-
1
-
-
70349461310
-
Facility productivity today can be planned, measured and controlled - do it
-
June
-
Sthahl, J.F., “Facility productivity today can be planned, measured and controlled - do it”, Industrial Engineering, June 1990.
-
(1990)
Industrial Engineering
-
-
Sthahl, J.F.1
-
2
-
-
84986092894
-
MH problems are business problems
-
May
-
Sims, R. Jr, “MH problems are business problems”, Industrial Engineering, May 1990.
-
(1990)
Industrial Engineering
-
-
Sims, R.1
-
4
-
-
0026765726
-
CLASS: computerized layout solutions using simulated annealing
-
Jajodia, S., Minis, I., Harhalakis, G. and Proth, J-M., “CLASS: computerized layout solutions using simulated annealing”, International Journal of Production Research, Vol. 30 No. 1, 1992.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.1
-
-
Jajodia, S.1
Minis, I.2
Harhalakis, G.3
Proth, J.-M.4
-
5
-
-
0026829547
-
Recent models and techniques for solving the layout problems
-
Heragu, S.S., “Recent models and techniques for solving the layout problems”, European Journal of Operational Research, Vol. 57, 1992, pp. 136-44.
-
(1992)
European Journal of Operational Research
, vol.57
, pp. 136-144
-
-
Heragu, S.S.1
-
6
-
-
0029208602
-
Computer-aided facility layout - a status report
-
Welgama, P.S. and Gibson, P.R., “Computer-aided facility layout - a status report”, International Journal of Advanced Manufacturing Technology, Vol. 10 No. 1, 1995.
-
(1995)
International Journal of Advanced Manufacturing Technology
, vol.10
, Issue.1
-
-
Welgama, P.S.1
Gibson, P.R.2
-
7
-
-
0009553471
-
The facilities layout problem in perspective
-
Vollmann, T.E. and Buffa, E.S., “The facilities layout problem in perspective”, Management Science, Vol. 12 No. 10, 1966.
-
(1966)
Management Science
, vol.12
, Issue.10
-
-
Vollmann, T.E.1
Buffa, E.S.2
-
8
-
-
0000936939
-
Graph theoretic heuristics for unequal-sized facility layout problems
-
Kim, J.Y. and Kim, Y.D., “Graph theoretic heuristics for unequal-sized facility layout problems”, Omega, Vol. 23 No. 4, 1995.
-
(1995)
Omega
, vol.23
, Issue.4
-
-
Kim, J.Y.1
Kim, Y.D.2
-
9
-
-
0016559355
-
Comparison of computer algorithms and visual based methods for plant layout
-
Scriabin, M. and Vergin, R.C., “Comparison of computer algorithms and visual based methods for plant layout”, Management Science, Vol. 22 No. 2, 1975.
-
(1975)
Management Science
, vol.22
, Issue.2
-
-
Scriabin, M.1
Vergin, R.C.2
-
10
-
-
33746136628
-
On a paper by Scriabin and Vergin
-
Buffa,E.S., “On a paper by Scriabin and Vergin”, Management Science, Vol. 23 No. 1, 1976.
-
(1976)
Management Science
, vol.23
, Issue.1
-
-
Buffa, E.S.1
-
11
-
-
84862183018
-
Computer and visual methods for plant layout - a rejoinder
-
Scriabin, M. and Vergin, R.C., “Computer and visual methods for plant layout - a rejoinder”, Management Science, Vol. 23 No. 1, 1976.
-
(1976)
Management Science
, vol.23
, Issue.1
-
-
Scriabin, M.1
Vergin, R.C.2
-
12
-
-
0344206803
-
Plant layout: computers versus humans
-
Coleman, D.R., “Plant layout: computers versus humans”, Management Science, Vol. 24 No. 1, 1977.
-
(1977)
Management Science
, vol.24
, Issue.1
-
-
Coleman, D.R.1
-
13
-
-
84909705231
-
A note on ‘comparison of computers, algorithms and visual based methods for plant layout’ by Scriabin, M. and Vergin, R.C.
-
Block, T.E., “A note on ‘comparison of computers, algorithms and visual based methods for plant layout’ by Scriabin, M. and Vergin, R.C.”, Management Science, Vol. 24 No. 2, 1977.
-
(1977)
Management Science
, vol.24
, Issue.2
-
-
Block, T.E.1
-
16
-
-
0002384937
-
Assignment problems and the location of economic activities
-
Koopmans, T.C. and Beckmann, M., “Assignment problems and the location of economic activities”, Econometrica, Vol. 25 No. 1, 1957.
-
(1957)
Econometrica
, vol.25
, Issue.1
-
-
Koopmans, T.C.1
Beckmann, M.2
-
17
-
-
0027577685
-
Exact optimal solution for facility layout - deciding which pairs of location should be adjacent
-
Houshyar, A. and White, B., “Exact optimal solution for facility layout - deciding which pairs of location should be adjacent”, Computers and Industrial Engineering, Vol. 24 No. 2, 1993.
-
(1993)
Computers and Industrial Engineering
, vol.24
, Issue.2
-
-
Houshyar, A.1
White, B.2
-
18
-
-
0022516277
-
The dynamics of plant layout
-
Rosenblatt, M.J., “The dynamics of plant layout”, Management Science, Vol. 32 No. 1, 1986.
-
(1986)
Management Science
, vol.32
, Issue.1
-
-
Rosenblatt, M.J.1
-
19
-
-
0027001772
-
Modelling uncertainties in plant layout problems
-
Palekar, V.S., Batta, R., Bosch, R.M. and Elhence, S., “Modelling uncertainties in plant layout problems”, European Journal of Operational Research, Vol. 63 No. 2, 1992.
-
(1992)
European Journal of Operational Research
, vol.63
, Issue.2
-
-
Palekar, V.S.1
Batta, R.2
Bosch, R.M.3
Elhence, S.4
-
20
-
-
0027593566
-
Multicriteria facility layout problem - an integrated approach
-
Shang, J.S., “Multicriteria facility layout problem - an integrated approach”, European Journal of Operational Research, Vol. 66 No. 3, 1993.
-
(1993)
European Journal of Operational Research
, vol.66
, Issue.3
-
-
Shang, J.S.1
-
21
-
-
0026831286
-
A graph-theoretic heuristics for designing loop-layout manufacturing systems
-
Leung, J., “A graph-theoretic heuristics for designing loop-layout manufacturing systems”, European Journal of Operational Research, Vol. 57 No. 2, 1992.
-
(1992)
European Journal of Operational Research
, vol.57
, Issue.2
-
-
Leung, J.1
-
22
-
-
0026829110
-
A non-linear optimization approach for solving facility layout problems
-
Vancamp, D.L.,Carter, M.V. and Vannelli, A., “A non-linear optimization approach for solving facility layout problems”, European Journal of Operational Research, Vol. 57 No. 2, 1992.
-
(1992)
European Journal of Operational Research
, vol.57
, Issue.2
-
-
Vancamp, D.L.1
Carter, M.V.2
Vannelli, A.3
-
23
-
-
0027353932
-
Generating a layout from a design skeleton
-
Montreuil, B., Venkatadri, U. and Ratlift, H.D., “Generating a layout from a design skeleton”, IIE Transactions, Vol. 25 No. 1, 1993.
-
(1993)
IIE Transactions
, vol.25
, Issue.1
-
-
Montreuil, B.1
Venkatadri, U.2
Ratlift, H.D.3
-
24
-
-
0025799099
-
A hybrid heuristic for the facilities layout problem
-
Kaku, B.K., Thompson,T.E. and Morton, T.E., “A hybrid heuristic for the facilities layout problem”, Computers and Operations Research, Vol. 18 No. 93, 1991.
-
(1991)
Computers and Operations Research
, vol.18
, Issue.93
-
-
Kaku, B.K.1
Thompson, T.E.2
Morton, T.E.3
-
25
-
-
0022108442
-
MICROLAY: an interactive computer program for factory layout planning on microcomputers
-
Wäscher, G. and Chamoni, P., “MICROLAY: an interactive computer program for factory layout planning on microcomputers”, European Journal of Operational Research, Vol. 31, No. 2, 1987.
-
(1987)
European Journal of Operational Research
, vol.31
, Issue.2
-
-
Wäscher, G.1
Chamoni, P.2
-
26
-
-
0000970291
-
A heuristic algorithm and simulation approach to relative location of facilities
-
Armour, G.C. and Buffa, E.S., “A heuristic algorithm and simulation approach to relative location of facilities”, Management Science, Vol. 9, 1963, pp. 294-309.
-
(1963)
Management Science
, vol.9
, pp. 294-309
-
-
Armour, G.C.1
Buffa, E.S.2
-
27
-
-
84952536173
-
-
American Institute of Industrial Engineers, Norcross, GA
-
Deiseroth, M.P. and Apple, J.M., A Computerized Plant Layout Analysis and Evaluation Technique (PLANET), American Institute of Industrial Engineers, Norcross, GA, 1972.
-
(1972)
A Computerized Plant Layout Analysis and Evaluation Technique (PLANET)
-
-
Deiseroth, M.P.1
Apple, J.M.2
-
28
-
-
0019086564
-
DISCON: a new method for the layout problem
-
Drezner, Z., “DISCON: a new method for the layout problem”, Operations Research, Vol. 28 No. 6, 1980.
-
(1980)
Operations Research
, vol.28
, Issue.6
-
-
Drezner, Z.1
-
29
-
-
0014869934
-
Modular allocation technique (MAT)
-
Edwards, H.K., Gillett, B.E. and Hale, M.E., “Modular allocation technique (MAT)”, Management Science, Vol. 17 No. 3, 1970.
-
(1970)
Management Science
, vol.17
, Issue.3
-
-
Edwards, H.K.1
Gillett, B.E.2
Hale, M.E.3
-
30
-
-
0016950002
-
CRAFT M for layout arrangements
-
Hicks, P.E. and Cowan, T.E., “CRAFT M for layout arrangements”, Journal of Industrial Engineering, Vol. 14, 1976, pp. 30-5.
-
(1976)
Journal of Industrial Engineering
, vol.14
, pp. 30-35
-
-
Hicks, P.E.1
Cowan, T.E.2
-
31
-
-
0002037592
-
Quadratic assignment problem algorithms and the location of indivisible facilities
-
Hillier, F.S. and Connors, M.M., “Quadratic assignment problem algorithms and the location of indivisible facilities”, Management Science, Vol. 13 No. 1, 1966.
-
(1966)
Management Science
, vol.13
, Issue.1
-
-
Hillier, F.S.1
Connors, M.M.2
-
32
-
-
0020115841
-
SPACECRAFT for multi-floor layout planning
-
Johnson, R.V., “SPACECRAFT for multi-floor layout planning”, Management Science, Vol. 28 No. 4, 1982.
-
(1982)
Management Science
, vol.28
, Issue.4
-
-
Johnson, R.V.1
-
35
-
-
0000965291
-
An experimental comparison of techniques for the assignment of facilities to locations
-
Nugent, C.E., Vollmann, T.E. and Ruml, J., “An experimental comparison of techniques for the assignment of facilities to locations”, Operations Research, Vol. 16 No. 1, 1968.
-
(1968)
Operations Research
, vol.16
, Issue.1
-
-
Nugent, C.E.1
Vollmann, T.E.2
Ruml, J.3
-
37
-
-
0016993551
-
An applied model for the facilities design problem
-
Tompkins, P.A. and Reed Jr, R., “An applied model for the facilities design problem”, International Journal of Production Research, Vol. 14 No. 5, 1976.
-
(1976)
International Journal of Production Research
, vol.14
, Issue.5
-
-
Tompkins, P.A.1
Reed, R.2
-
38
-
-
84986180440
-
Heseltine calls for benchmarking, 14 November
-
The Times, “Heseltine calls for benchmarking”, 14 November 1995.
-
(1995)
The Times
-
-
-
40
-
-
18844397848
-
Looking at customer service in a drinks company
-
Canen, A.G. and Lawrie, N.L., “Looking at customer service in a drinks company”, Logistics Information Management, Vol. 8 No. 1, 1995.
-
(1995)
Logistics Information Management
, vol.8
, Issue.1
-
-
Canen, A.G.1
Lawrie, N.L.2
-
42
-
-
0029389256
-
Making manufacturing practices tacit: a case study of computer-aided production management and lean production
-
Johnston, R.B., “Making manufacturing practices tacit: a case study of computer-aided production management and lean production”, Journal of the Operational Research Society, Vol. 46 No. 10, 1995.
-
(1995)
Journal of the Operational Research Society
, vol.46
, Issue.10
-
-
Johnston, R.B.1
|