, A., 1999a. Use of OR Systems in the Chilean Forestry Industry. Interfaces 29, (1), 7-29.
-
(1999)
Interfaces
, vol.29
, Issue.1
, pp. 7-29
-
-
Epstein, R.1
Morales, R.2
Seron, J.3
Weintraub, A.4
-
6
-
-
0033344908
-
A system for short term harvesting
-
Epstein, R., Weintraub, A., Chevalier, P., Gabarro, J., 1999b. A system for short term harvesting. European Journal of Operational Research 119, 427-439.
-
(1999)
European Journal of Operational Research
, vol.119
, pp. 427-439
-
-
Epstein, R.1
Weintraub, A.2
Chevalier, P.3
Gabarro, J.4
-
8
-
-
85040401627
-
-
th Pacific Northwest Skyline Symposium, 14-16 December 1992, Bellevue, Washington, College of Forest Resources, Box 352100, University of Washington, Seattle, Washington
-
th Pacific Northwest Skyline Symposium, 14-16 December 1992, Bellevue, Washington, College of Forest Resources, Box 352100, University of Washington, Seattle, Washington, pp. 241-247.
-
(1992)
Logger-PC for improved logging planning
, pp. 241-247
-
-
Jarmer, C.1
Sessions, J.2
-
9
-
-
85040416331
-
-
Department of Mathematics, Linköping Institute of Technology, LiTH-MAT-R-2002-15, Sweden
-
Karlsson, J., Rönnqvist, M., Bergström, J., 2002. Annual harvest planning. Department of Mathematics, Linköping Institute of Technology, LiTH-MAT-R-2002-15, Sweden.
-
(2002)
Annual harvest planning
-
-
Karlsson, J.1
Rönnqvist, M.2
Bergström, J.3
-
11
-
-
85040409605
-
-
Presentation at Mathematical Programming Symposium XV, Ann Arbor, MI
-
Marsten, R., 1994. Crew planning at Delta Airlines. Presentation at Mathematical Programming Symposium XV, Ann Arbor, MI.
-
(1994)
Crew planning at Delta Airlines
-
-
Marsten, R.1
-
13
-
-
85040398552
-
-
th IFIP TC7 Conference on System Modelling and Optimization, 12-16 July 1999, Cambridge, UK
-
th IFIP TC7 Conference on System Modelling and Optimization, 12-16 July 1999, Cambridge, UK.
-
(2000)
A model which integrates strategic and tactical aspects of forest harvesting. Proceedings of System Modelling and Optimization Methods, Theory and Applications
-
-
McNaughton, A.1
Rönnqvist, R.2
Ryan, D.3
-
14
-
-
0000565426
-
Comparison of random search algorithm and mixed integer programming for solving area-based forest plans
-
Nelson, J., Brodie, J.D., 1990. Comparison of random search algorithm and mixed integer programming for solving area-based forest plans. Canadian Journal of Forestry Research 20, 934-942.
-
(1990)
Canadian Journal of Forestry Research
, vol.20
, pp. 934-942
-
-
Nelson, J.1
Brodie, J.D.2
-
15
-
-
0019684059
-
An Integer programming approach to scheduling
-
North Holland, Amsterdam
-
Ryan, D.M., Foster, B.W., 1981. An Integer programming approach to scheduling. Computer Scheduling of Public Transport, North Holland, Amsterdam, pp.269-280.
-
(1981)
Computer Scheduling of Public Transport
, pp. 269-280
-
-
Ryan, D.M.1
Foster, B.W.2
-
16
-
-
0011272235
-
A hierachical approach to Forest Planning
-
Weintraub, A., Cholaky, A., 1991. A hierachical approach to Forest Planning. Forest Science 37, (2), 439-460.
-
(1991)
Forest Science
, vol.37
, Issue.2
, pp. 439-460
-
-
Weintraub, A.1
Cholaky, A.2
-
17
-
-
0028984214
-
Heuristic procedures for solving mixed-integer harvest scheduling-transportation planning models
-
Weintraub, A., Jones, G., Meacham, M., Magendzo, A., Magendzo, A., Malchuk, D., 1995. Heuristic procedures for solving mixed-integer harvest scheduling-transportation planning models. Canadian Journal of Forest Research 25, 19, 1618-1626.
-
(1995)
Canadian Journal of Forest Research
, vol.25
, Issue.19
, pp. 1618-1626
-
-
Weintraub, A.1
Jones, G.2
Meacham, M.3
Magendzo, A.4
Magendzo, A.5
Malchuk, D.6
-
18
-
-
0004180332
-
-
Wiley-Interscience Series in Discrete Mathematics and Optimization, Wiley, Chichester
-
Wolsey, L.A., 1998. Integer Programming. Wiley-Interscience Series in Discrete Mathematics and Optimization, Wiley, Chichester.
-
(1998)
Integer Programming
-
-
Wolsey, L.A.1
-
19
-
-
0028005584
-
A new heuristic to solve spatially constrained long-term harvest scheduling problems
-
Yoshimoto, A., Brodie, J.D., Session, J., 1994. A new heuristic to solve spatially constrained long-term harvest scheduling problems. Forest Science 40, 365-396.
-
(1994)
Forest Science
, vol.40
, pp. 365-396
-
-
Yoshimoto, A.1
Brodie, J.D.2
Session, J.3
|