메뉴 건너뛰기




Volumn 17, Issue 11, 1999, Pages 423-430

Evaluation of the engineer's personnel's role in enhancing the project constructability

Author keywords

Construction industry; Design management; Engineers; Planning

Indexed keywords


EID: 84986166530     PISSN: 02632772     EISSN: None     Source Type: Journal    
DOI: 10.1108/02632779910291895     Document Type: Article
Times cited : (21)

References (20)
  • 1
    • 84986071573 scopus 로고
    • Buildability: a structural engineer's view
    • February
    • Baxter, A. (1983), “Buildability: a structural engineer's view”, The Architects’ Journal, Vol. 117 No. 5, February, p. 30.
    • (1983) The Architects’ Journal , vol.117 , Issue.5 , pp. 30
    • Baxter, A.1
  • 2
    • 84986132101 scopus 로고
    • Field experience; another facet of professional development
    • December
    • Biggs, D.T. (1983), “Field experience; another facet of professional development”, Civil Engineering, ASCE, Vol. 53 No. 12, December, pp. 54-5.
    • (1983) Civil Engineering , vol.53 , Issue.12 , pp. 54-55
    • Biggs, D.T.1
  • 3
    • 84986026410 scopus 로고
    • BS 3138: glossary of terms used in work study”, London.
    • British Standards Institution (1979), “BS 3138: glossary of terms used in work study”, London.
    • (1979)
  • 4
    • 84873735367 scopus 로고
    • Constructability, a primer, publication 3-1
    • Construction Industry Institute, University of Texas at Austin, Austin, TX.
    • “Constructability, a primer, publication 3-1” (1986), Construction Industry Institute, University of Texas at Austin, Austin, TX.
    • (1986)
  • 5
    • 84986049369 scopus 로고
    • Constructability concepts file, publication 3-3”, Construction Industry Institute, University of Texas at Austin, Austin, TX.
    • “Constructability concepts file, publication 3-3” (1987), Construction Industry Institute, University of Texas at Austin, Austin, TX.
    • (1987)
  • 6
    • 84986151557 scopus 로고
    • Construction Industry Research Information Association (CIRIA) (1983), Building: An Assessment, Special Publication, Vol. 26.
    • (1983) Building: An Assessment , vol.26
  • 8
    • 4043057408 scopus 로고
    • Plan for constructability, part 1
    • January
    • Kerridge, A.E. (1993a), “Plan for constructability, part 1”, Hydrocarbon Processing, Vol. 72 No. 1, January, pp. 135-45.
    • (1993) Hydrocarbon Processing , vol.72 , Issue.1 , pp. 135-145
    • Kerridge, A.E.1
  • 9
    • 13944280041 scopus 로고
    • Plan for constructability, part 2
    • February
    • Kerridge, A.E. (1993b), “Plan for constructability, part 2”, Hydrocarbon Processing, Vol. 72 No. 2, February, pp. 151-8.
    • (1993) Hydrocarbon Processing , vol.72 , Issue.2 , pp. 151-158
    • Kerridge, A.E.1
  • 10
    • 0023306297 scopus 로고
    • Designing plans for constructability
    • March
    • King, R. (1987), “Designing plans for constructability”, Journal of Construction Engineering and Management, ASCE, Vol. 113 No. 1, March, pp. 1-5.
    • (1987) Journal of Construction Engineering and Management , vol.113 , Issue.1 , pp. 1-5
    • King, R.1
  • 12
    • 84986026413 scopus 로고    scopus 로고
    • Towards a zero defect construction culture
    • Technical report, Taywood Engineering Ltd, March.
    • Masat, J. (1998), “Towards a zero defect construction culture”, Technical report, Taywood Engineering Ltd, March.
    • (1998)
    • Masat, J.1
  • 13
    • 0027579589 scopus 로고
    • Fossil power plant constructability: applications of CII concepts
    • April
    • O'Connor, J.T. and Norwich, W.T. (1993), “Fossil power plant constructability: applications of CII concepts”, Journal of Energy Engineering, ASCE, Vol. 119 No. 1, April, pp. 55-73.
    • (1993) Journal of Energy Engineering , vol.119 , Issue.1 , pp. 55-73
    • O'Connor, J.T.1    Norwich, W.T.2
  • 15
    • 0004139859 scopus 로고
    • John Wiley & Sons, New York, NY.
    • Oglesby C.H. (1975), Highway Engineering, 3rd ed., John Wiley & Sons, New York, NY.
    • (1975) Highway Engineering
    • Oglesby, C.H.1
  • 16
    • 0023833989 scopus 로고
    • Bridges-design for construction
    • Tappin, R. (1988), “Bridges-design for construction”, Civil Engineering, London, January-February, pp. 10-11, 13-14.
    • (1988) Civil Engineering , pp. 10-11
    • Tappin, R.1
  • 17
    • 0023363812 scopus 로고
    • Improving constructability during conceptual planning
    • June
    • Tatum, C.B. (1987), ‘‘Improving constructability during conceptual planning”, Journal of Construction Engineering and Management, ASCE, Vol. 113 No. 2, June, pp. 191-207.
    • (1987) Journal of Construction Engineering and Management , vol.113 , Issue.2 , pp. 191-207
    • Tatum, C.B.1
  • 19
    • 84986151511 scopus 로고
    • Buildability a quantity surveyor's view
    • February
    • Williams, B. (1983), “Buildability a quantity surveyor's view”, The Architects’ Journal, Vol. 117 No. 6, February, p. 33.
    • (1983) The Architects’ Journal , vol.117 , Issue.6 , pp. 33
    • Williams, B.1
  • 20
    • 84986167530 scopus 로고    scopus 로고
    • The influence of design on construction site productivity
    • Technical Report, Taywood Engineering Ltd, July.
    • Wilson, M.J. (1997), “The influence of design on construction site productivity”, Technical Report, Taywood Engineering Ltd, July.
    • (1997)
    • Wilson, M.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.