-
1
-
-
78651098378
-
Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis
-
Jan.
-
W. K. V. Chan, J. G. Yi, and S. W. Ding, "Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis, " IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 5-16, Jan. 2011.
-
(2011)
IEEE Trans. Autom. Sci. Eng.
, vol.8
, Issue.1
, pp. 5-16
-
-
Chan, W.K.V.1
Yi, J.G.2
Ding, S.W.3
-
2
-
-
78651094962
-
Optimal scheduling of multicluster tools with constant robot moving times, part II: Tree-like topology configurations
-
Jan.
-
W. K. V. Chan, J. G. Yi, S. W. Ding, and D. Z. Song, "Optimal scheduling of multicluster tools with constant robot moving times, part II: Tree-like topology configurations, " IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 17-28, Jan. 2011.
-
(2011)
IEEE Trans. Autom. Sci. Eng.
, vol.8
, Issue.1
, pp. 17-28
-
-
Chan, W.K.V.1
Yi, J.G.2
Ding, S.W.3
Song, D.Z.4
-
3
-
-
0036769403
-
On throughput maximization in constant travel-time robotic cells
-
M. Dawande, C. Sriskandarajah, and S. Sethi, "On throughput maximization in constant travel-time robotic cells, " Manuf. Service Oper. Manage., vol. 4, no. 4, pp. 296-312, 2002.
-
(2002)
Manuf. Service Oper. Manage.
, vol.4
, Issue.4
, pp. 296-312
-
-
Dawande, M.1
Sriskandarajah, C.2
Sethi, S.3
-
4
-
-
33747443542
-
Multicluster tools scheduling: An integrated event graph and network model approach
-
Aug.
-
S. W. Ding, J. G. Yi, and M. T. Zhang, "Multicluster tools scheduling: An integrated event graph and network model approach, " IEEE Trans. Semicond. Manuf., vol. 19, no. 3, pp. 339-351, Aug. 2006.
-
(2006)
IEEE Trans. Semicond. Manuf.
, vol.19
, Issue.3
, pp. 339-351
-
-
Ding, S.W.1
Yi, J.G.2
Zhang, M.T.3
-
5
-
-
28244447024
-
Scheduling dual gripper robotic cells: One-unit cycles
-
I. G. Drobouchevitch, S. P. Sethi, and C. Sriskandarajah, "Scheduling dual gripper robotic cells: One-unit cycles, " Eur. J. Oper. Res., vol. 171, no. 2, pp. 598-631, 2006.
-
(2006)
Eur. J. Oper. Res.
, vol.171
, Issue.2
, pp. 598-631
-
-
Drobouchevitch, I.G.1
Sethi, S.P.2
Sriskandarajah, C.3
-
8
-
-
0041384559
-
Scheduling analysis of timed-constrained dual-armed cluster tools
-
Aug.
-
J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of timed-constrained dual-armed cluster tools, " IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, Aug. 2003.
-
(2003)
IEEE Trans. Semicond. Manuf.
, vol.16
, Issue.3
, pp. 521-534
-
-
Kim, J.-H.1
Lee, T.-E.2
Lee, H.-Y.3
Park, D.-B.4
-
9
-
-
84905857105
-
Schedule restoration for singlearmed cluster tools
-
Aug.
-
J.-H. Kim, M. C. Zhou, and T.-E. Lee, "Schedule restoration for singlearmed cluster tools, " IEEE Trans. Semicond. Manuf., vol. 27, no. 3, pp. 388-399, Aug. 2014.
-
(2014)
IEEE Trans. Semicond. Manuf.
, vol.27
, Issue.3
, pp. 388-399
-
-
Kim, J.-H.1
Zhou, M.C.2
Lee, T.-E.3
-
10
-
-
33646731658
-
Workload balancing and scheduling of a single-armed cluster tool
-
T.-E. Lee, H.-Y. Lee, and Y.-H. Shin, "Workload balancing and scheduling of a single-armed cluster tool, " in Proc. 5th APIEMS Conf., Gold Coast, QLD, Australia, 2004, pp. 1-15.
-
(2004)
Proc. 5th APIEMS Conf., Gold Coast, QLD, Australia
, pp. 1-15
-
-
Lee, T.-E.1
Lee, H.-Y.2
Shin, Y.-H.3
-
11
-
-
27644434964
-
An extended event graph with negative places and tokens for timed window constraints
-
Oct.
-
T.-E. Lee and S.-H. Park, "An extended event graph with negative places and tokens for timed window constraints, " IEEE Trans. Autom. Sci. Eng., vol. 2, no. 4, pp. 319-332, Oct. 2005.
-
(2005)
IEEE Trans. Autom. Sci. Eng.
, vol.2
, Issue.4
, pp. 319-332
-
-
Lee, T.-E.1
Park, S.-H.2
-
12
-
-
34447295641
-
Design of liveness-enforcing supervisors for flexible manufacturing systems using Petri nets
-
Jul.
-
Z. W. Li, H. S. Hu, and A. R. Wang, "Design of liveness-enforcing supervisors for flexible manufacturing systems using Petri nets, " IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol. 37, no. 4, pp. 517-526, Jul. 2007.
-
(2007)
IEEE Trans. Syst., Man, Cybern. C, Appl. Rev.
, vol.37
, Issue.4
, pp. 517-526
-
-
Li, Z.W.1
Hu, H.S.2
Wang, A.R.3
-
13
-
-
38149072549
-
A maximally permissive deadlock prevention policy for FMS based on Petri net siphon control and the theory of regions
-
Jan.
-
Z. W. Li, M. C. Zhou, and M. D. Jeng, "A maximally permissive deadlock prevention policy for FMS based on Petri net siphon control and the theory of regions, " IEEE Trans. Autom. Sci. Eng., vol. 5, no. 1, pp. 182-188, Jan. 2008.
-
(2008)
IEEE Trans. Autom. Sci. Eng.
, vol.5
, Issue.1
, pp. 182-188
-
-
Li, Z.W.1
Zhou, M.C.2
Jeng, M.D.3
-
14
-
-
84898789971
-
Optimal supervisory control of flexible manufacturing systems by Petri nets: A set classification approach
-
Apr.
-
Y. F. Chen, Z. W. Li, and M. C. Zhou, "Optimal supervisory control of flexible manufacturing systems by Petri nets: A set classification approach, " IEEE Trans. Autom. Sci. Eng., vol. 11, no. 2, pp. 549-563, Apr. 2014.
-
(2014)
IEEE Trans. Autom. Sci. Eng.
, vol.11
, Issue.2
, pp. 549-563
-
-
Chen, Y.F.1
Li, Z.W.2
Zhou, M.C.3
-
15
-
-
84919601071
-
Reconfigurable coordination of distributed discrete event control systems
-
Jan.
-
J. F. Zhang et al., "Reconfigurable coordination of distributed discrete event control systems, " IEEE Trans. Control Syst. Technol., vol. 23, no. 1, pp. 323-330, Jan. 2015.
-
(2015)
IEEE Trans. Control Syst. Technol.
, vol.23
, Issue.1
, pp. 323-330
-
-
Zhang, J.F.1
-
16
-
-
84927946434
-
Design of optimal Petri net controllers for disjunctive generalized mutual exclusion constraints
-
Jul.
-
Z. Y. Ma, Z. W. Li, and A. Giua, "Design of optimal Petri net controllers for disjunctive generalized mutual exclusion constraints, " IEEE Trans. Autom. Control, vol. 60, no. 7, pp. 1774-1785, Jul. 2015.
-
(2015)
IEEE Trans. Autom. Control
, vol.60
, Issue.7
, pp. 1774-1785
-
-
Ma, Z.Y.1
Li, Z.W.2
Giua, A.3
-
17
-
-
84929326377
-
Decentralized supervision of Petri nets with a coordinator
-
Jun.
-
J. H. Ye, Z. W. Li, and A. Giua, "Decentralized supervision of Petri nets with a coordinator, " IEEE Trans. Syst., Man, Cybern., Syst., vol. 45, no. 6, pp. 955-966, Jun. 2015.
-
(2015)
IEEE Trans. Syst., Man, Cybern., Syst.
, vol.45
, Issue.6
, pp. 955-966
-
-
Ye, J.H.1
Li, Z.W.2
Giua, A.3
-
18
-
-
84920738238
-
Dynamic low-power reconfiguration of real-time systems with periodic and probabilistic tasks
-
Jan.
-
X. Wang et al., "Dynamic low-power reconfiguration of real-time systems with periodic and probabilistic tasks, " IEEE Trans. Autom. Sci. Eng., vol. 12, no. 1, pp. 258-271, Jan. 2015.
-
(2015)
IEEE Trans. Autom. Sci. Eng.
, vol.12
, Issue.1
, pp. 258-271
-
-
Wang, X.1
-
19
-
-
84862509870
-
Deadlock control of automated manufacturing systems based on Petri nets-A literature review
-
Jul.
-
Z. W. Li, N. Q. Wu, and M. C. Zhou, "Deadlock control of automated manufacturing systems based on Petri nets-A literature review, " IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol. 42, no. 4, pp. 437-462, Jul. 2012.
-
(2012)
IEEE Trans. Syst., Man, Cybern. C, Appl. Rev.
, vol.42
, Issue.4
, pp. 437-462
-
-
Li, Z.W.1
Wu, N.Q.2
Zhou, M.C.3
-
20
-
-
0038291984
-
Systems of multiple cluster tools: Configuration, reliability, and performance
-
May
-
M.-J. Lopez and S.-C. Wood, "Systems of multiple cluster tools: Configuration, reliability, and performance, " IEEE Trans. Semicond. Manuf., vol. 16, no. 2, pp. 170-178, May 2003.
-
(2003)
IEEE Trans. Semicond. Manuf.
, vol.16
, Issue.2
, pp. 170-178
-
-
Lopez, M.-J.1
Wood, S.-C.2
-
21
-
-
84928482037
-
A novel algorithm for wafer sojourn time analysis of single-arm cluster tools with wafer residency time constraints and activity time variation
-
May
-
C. Pan, Y. Qiao, N. Q. Wu, and M. C. Zhou, "A novel algorithm for wafer sojourn time analysis of single-arm cluster tools with wafer residency time constraints and activity time variation, " IEEE Trans. Syst., Man, Cybern., Syst., vol. 45, no. 5, pp. 805-818, May 2015.
-
(2015)
IEEE Trans. Syst., Man, Cybern., Syst.
, vol.45
, Issue.5
, pp. 805-818
-
-
Pan, C.1
Qiao, Y.2
Wu, N.Q.3
Zhou, M.C.4
-
22
-
-
0030214772
-
Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput
-
Aug.
-
T. L. Perkinson, R. S. Gyurcsik, and P. K. MacLarty, "Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput, " IEEE Trans. Semicond. Manuf., vol. 9, no. 3, pp. 384-400, Aug. 1996.
-
(1996)
IEEE Trans. Semicond. Manuf.
, vol.9
, Issue.3
, pp. 384-400
-
-
Perkinson, T.L.1
Gyurcsik, R.S.2
MacLarty, P.K.3
-
23
-
-
0028481573
-
Single-wafer cluster tool performance: An analysis of throughput
-
Aug.
-
T. L. Perkinson, P. K. MacLarty, R. S. Gyurcsik, and R. K. Cavin, "Single-wafer cluster tool performance: An analysis of throughput, " IEEE Trans. Semicond. Manuf., vol. 7, no. 3, pp. 369-373, Aug. 1994.
-
(1994)
IEEE Trans. Semicond. Manuf.
, vol.7
, Issue.3
, pp. 369-373
-
-
Perkinson, T.L.1
MacLarty, P.K.2
Gyurcsik, R.S.3
Cavin, R.K.4
-
24
-
-
85027922358
-
Response policies to process module failure in single-arm cluster tools subject to wafer residency time constraints
-
Jul.
-
Y. Qiao, C.-R. Pan, N.-Q. Wu, and M. C. Zhou, "Response policies to process module failure in single-arm cluster tools subject to wafer residency time constraints, " IEEE Trans. Autom. Sci. Eng., vol. 12, no. 3, pp. 1125-1139, Jul. 2015.
-
(2015)
IEEE Trans. Autom. Sci. Eng.
, vol.12
, Issue.3
, pp. 1125-1139
-
-
Qiao, Y.1
Pan, C.-R.2
Wu, N.-Q.3
Zhou, M.C.4
-
25
-
-
84911111299
-
How to respond to process module failure in residency time-constrained single-arm cluster tools
-
Nov.
-
Y. Qiao, N. Q. Wu, C. R. Pan, and M. C. Zhou, "How to respond to process module failure in residency time-constrained single-arm cluster tools, " IEEE Trans. Semicond. Manuf., vol. 27, no. 4, pp. 462-474, Nov. 2014.
-
(2014)
IEEE Trans. Semicond. Manuf.
, vol.27
, Issue.4
, pp. 462-474
-
-
Qiao, Y.1
Wu, N.Q.2
Pan, C.R.3
Zhou, M.C.4
-
26
-
-
84912099375
-
Cycle time analysis of dual-arm cluster tools for wafer fabrication processes with multiple wafer revisiting times
-
Jan.
-
Y. Qiao, N. Q. Wu, Q. H. Zhu, and L. P. Bai, "Cycle time analysis of dual-arm cluster tools for wafer fabrication processes with multiple wafer revisiting times, " Comput. Oper. Res., vol. 53, pp. 252-260, Jan. 2015.
-
(2015)
Comput. Oper. Res.
, vol.53
, pp. 252-260
-
-
Qiao, Y.1
Wu, N.Q.2
Zhu, Q.H.3
Bai, L.P.4
-
27
-
-
84923257092
-
Schedulability and scheduling analysis of dual-arm cluster tools with wafer revisiting and residency time constraints based on a novel schedule
-
Mar.
-
Y. Qiao, N. Q. Wu, and M. C. Zhou, "Schedulability and scheduling analysis of dual-arm cluster tools with wafer revisiting and residency time constraints based on a novel schedule, " IEEE Trans. Syst., Man, Cybern., Syst., vol. 45, no. 3, pp. 472-484, Mar. 2015.
-
(2015)
IEEE Trans. Syst., Man, Cybern., Syst.
, vol.45
, Issue.3
, pp. 472-484
-
-
Qiao, Y.1
Wu, N.Q.2
Zhou, M.C.3
-
28
-
-
84863456306
-
Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation
-
Jul.
-
Y. Qiao, N. Q. Wu, and M. C. Zhou, "Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation, " IEEE Trans. Autom. Sci. Eng., vol. 9, no. 3, pp. 564-577, Jul. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.3
, pp. 564-577
-
-
Qiao, Y.1
Wu, N.Q.2
Zhou, M.C.3
-
29
-
-
0035485815
-
Avoiding deadlock and reducing starvation and blocking in automated manufacturing systems based on a Petri net model
-
Oct.
-
N. Q. Wu and M. C. Zhou, "Avoiding deadlock and reducing starvation and blocking in automated manufacturing systems based on a Petri net model, " IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 658-669, Oct. 2001.
-
(2001)
IEEE Trans. Robot. Autom.
, vol.17
, Issue.5
, pp. 658-669
-
-
Wu, N.Q.1
Zhou, M.C.2
-
30
-
-
0035485501
-
An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
-
Oct.
-
S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints, " IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 609-618, Oct. 2001.
-
(2001)
IEEE Trans. Robot. Autom.
, vol.17
, Issue.5
, pp. 609-618
-
-
Rostami, S.1
Hamidzadeh, B.2
Camporese, D.3
-
31
-
-
0031276238
-
A steadystate throughput analysis of cluster tools: Dual-blade versus single-blade robots
-
Nov.
-
S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steadystate throughput analysis of cluster tools: Dual-blade versus single-blade robots, " IEEE Trans. Semicond. Manuf., vol. 10, no. 4, pp. 418-424, Nov. 1997.
-
(1997)
IEEE Trans. Semicond. Manuf.
, vol.10
, Issue.4
, pp. 418-424
-
-
Venkatesh, S.1
Davenport, R.2
Foxhoven, P.3
Nulman, J.4
-
32
-
-
0032630279
-
Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model
-
May
-
N. Q. Wu, "Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model, " IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol. 29, no. 2, pp. 192-204, May 1999.
-
(1999)
IEEE Trans. Syst., Man, Cybern. C, Appl. Rev.
, vol.29
, Issue.2
, pp. 192-204
-
-
Wu, N.Q.1
-
33
-
-
77955311048
-
Process vs resource-oriented Petri net modeling of automated manufacturing systems
-
N. Q. Wu and M. C. Zhou, "Process vs resource-oriented Petri net modeling of automated manufacturing systems, " Asian J. Control, vol. 12, no. 3, pp. 267-280, 2010.
-
(2010)
Asian J. Control
, vol.12
, Issue.3
, pp. 267-280
-
-
Wu, N.Q.1
Zhou, M.C.2
-
35
-
-
84873617864
-
One-step look-ahead maximally permissive deadlock control of AMS by using Petri nets
-
N. Q. Wu, M. C. Zhou, and G. Hu, "One-step look-ahead maximally permissive deadlock control of AMS by using Petri nets, " ACM Trans. Embedded Comput. Syst., vol. 12, no. 1, 2013, Art. ID 10.
-
(2013)
ACM Trans. Embedded Comput. Syst.
, vol.12
, Issue.1
-
-
Wu, N.Q.1
Zhou, M.C.2
Hu, G.3
-
36
-
-
41149096280
-
Resource-oriented Petri net for deadlock avoidance in flexible assembly systems
-
Jan.
-
N. Q. Wu, M. C. Zhou, and Z. W. Li, "Resource-oriented Petri net for deadlock avoidance in flexible assembly systems, " IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol. 38, no. 1, pp. 56-69, Jan. 2008.
-
(2008)
IEEE Trans. Syst., Man, Cybern. A, Syst., Humans
, vol.38
, Issue.1
, pp. 56-69
-
-
Wu, N.Q.1
Zhou, M.C.2
Li, Z.W.3
-
37
-
-
85027923444
-
Short-term scheduling of crudeoil operations: Enhancement of crude-oil operations scheduling using a Petri net-based control-theoretic approach
-
Jun.
-
N. Q. Wu, M. C. Zhou, and Z. W. Li, "Short-term scheduling of crudeoil operations: Enhancement of crude-oil operations scheduling using a Petri net-based control-theoretic approach, " IEEE Robot. Autom. Mag., vol. 22, no. 2, pp. 64-76, Jun. 2015.
-
(2015)
IEEE Robot. Autom. Mag.
, vol.22
, Issue.2
, pp. 64-76
-
-
Wu, N.Q.1
Zhou, M.C.2
Li, Z.W.3
-
38
-
-
43849109024
-
A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
-
May
-
N. Q. Wu, C. B. Chu, F. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints, " IEEE Trans. Semicond. Manuf., vol. 21, no. 2, pp. 224-237, May 2008.
-
(2008)
IEEE Trans. Semicond. Manuf.
, vol.21
, Issue.2
, pp. 224-237
-
-
Wu, N.Q.1
Chu, C.B.2
Chu, F.3
Zhou, M.C.4
-
39
-
-
85027957575
-
Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes
-
Jan.
-
N. Q. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes, " IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 42-55, Jan. 2011.
-
(2011)
IEEE Trans. Autom. Sci. Eng.
, vol.8
, Issue.1
, pp. 42-55
-
-
Wu, N.Q.1
Chu, F.2
Chu, C.3
Zhou, M.4
-
40
-
-
84887067395
-
Petri net modeling and cycle-time analysis of dual-arm cluster tools with wafer revisiting
-
Jan.
-
N. Q. Wu, F. Chu, C. B. Chu, and M. C. Zhou, "Petri net modeling and cycle-time analysis of dual-arm cluster tools with wafer revisiting, " IEEE Trans. Syst., Man, Cybern., Syst., vol. 43, no. 1, pp. 196-207, Jan. 2013.
-
(2013)
IEEE Trans. Syst., Man, Cybern., Syst.
, vol.43
, Issue.1
, pp. 196-207
-
-
Wu, N.Q.1
Chu, F.2
Chu, C.B.3
Zhou, M.C.4
-
41
-
-
76849088211
-
Analysis of wafer sojourn time in dualarm cluster tools with residency time constraint and activity time variation
-
Feb.
-
N. Q. Wu and M. Zhou, "Analysis of wafer sojourn time in dualarm cluster tools with residency time constraint and activity time variation, " IEEE Trans. Semicond. Manuf., vol. 23, no. 1, pp. 53-64, Feb. 2010.
-
(2010)
IEEE Trans. Semicond. Manuf.
, vol.23
, Issue.1
, pp. 53-64
-
-
Wu, N.Q.1
Zhou, M.2
-
42
-
-
77950864273
-
A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis
-
Apr.
-
N. Q. Wu and M. C. Zhou, "A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis, " IEEE Trans. Autom. Sci. Eng., vol. 7, no. 2, pp. 303-315, Apr. 2010.
-
(2010)
IEEE Trans. Autom. Sci. Eng.
, vol.7
, Issue.2
, pp. 303-315
-
-
Wu, N.Q.1
Zhou, M.C.2
-
43
-
-
84859753478
-
Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets
-
Apr.
-
N. Q. Wu and M. C. Zhou, "Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets, " IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 446-454, Apr. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.2
, pp. 446-454
-
-
Wu, N.Q.1
Zhou, M.C.2
-
44
-
-
84855355646
-
Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation
-
Jan.
-
N. Q. Wu and M. C. Zhou, "Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation, " IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 203-209, Jan. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.1
, pp. 203-209
-
-
Wu, N.Q.1
Zhou, M.C.2
-
45
-
-
84887074610
-
A Petri-net-based scheduling strategy for dual-arm cluster tools with wafer revisiting
-
Sep.
-
N. Q. Wu, M. C. Zhou, F. Chu, and C. B. Chu, "A Petri-net-based scheduling strategy for dual-arm cluster tools with wafer revisiting, " IEEE Trans. Syst., Man, Cybern., Syst, vol. 43, no. 5, pp. 1182-1194, Sep. 2013.
-
(2013)
IEEE Trans. Syst., Man, Cybern., Syst
, vol.43
, Issue.5
, pp. 1182-1194
-
-
Wu, N.Q.1
Zhou, M.C.2
Chu, F.3
Chu, C.B.4
-
46
-
-
84900817063
-
Petri net-based optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in wafer fabrication
-
May
-
F. J. Yang, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Petri net-based optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in wafer fabrication, " IEEE Trans. Semicond. Manuf., vol. 27, no. 2, pp. 192-203, May 2014.
-
(2014)
IEEE Trans. Semicond. Manuf.
, vol.27
, Issue.2
, pp. 192-203
-
-
Yang, F.J.1
Wu, N.Q.2
Qiao, Y.3
Zhou, M.C.4
-
47
-
-
84911949394
-
Optimal one-wafer cyclic scheduling of single-arm multicluster tools with two-space buffering modules
-
Dec.
-
F. J. Yang, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Optimal one-wafer cyclic scheduling of single-arm multicluster tools with two-space buffering modules, " IEEE Trans. Syst., Man, Cybern., Syst, vol. 44, no. 12, pp. 1584-1597, Dec. 2014.
-
(2014)
IEEE Trans. Syst., Man, Cybern., Syst
, vol.44
, Issue.12
, pp. 1584-1597
-
-
Yang, F.J.1
Wu, N.Q.2
Qiao, Y.3
Zhou, M.C.4
-
48
-
-
84905834944
-
Petri net-based polynomially complex approach to optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in semiconductor manufacturing
-
Dec.
-
F. J. Yang, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Petri net-based polynomially complex approach to optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in semiconductor manufacturing, " IEEE Trans. Syst., Man, Cybern., Syst, vol. 44, no. 12, pp. 1598-1610, Dec. 2014.
-
(2014)
IEEE Trans. Syst., Man, Cybern., Syst
, vol.44
, Issue.12
, pp. 1598-1610
-
-
Yang, F.J.1
Wu, N.Q.2
Qiao, Y.3
Zhou, M.C.4
-
49
-
-
41949134365
-
Steady-state throughput and scheduling analysis of multicluster tools: A decomposition approach
-
Apr.
-
J. G. Yi, S. W. Ding, D. Z. Song, and M. T. Zhang, "Steady-state throughput and scheduling analysis of multicluster tools: A decomposition approach, " IEEE Trans. Autom. Sci. Eng., vol. 5, no. 2, pp. 321-336, Apr. 2008.
-
(2008)
IEEE Trans. Autom. Sci. Eng.
, vol.5
, Issue.2
, pp. 321-336
-
-
Yi, J.G.1
Ding, S.W.2
Song, D.Z.3
Zhang, M.T.4
-
51
-
-
84887980429
-
Petri net-based optimal one-wafer scheduling of single-arm multi-cluster tools in semiconductor manufacturing
-
Nov.
-
Q. H. Zhu, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Petri net-based optimal one-wafer scheduling of single-arm multi-cluster tools in semiconductor manufacturing, " IEEE Trans. Semicond. Manuf., vol. 26, no. 4, pp. 578-591, Nov. 2013.
-
(2013)
IEEE Trans. Semicond. Manuf.
, vol.26
, Issue.4
, pp. 578-591
-
-
Zhu, Q.H.1
Wu, N.Q.2
Qiao, Y.3
Zhou, M.C.4
-
52
-
-
84922529472
-
Scheduling of single-arm multi-cluster tools with wafer residency time constraints in semiconductor manufacturing
-
Feb.
-
Q. H. Zhu, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Scheduling of single-arm multi-cluster tools with wafer residency time constraints in semiconductor manufacturing, " IEEE Trans. Semicond. Manuf., vol. 28, no. 1, pp. 117-125, Feb. 2015.
-
(2015)
IEEE Trans. Semicond. Manuf.
, vol.28
, Issue.1
, pp. 117-125
-
-
Zhu, Q.H.1
Wu, N.Q.2
Qiao, Y.3
Zhou, M.C.4
-
53
-
-
84952761314
-
Petri net modeling and one-wafer scheduling of single-arm tree-like multi-cluster tools
-
Aug.
-
Q. H. Zhu, Y. Qiao, and M. C. Zhou, "Petri net modeling and one-wafer scheduling of single-arm tree-like multi-cluster tools, " in Proc. IEEE Int. Conf. Autom. Sci. Eng., Gothenburg, Sweden, Aug. 2015, pp. 292-297.
-
(2015)
Proc. IEEE Int. Conf. Autom. Sci. Eng., Gothenburg, Sweden
, pp. 292-297
-
-
Zhu, Q.H.1
Qiao, Y.2
Zhou, M.C.3
-
54
-
-
84929083727
-
Modeling and schedulability analysis of single-arm multi-cluster tools with residency time constraints via Petri nets
-
Aug.
-
Q. H. Zhu, N. Wu, Y. Qiao, and M. C. Zhou, "Modeling and schedulability analysis of single-arm multi-cluster tools with residency time constraints via Petri nets, " in Proc. 10th IEEE Int. Conf. Autom. Sci. Eng., Taipei, Taiwan, Aug. 2014, pp. 81-86.
-
(2014)
Proc. 10th IEEE Int. Conf. Autom. Sci. Eng., Taipei, Taiwan
, pp. 81-86
-
-
Zhu, Q.H.1
Wu, N.2
Qiao, Y.3
Zhou, M.C.4
-
55
-
-
84891520091
-
Petri net modeling and one-wafer scheduling of single-arm multi-cluster tools
-
Aug.
-
Q. H. Zhu, N. Wu, Y. Qiao, and M. Zhou, "Petri net modeling and one-wafer scheduling of single-arm multi-cluster tools, " in Proc. 9th IEEE Int. Conf. Autom. Sci. Eng., Madison, WI, USA, Aug. 2013, pp. 874-879.
-
(2013)
Proc. 9th IEEE Int. Conf. Autom. Sci. Eng., Madison, WI, USA
, pp. 874-879
-
-
Zhu, Q.H.1
Wu, N.2
Qiao, Y.3
Zhou, M.4
-
56
-
-
84887269835
-
Scheduling of single-arm multi-cluster tools to achieve the minimum cycle time
-
May
-
Q. H. Zhu, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Scheduling of single-arm multi-cluster tools to achieve the minimum cycle time, " in Proc. IEEE Int. Conf. Robot. Autom., Karlsruhe, Germany, May 2013, pp. 3555-3560.
-
(2013)
Proc. IEEE Int. Conf. Robot. Autom., Karlsruhe, Germany
, pp. 3555-3560
-
-
Zhu, Q.H.1
Wu, N.Q.2
Qiao, Y.3
Zhou, M.C.4
-
57
-
-
0035485301
-
Timed Petri nets in modeling and analysis of cluster tools
-
Oct.
-
W. M. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools, " IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 562-575, Oct. 2001.
-
(2001)
IEEE Trans. Robot. Autom.
, vol.17
, Issue.5
, pp. 562-575
-
-
Zuberek, W.M.1
-
58
-
-
84887855359
-
Functional and behavioral modeling of automated manufacturing systems
-
Boca Raton, FL, USA: CRC Press
-
R. Zurawski and M. C. Zhou, "Functional and behavioral modeling of automated manufacturing systems, " in Handbook of Industrial Electronic Engineering. Boca Raton, FL, USA: CRC Press, 1996, pp. 669-676.
-
(1996)
Handbook of Industrial Electronic Engineering
, pp. 669-676
-
-
Zurawski, R.1
Zhou, M.C.2
-
59
-
-
84923259118
-
Guest editorial: Special section on Petri nets in manufacturing
-
R. Zurawski and M. C. Zhou, "Guest editorial: Special section on Petri nets in manufacturing, " IEEE Trans. Ind. Electron., vol. 41, no. 6, pp. 565-566, 1994.
-
(1994)
IEEE Trans. Ind. Electron.
, vol.41
, Issue.6
, pp. 565-566
-
-
Zurawski, R.1
Zhou, M.C.2
-
60
-
-
0028714917
-
Petri nets and industrial applications: A tutorial
-
Dec.
-
R. Zurawski and M. C. Zhou, "Petri nets and industrial applications: A tutorial, " IEEE Trans. Ind. Electron., vol. 41, no. 6, pp. 567-583, Dec. 1994.
-
(1994)
IEEE Trans. Ind. Electron.
, vol.41
, Issue.6
, pp. 567-583
-
-
Zurawski, R.1
Zhou, M.C.2
|